PENJADWALAN PROYEK DENGAN METODE ACTIVITY ON ARROW (AOA) PADA PEMBANGUNAN ECOBRICK DLH SEMARANG

Chasanah, Ummi (Unknown)
Kiswati, Sri (Unknown)
Soehartono, Soehartono (Unknown)



Article Info

Publish Date
30 Jun 2021

Abstract

Scheduling a construction in the presence of various obstacles including work delays that result in time delays from the planned time. The research method used to obtain data is carried out directly from the research object. So the research used the AOA (Activity On Arrow) method. This writing method begins with the calculation of ES, LS, EF, LF, and then AOA. Based on the results of the analysis used, the needs and implementation of the project have been categorized as good enough, but not supported by proper supervision. By applying the right AOA method, the amount of time required for each activity can be known and the critical trajectory of the work process can be known. The proper supervision is needed when the AOA method has a critical path / path. With the analysis of the AOA method, it takes 112 calendar days

Copyrights © 2021






Journal Info

Abbrev

jtsgu

Publisher

Subject

Civil Engineering, Building, Construction & Architecture Transportation

Description

Jurnal ini bertujuan untuk menyediakan platform bagi para ilmuwan dan akademisi di seluruh dunia untuk mempromosikan, berbagi, dan mendiskusikan berbagai masalah dan perkembangan baru di berbagai bidang teknik ...