Paulus Civil Engineering Journal
Vol 5 No 1 (2023): Paulus Civil Engineering Journal, Volume 5, No.1

Penerapan Manajemen Waktu Pada Pembangunan Basement Proyek 31 Sudirman Suites Makassar

Intan Tangdan (Universitas Kristen Indonesia Paulus)
Meti (Universitas Kristen Indonesia Paulus)
Josefine Ernestine Latupeirissa (Universitas Kristen Indonesia Paulus)



Article Info

Publish Date
31 Mar 2023

Abstract

Along with the development of the community's need for housing, it has an effect on the rapid development of construction projects in Indonesia, especially in this study, we will discuss apartment housing facilities. The purpose of this research is to understand the obstacles that occur in the basement work of the 31 Sudirman Suites Makassar development project and to analyze alternative scheduling of the basement work of the 31 Sudirman Suites Makassar project using the PERT method. Based on data analysis, it was found that the obstacles that occurred in the basement work of the 31 Sudirman Suites Makassar development project were work delays, changes in job specifications and waiting for confirmation of job specifications from the owner. alternative schedule using the PERT method, obtained a work completion time of 109 weeks while the initial planning time was 115 weeks. Thus scheduling using the PERT method is faster than the initial scheduling plan.

Copyrights © 2023






Journal Info

Abbrev

pcej

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Paulus Civil Engineering Journal (PCEJ) is a civil engineering scientific journal publishes every four months, March, June, September, and December. The first volume of PCEJ was published in 2019 with the mission of being a pioneer in publishing information media on the development of Civil ...