Formosa Journal of Science and Technology (FJST)
Vol. 5 No. 1 (2026): January 2026

A Comparative Study of Materials in the Design of Concrete and Asphalt Road Pavements in Terms of Cost and Time (Case Study of the Sumberwudi-Maduran Road Section, Lamongan Regency, East Java Province)

Johan Sanjoko (Universitas 17 Agustus 1945 Surabaya)
Andi Patriadi (Universitas 17 Agustus 1945 Surabaya)
Retno Hastijanti (Universitas 17 Agustus 1945 Surabaya)



Article Info

Publish Date
31 Jan 2026

Abstract

This research is highly urgent in bridging the knowledge gap between standard theory, field practice, and the dynamics of current industrial area development. The construction and periodic maintenance budget for asphalt road pavement with a duration of 20 years requires a cost of Rp. 17,638,200,000.00, then the construction and periodic maintenance budget for asphalt road pavement with a duration of 40 years requires a cost of Rp. 52,225,100,000.00. The construction and periodic maintenance budget for 20-year UR concrete road pavement requires a cost of Rp. 9,063,000,000.00, then the construction and periodic maintenance budget for 40-year UR concrete road pavement requires a cost of Rp. 15,031,400,000.00.

Copyrights © 2026






Journal Info

Abbrev

fjst

Publisher

Subject

Humanities Computer Science & IT Education Industrial & Manufacturing Engineering Social Sciences

Description

Formosa Journal of Science and Technology (FJST) is an open-access scientific journal that publishing full-length research papers and review articles covering subjects that fall under the wide spectrum of science and technology. FJST journal is dedicated towards dissemination of knowledge related to ...