Filter By Year

1945 2024


Found 27,067 documents
Search Information

Upaya Peningkatan Pengetahuan Kader Dengan Modul Konseling Kb Pasca Persalinan Berdasarkan Information Motivation Behavioral Skills (IMB) Model Siti Nurjanah; Erinda Nur Pratiwi; Wijayanti Wijayanti; Atiek Murharyati
Jurnal Salam Sehat Masyarakat (JSSM) Vol. 2 No. 2 (2021): Jurnal Salam Sehat Masyarakat
Publisher : Prodi Ilmu Kesehatan Masyarakat, FKIK Universitas Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (368.342 KB) | DOI: 10.22437/jssm.v2i2.13610

Abstract

The application of postpartum birth control is very important because the return of fertility to a mother after giving birth is unpredictable and can occur before the arrival of the menstrual cycle, even in breastfeeding women. The first ovulation in a non-breastfeeding woman can occur as early as 34 days postpartum, even earlier. This causes during breastfeeding, women often experience unwanted pregnancy (KTD / unwanted pregnancy) at intervals close to previous pregnancies. Contraception should be used before sexual activity begins. It is therefore very strategic to start contraception as early as possible after delivery. After efforts to increase knowledge, it is hoped that cadres in the Gambirsari Health Center work area can provide counseling to mothers related to postpartum family planning. Method of implementation with lectures and discussions. The media used are modules, LCDs, laptops, and projectors. The implementation of health education is planned to be carried out at posyandu activities, namely in April-August 2020. The result of community service is that 90% of cadres know and understand better and from the results of monitoring and evaluation by meeting again at Posyandu Kinasih, 90% of cadres can explain the contents of the postpartum family planning counseling module. Based on the implementation of community service, it can be concluded that there is an increase in counseling skills, information, motivation and skills in using family planning at postpartum by cadres in the working area of ​​Puskesmas Gambirsari Surakarta.
Pendampingan Evaluasi Manfaat Sistem Sikopdit pada CU Satu Hati Dengan Metode Information Economics Ignatius Novianto Hariwibowo; Albertus Pranowo
KONSTELASI: Konvergensi Teknologi dan Sistem Informasi Vol. 1 No. 2 (2021): Desember 2021
Publisher : Program Studi Sistem Informasi Universitas Atma Jaya Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (384.959 KB) | DOI: 10.24002/konstelasi.v1i2.4281

Abstract

Teknologi informasi merupakan kebutuhan pada banyak organisasi saat ini. Banyaknya manfaat yang didapatkan dari teknologi informasi mendorong organisasi melakukan investasi pada teknologi informasi, yaitu SIKOPDIT, salah satunya adalah Credit Union Satu Hati. Dalam investasi teknologi informasi, organisasi sering kali kurang melakukan perhitungan secara matang karena sulitnya menghitung nilai manfaat dari penerapan teknologi informasi. Masalah ini menyebabkan investasi tersebut menjadi beban yang ditanggung oleh perusahaan. Pengabdian masyarakat ini bertujuan untuk mengetahui nilai manfaat dari teknologi yang telah diterapkan oleh Credit Union Satu Hati. Penilaian tentang manfaat teknologi informasi membutuhkan metode yang dapat menganalisa manfaat finansial dan non-finansial pada investasi tersebut. Oleh sebab itu peneliti menggunakan metode information economics untuk meneliti tingkat kelayakan tersebut.Hasil dari pengabdian ini adalah penerapan SIKOPDIT pada CU. Satu Hati berada dalam kuadran A yaitu investment. Pada perhitungan Return On Investemet (ROI) didapatkan nilai 528%. Hasil dari perhitungan information economics scorecard didapatkan hasil 69,8 berarti investasi ini masuk kedalam kategori layak atau penerapan SIKOPDIT telah memberikan manfaat.
Confirmatory Factor Analysis Job Relevant Information, Partisipasi Anggaran dan Kinerja Aparatur Pemerintah Daerah Kabupaten Malang M Taufiq Noor Rokhman
JDEP (Jurnal Dinamika Ekonomi Pembangunan) Vol 1 No 2 (2018): JDEP (Jurnal Dinamika Ekonomi Pembangunan)
Publisher : Prodi Ekonomi Pembangunan FEB Universitas Pembangunan Nasional "Veteran" Jawa Timur

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (181.059 KB) | DOI: 10.33005/jdep.v1i2.74

Abstract

The purpose of this study was to analyze the confirmatory factors of job relevant information, participation in budgeting and the performance of local government apparatus in the Regional Government of Malang Regency. Analysis of the data used in the study using confirmatory factor analysis (CFA) technique, the results of the study showed that active indicators contributed to the strongest budgeting as a variable forming Budget Participation, the indicator gained the strongest strategy as a variable Job relevant information and indicators set budget targets with the strongest resources and time determined as a variable for apparatus performance
PEMECAHAN PERMASALAHAN FLIGHT INFORMATION REGION (FIR) DI WILAYAH KEDAULATAN INDONESIA Hanifati Nur Amalina; Muhammad Gholib Ramdani; Satria Arif Darmawan
LONTAR MERAH Vol 2, No 2 (2019): Lontar Merah
Publisher : Universitas Tidar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (606.042 KB)

Abstract

Penelitian ini bertujuan untuk mengetahui peraturan internasional serta nasional mengenai pelayanan ruang udara (FIR) serta menelaah upaya hukum yang dapat dilakukan oleh Indonesia dalam pengambilalihan ruang udara di atas kepulauan Riau dan Natuna. Penelitian yang digunakan adalah penelitian hukum yuridis normatif. Sumber data didukung oleh sumber data primer dan sekunder yang mengacu pada peraturan perundang-undangan dan literatur berkaitan dengan permasalahan Pengelolaan Flight Information Region (FIR) Kepulauan Riau dan Natuna oleh Singapura. Hasil dari penelitian ini adalah  pengelolaan FIR Singapura di wilayah udara kepulauan Riau dan Natuna hanya terbatas pada teknis penerbangan saja. Namun dalam mengelola sebuah FIR negara lain harus mempertimbangkan dan menghargai kedaulatan suatu Negara. Sesuai dengan peraturan internasional yakni Konvensi Penerbangan Sipil Internasional tahun 1944 (Konvensi Chicago) beserta Annex-nya, merupakan aturan dasar dan utama dalam pengaturan pelayanan ruang udara. Upaya yang dilakukan indonesia adalah melakukan perjanjian bilateral antara Indonesia dan Singapura agar wilayah udara di Kepulauan Riau dan Natuna dapat dikelola oleh Indonesia.
Sistem Pengelolaan Mangrove Information Center (MIC) Di Desa Wonorejo Surabaya, Jawa Timur Amdani Amdani
Jurnal Riset Perikanan dan Kelautan Vol 4 No 1 (2022): JURNAL RISET PERIKANAN DAN KELAUTAN
Publisher : Universitas Muhammadiyah Sorong

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (425.38 KB)

Abstract

Hutan mangrove merupakan sumberdaya pesisir yang berperan penting dalam pembangunan baik daerah atau negara. Kawasan mangrove memiliki peranan yang sangat vital bagi manusia dan hewan yang hidup di dalamnya. Dalam beberapa dekade terakhir ini sering terjadi pengalihfungsian lahan mangrove tanpa izin untuk dijadikan lahan pertambakan, pemukiman, dan lainnya. Oleh karena itu diperlukan langkah strategis untuk melindungi hutan mangrove sekaligus menjadikan hutan mangrove menghasilkan uang bagi masyarakat sekitarnya sehingga manfaat ekonomi bisa dirasakan oleh masyarakat tanpa merusak hutan mengrove yaitu dengan cara pengelolaan yang baik dan terstruktur. Penelitian bertujuan untuk mengetahui jenis vegetasi mangrove, sistem pengelolaan, jenis kegiatan dan idetifikasi permasalahan yang terjadi dalam pengelolaan mangrove di Mangrove Information Center Wonorejo Surabaya. Sistem pengelolaan Mangrove Information Center (MIC) dikelola oleh masyarakat Wonorejo dibawah naumgan Dinas Ketahanan Pangan dan Pertanian Kota Surabaya. Kegiatan wisata yang terdapat di Mangrove Information Center ada 2 yaitu ekowisata mangrove dan jasa foto prawedding. Permasalahan yang dihadapi Mangrove Information Center dalam hal pengelolaan antara lain yaitu air bersih, akses jalan, tugas para pengelola yang kurang teratur, dana bantuan kepada Mangrove Information Center. Pada Mangrove Information Center terdapat 2 jenis spesies mangrove dari 3 stasiun pengamatan yang dilakukan, yaitu Avicenia alba dan Avicenia marina. Vegetasi Avicennia marina mendominasi pada tingkat pohon, anakan dan semai hampir di semua stasiun penelitian sedangkan vegetasia Avicenia alba mendominasi pada tingkat anakan, pohon dan semai hanya pada stasiun 2.
Identifying the Critical Barriers Factors to the Implementation of Building Information Modelling (BIM) in the Sarawak's Construction Industry Toe Myint Naing; Aidin Nobahar Sadeghifam; Meheron Selowara Joo
Civil and Sustainable Urban Engineering Vol. 2 Iss. 1 (2022)
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (497.754 KB) | DOI: 10.53623/csue.v2i1.83

Abstract

Building Information Modelling (BIM) is one of the most advanced developments in the architecture, engineering, and construction (AEC) industry that can generate a 3D virtual information model which can be used for planning, design, construction, and operations. As Building Information Modelling (BIM) approaches the construction industry as a new technology and process, changes in the industry have created some barriers to BIM adoption in Malaysia. This research aims to enhance the implementation of BIM in the construction stage of Sarawak's construction industry by identifying and classifying the critical barriers. This study fills this current knowledge gap and enhances the understanding of BIM in the construction stage and the factors that hinder implementation in Sarawak. To develop the challenges being faced in this industry, a set of barrier clusters based on people, process, policy, technology, and cost were pre-identified through a literature review, and a structured interview involving three BIM experts was conducted on WebEx to refine these barriers with the current industry situation. As an outcome, this study identified 49 of the barriers from the literature and refined them into 26 of the barriers under their main clusters. Interestingly, they all validated the fact that lack of government involvement in BIM implementation is an undeniable barrier factor to growing BIM utilization and reaching its full potential. This study will form the basis of further research, and additional studies focusing on prioritizing these identified barriers for strategic planning would help the construction players in their swift transformation to BIM. 
The The Barrier Factors to the Implementation of Building Information Modelling for Construction Industry in Sarawak Jiong Ru Chan; Aidin Nobahar Sadeghifam; Meheron Selowara Joo
Civil and Sustainable Urban Engineering Vol. 2 Iss. 1 (2022)
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (556.041 KB) | DOI: 10.53623/csue.v2i1.86

Abstract

Building Information Modelling (BIM) Construction Lifecycle Process offers digital construction solutions throughout the whole project lifecycle by providing sustainable productivity and quality and increasing the work collaboration and efficiency of the design teams. BIM represents the development and application of computer-generated n-dimensional (n-D) models to simulate building construction planning, design, construction, and operation. In Sarawak, the BIM technology does not meet the construction stakeholder's expectations during the project lifecycles in different stages, which resulted in low BIM implementation. Therefore, this research study aims to identify the salient barrier factors to the implementation of BIM in the Sarawak construction industry, specifically in the design stage. To achieve the research study, the methodology is applied through literature review, followed by an online interview with BIM experts in Sarawak Construction Industry. Lastly, the findings of this study indicate the most salient factors faced by the Sarawak construction industry until the present, in terms of Technology, Cost, Management, Personal and Policy, such as (1) Lack of active participation from consultants in the project team, (2) Low enforcement from client, (3) Lack of senior management support, (4) Lack of desire to change of the older generation to implement BIM and (5) Lack of the knowledge regarding the cost benefits for implementing BIM.
Digital Literacy Hoax Information in Indonesian Tourism Area K. Y.S. Putri; Vera Wijayanti Sutjipto; Wiratri Anindhita; Nada Arina Romli; Yesi Andriani; Diva Rheva Deianeira
Journal of Digital Marketing and Communication Vol. 2 Iss. 1 (2022)
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (301.192 KB) | DOI: 10.53623/jdmc.v2i1.75

Abstract

The COVID-19 pandemic has drastically reduced tourism in Indonesia. Information, both legal and unclear, is milling about in cyberspace. Researchers are concerned with this problem by asking research questions about how much influence digital literacy has on attitudes toward responding to hoax news in new media. The purpose of the study was to determine the effect of digital literacy on attitudes toward responding to hoax news in new media. The concepts used are digital literacy, new media, and audience attitudes in responding to information in new media. Previous research has assisted this research in supporting this research. Questionnaires were distributed to the respondents in this study, accompanied by several interviews with several sources. The results of the validity and reliability tests of this study were good enough that they could proceed to the next statistical stage. The results of the descriptive research are positive. The condition of the COVID-19 pandemic has made tourism in Indonesia worse for tourist areas. Hoax information has made the area worse both economically and on the other hand. The relationship between digital literacy and the respondents' attitudes in this study is strong. The null hypothesis in this study was rejected, so the alternative research hypothesis was accepted. The novelty in this study is that the relationship between the two variables is in a pandemic condition that has lasted for two years in Indonesia. The impact of this pandemic has made tourist areas in Indonesia very problematic for the economy and people's lives. Suggestions for research include: additional research can describe or add additional analysis in solving societal problems.
PENILAIAN EFEKTIVITAS IMPLEMENTASI BUILDING INFORMATION MODELLING (BIM) PADA PROYEK KONSTRUKSI BANGUNAN GEDUNG Sarju; Dwi Vera Asmarayani; Nindyo Cahyo Kresnanto
Jurnal Teknik Sipil Vol. 16 No. 4 (2022)
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (716.035 KB) | DOI: 10.24002/jts.v16i4.5539

Abstract

Penelitian ini menilai secara nyata efektivitas implementasi BIM dengan sampel penelitian diambil pada proyek konstruksi bangunan gedung yang telah menerapkan aplikasi BIM. Analisa dilakukan dengan mengamati respon dari tim perencana, kontraktor dan manajemen konstruksi. Faktor-faktor penting yang digunakan sebagai pendekatan dalam penelitian dikembangkan menjadi enam variabel, yaitu Organisasi (X1), Aplikasi (X2), Peralatan (X3), Tim proyek (X4), Proses (X5) dan Model bisnis (X6). Enam variabel tersebut terdiri dari 123 indikator untuk menfasilitasi survei kuesioner dan penilaian efektivitas implementasi BIM. Survei dilakukan pada industri konstruksi di Indonesia. Data yang diperoleh dianalisa dengan uji reliabilitas, analisa peringkat dan uji One-Way Anova Kruskal Wallis. Analisis peringkat dirancang dengan menilai indikator dari setiap variabel dan diberi skor untuk menyusun peringkat dalam variabel maupun peringkat secara keseluruhan. Hasil skor rata-rata setiap indikator maupun variabel menunjukan bahwa implementasi BIM pada proyek konstruksi bangunan gedung di Indonesia adalah efektif. Ini dibuktikan dengan nilai rata-rata setiap variabel diatas empat. Hasil hipotesis uji One-Way Anova Kruskal Wallis menunjukkan bahwa ada perbedaan besaran nilai efektivitas implementasi BIM diantara enam variabel yang ditunjukkan dengan hasil analisa deskriptif.
The Building Information Modeling (BIM)-Based System Framework to Implement Circular Economy in Construction Waste Management Tantri N. Handayani; Kartika Nur Rahma Putri; Nurul Alvia Istiqomah; Veerasak Likhitruangsilp
Journal of the Civil Engineering Forum Vol. 8 No. 1 (January 2022)
Publisher : Department of Civil and Environmental Engineering, Faculty of Engineering, Universitas Gadjah Mada

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (979.706 KB) | DOI: 10.22146/jcef.3602

Abstract

The tremendous quantity of waste produced from construction and demolition is a major cause of environmental degradation. This quantity tends to increase due to the rapid growth of building development and renovation. Meanwhile, construction waste management is a complex and costly process due to the fact that it requires different kinds of resources such as money, land, and technology. It is often ignored by all project participants even though it is an essential element of construction project management. However, it has been discovered that modern construction waste management is structured based on the concept of circular economy which focuses on eliminating construction waste and maximizing the value of materials. Therefore, this research proposes an innovative framework to implement the circular economy using building information modeling (BIM) in order to improve the construction waste management process. This involved a thorough review of past literature to identify the implementation of the concept of circular economy, waste management, and the application of BIM, also the research gaps observed were used to develop the functionality of the proposed framework. The five functionalities include (1) visualization and data integration, (2) direct construction waste quantity take-off, (3) BIM-based sorting system and selection of appropriate disposal parties, (4) estimating cost and schedule of waste disposal, and (5) simulation and monitoring report. This BIM system was designed to analyze material waste, quantity, disposal time, and waste treatment based on project conditions, material quantities, and schedule. It can also be used to plan and monitor the construction waste process, thereby making it possible to avoid the disruption of productivity and project time usually caused by unplanned waste management activities. Moreover, the proposed on-site sorting system also has the ability to facilitate the adoption of the circular economy concept during the construction phase.

Page 733 of 2707 | Total Record : 27067