ANALISIS DAN RISIKO METODE FAST TRACK DAN CRASH PROGRAM PADA PROYEK GEDUNG

Khiyana, A'izzatul (Unknown)
Sundari, Titin (Unknown)
Yulianto, Totok (Unknown)
Nugroho, Meriana Wahyu (Unknown)
Agung, Achmad Imam (Unknown)



Article Info

Publish Date
31 Jan 2025

Abstract

Project delay is a major issue in execution, often causing cost overruns if not addressed. Acceleration helps meet targets and increase profits. Research on fast track and crash programme methods is extensive, but mainly focuses on case studies rather than risks or work quality. Building X’s construction project faced a 3rd-week delay, extending from 23 weeks (December 2022) to 25 weeks (January 2023). This study aims to determine the most time- and cost-efficient acceleration method using primary (questionnaire) and secondary data (S-curve, unit price analysis, budget plan, and project reports). Applying fast track and crash programme methods along with risk frequency analysis, the study identifies the fast-track method as optimal, reducing project time to 22 weeks with 12% efficiency and Rp. 759,698,484.61 in cost savings. However, a potential risk is concrete cracks due to acceleration. This research complements previous studies by integrating risk analysis and quality assessment in fast-track acceleration.

Copyrights © 2025






Journal Info

Abbrev

jpensil

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Education Other

Description

In general, the Jurnal Pensil : Pendidikan Teknik Sipil accepts manuscripts with the themes: Education Strategy and Management, Industrial Relations, and Civil and Structural Engineering. Jurnal Pensil : Pendidikan Teknik Sipil is intended for all academics in Civil Engineering Vocational Education. ...