Claim Missing Document
Check
Articles

Found 5 Documents
Search

PENDAMPINGAN PEMETAAN PRASARANA, SARANA DAN UTILITAS UMUM (PSU) PERUMAHAN BERBASIS SIG DI KABUPATEN MAGETAN Andi Patriadi; Retno Trimurtiningrum; Muhammad Fauzi Mazaruddin; Dini Nur Maulina Santi
RESWARA: Jurnal Pengabdian Kepada Masyarakat Vol 4, No 1 (2023)
Publisher : Universitas Dharmawangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46576/rjpkm.v4i1.2529

Abstract

Data digital mengenai penyerahan PSU (e-PSU) yang dapat diakses dengan mudah oleh masyarakat menjadi krusial. Sehingga masyarakat yang hendak melakukan pembelian rumah di perumahan teredukasi dan dapat memilih perumahan yang telah menyerahkap PSU guna memperoleh jaminan keberlangsungan lingkungan perumahan yang akan ditinggali. Untuk mencapai tujuan tersebut, diperlukan langkah awal pengenalan metode SIG terhadap pelaku penertib kebijakan yaitu pegawai pada instansi yang membidangi penyerahan PSU yaitu Dinas Perumahan dan Kawasan Permukiman. Instansi tersebut berhasil melakukan simulasi SIG dari beberapa kumpulan atribut file yang isinya data-data PSU. Pengembangan project file kini dikembangkan secara mandiri dan rencana pembuatan baru di project file lainnya
Analysis of Quality Control Strategy Using The Statistical Process Control (SPC) Method In The Mass Product Housing Project at Java Residence Cluster Kukuh Budi Prasetiya; Andi Patriadi; Sajiyo Sajiyo
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.476

Abstract

The advancement of industrial activities requires high-performance management to achieve desired outcomes, particularly in complex projects such as construction. This study aims to analyze the application of the Statistical Process Control (SPC) method to improve product quality in the construction project of the Java Residence Cluster in Sidoarjo. Managing cost, time, and quality remains a significant challenge in construction projects. This research focuses on identifying and addressing complaints or defects in housing units that affect the quality of the project, using SPC as a quality control method. Data were collected from primary sources, specifically from the staff of PT. Mitra Usaha Konstruksi, as well as secondary data from relevant literature. The analysis shows that the application of SPC successfully reduced the number of complaints or defects from 5.95 complaints per unit in Cluster 1 Phase 3 to 3.12 complaints per unit in Cluster 2 Phase 1, with an effectiveness rate of 52.47%. Pareto analysis identified that the majority of complaints were related to doors, windows, and wall paint, suggesting that these areas should be prioritized for improvement in future construction projects. The study recommends the continued use of SPC to improve product quality and identify the root causes of defects to ensure compliance with the developer's quality targets.
Analysis of Time and Budget Efficiency In The Bungur-Kedoyo Road Project Using Earned Value Method M. Sulton Bahrudin; Andi Patriadi; Sajiyo Sajiyo
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.477

Abstract

The Bungur-Kedoyo road construction project in Tulungagung Regency represents a critical infrastructure initiative aimed at enhancing connectivity and transportation efficiency. However, challenges in managing time and cost effectively remain significant in ensuring project success. This study aims to evaluate the performance of the project using the Earned Value Method (EVM), a comprehensive framework that integrates cost and schedule analysis. EVM metrics, including Schedule Estimate To Completion (SETC), Schedule Estimate At Completion (SEAC), Budget Estimate To Completion (BETC), and Budget Estimate At Completion (BEAC), were employed to monitor and forecast project progress. The findings indicate that the project is largely on schedule, with an estimated additional week required to complete the remaining 96.908% of work, extending the contracted timeline of 180 days slightly. The remaining cost is projected at Rp. 273,570,437.28, and the total expenditure remains below the contract value at Rp. 8,847,685,552.51 out of Rp. 10,640,186,000. These results highlight the effectiveness of EVM in providing precise tracking and forecasting, ensuring the project stays within budget while achieving its objectives. The study concludes that EVM is a valuable tool for managing complex construction projects, offering actionable insights to improve time and cost efficiency for similar future endeavors.
Time Analysis and Cost Estimation of Construction of Village Water Distribution Works For Clean Water Needs (Case Study of Tamangil Nuhuten Village, South Kei Besar Kec. Southeast Maluku Regency) Paschal Rumihin; Andi Patriadi; Sajiyo Sajiyo
Asian Journal of Social and Humanities Vol. 3 No. 5 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i5.480

Abstract

Water is a fundamental need for all living things, especially humans, to support survival. Tamangil Nuhuten Village, located in South Kei Besar Sub-district, Southeast Maluku Regency, faces great challenges in meeting the clean water needs of its residents. This study was conducted to evaluate the clean water distribution scheme through technical and economic approaches. The methods used included field surveys, water distribution simulation using EPANET 2.2 software, infrastructure development cost analysis, and a comprehensive assessment of construction time requirements. The results of the analysis show that the hilly topography of the village is the main obstacle in water distribution. To overcome this obstacle, a gravity-based distribution system is recommended. Based on EPANET 2.2 simulation, this system is able to fulfill the community's clean water needs efficiently. The total cost of building the distribution network is estimated at Rp8,202,383,000.00 with a construction time of six months. Furthermore, this research provides an in-depth analysis of the required time allocation for each construction phase to ensure project feasibility and efficiency. This research is expected to be a reference for the government and related parties in designing a water distribution system that is effective, sustainable, and in accordance with the needs of the Tamangil Nuhuten Village community. 
ANALISIS SISTEM PENYEDIAAN AIR BERSIH KAMPUNG KASAI KECAMATAN PULAU DERAWAN KABUPATEN BERAU Anang Wahananto; Budi Witjaksana; Andi Patriadi
Jurnal Teknika Vol 16 No 2 (2024): SEPTEMBER
Publisher : Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/jt.v16i2.1248

Abstract

Kampung Kasai merupakan kampung nelayan yang terus berkembang dari kampung tertinggal menuju kampung berkembang. Seiring dengan pertumbuhan itu tuntutan kebutuhan prasarana dan sarana air bersih terus meningkat. Kebutuhan air bersih mencapai puncaknya pada saat musim kemarau tiba yang menyebabkan tekanan besar pada pasokan air bersih yang berakibat ketidakcukupan untuk kebutuhan sehari-hari masyarakat. Perlu dilakukan analisis mendalam mengenai strategi pengelolaan sumber air bersih yang efektif untuk mengatasi kekurangan pasokan pada musim kemara. Metode penelitian menggunakan Analisis proyeksi jumlah penduduk dan Pengukuran Debit pada Sumur Pengambilan. Dilakukan uji pumping test di lokasi sumur setelah sebelumnya dilakukan pengistirahatan selama ±24 jam kepada sumur bor yang akan di uji pemompaan. Dari uji pumping test selama 24 jam nonstop didapatkan debit konstan sebesar 2 liter/dt. Uji Pemompaan dilaksanakan pada tanggal 5 Maret 2024 sampai 11 Maret 2024 dengan metode constant rate test menggunakan pompa yang tersedia di lokasi pengujian. Uji pemompaan dilakukan secara terus menerus selama waktu tertentu dan kedudukan muka air tanah mengalami kondisi relatif stabil pada kedalaman tertentu, kemudian pompa dimatikan. Adapun dari uji pumping test selama 24 jam nonstop didapatkan debit konstan sebesar 2,32 Lt/detik. Sehingga disimpulkan bahwa uji pemompaan lebih besar dari perhitungan potensi air tanah.