cover
Contact Name
Benny Hidayat, PhD
Contact Email
bennyhidayat@ft.unand.ac.id
Phone
-
Journal Mail Official
bennyhidayat@ft.unand.ac.id
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
Jurnal Rekayasa Sipil
Published by Universitas Andalas
ISSN : 18582133     EISSN : 24773484     DOI : -
Core Subject : Engineering,
Jurnal Rekayasa Sipil' translated as Civil Engineering Journal, is a scholarly periodical that published by Civil Engineering Departement, Faculty of Engineering, Andalas University (Unand), Padang, West Sumatra, Indonesia. The journal, abbreviated as JRS-Unand, covers recent topics in civil engineering as stated in its focus and scope. JRS-Unand publishes 6-10 articles in each edition with 8-14 pages long for each article. One volume of JRS-Unand divided into two editions, which published in February and October each year. Articles are written in Bahasa Indonesia (Indonesian language) or can be in English.
Arjuna Subject : -
Articles 6 Documents
Search results for , issue "Vol 10, No 2 (2014)" : 6 Documents clear
PENGARUH VARIASI SEMEN TERHADAP NILAI CBR BASE PERKERASAN LENTUR TIPE CEMENT TREATED BASE (CTB) Herman Herman; Jon Edwar
Jurnal Rekayasa Sipil (JRS-Unand) Vol 10, No 2 (2014)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (356.823 KB) | DOI: 10.25077/jrs.10.2.41-51.2014

Abstract

Dalam mengantisipasi pertumbuhan volume lalu lintas kedaraan berat pada daerah industri dan pelabuhan, lapisan base tipe Cement Treated Base (CTB) merupakan alternative yang dapat digunakan untuk menggantikan perkerasan tipe Asphalt Treated Base (ATB). Untuk mengetahui pengaruh semen terhadap base, diadakanlan penelitian dilaboratorium UPTD. Balai Pengujian bahan DPU. Padang,, sampel base yang digunakan tipe Klas A diambil dari stokfile Angkasa Teknik Raya, semen digunakan semen Padang Tipe I, penambahan semen adalah 0%, 3%, 5% dan 7% dari berat kering campuran base dengan masa perawatan 3 hari. Pengujian yang dilakukan adalah uji sifat fisis dan uji sifat mekanis. Uji sifat fisis terdiri dari uji berat jenis, kadar air, dan analisa saringan sedangkan uji sifat mekanis terdiri dari uji pemadatan dan uji CBR baik dengan rendaman maupun tidak terendam dengan masa perawatan 3 hari. Hasil penelitian menunjukan meningkatnya persentase semen pada base, nilai kadar air optimum juga meningkat, sedangkan nilai kepadatan maksimum (γdmaks), dan CBR ( terendam dan tidak terendam) , pada awalnya nilai-nilai inimeningkat (sampai pada campuran base + 3% semen), seiring dengan peningkatan persentase semen pada base, nilai-nilai ini cenderung menurun. keywords: cement treated base, aspal treated base, stok file, CBR, optimum
ANALISIS STRUKTUR RANTAI PASOK KONTRUKSI PADA PEKERJAAN JEMBATAN Febiana Maulani; Akhmad Suraji; Bambang Istijono
Jurnal Rekayasa Sipil (JRS-Unand) Vol 10, No 2 (2014)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (258.816 KB) | DOI: 10.25077/jrs.10.2.1-8.2014

Abstract

Rantai Pasok adalah suatu item kegiatan atau jaringan kerjasama pengadaan barang atau jasa yang berkerja sama dan saling terkait satu sama lain untuk membuat dan menyalurkan barang atau jasa. Sedangkan, struktur rantai pasok adalah susunan suatu item kegiatan atau jaringan kerjasama pengadaan barang atau jasa yang berkerja sama dan saling terkait satu sama lain untuk membuat dan menyalurkan barang atau jasa. maka, pada suatu proyek kontruksi suatu sistem rantai pasok sangat mempengaruhi kelancaran suatu proyek. Baiknya suatu sistem rantai pasok kontruksi akan meningkatkan kinerja dari suatu kontraktor pada suatu proyek. Tujuan dari penelitian ini adalah untuk mengetahui kinerja suatu kontraktor pada suatu proyek kontruksi jembatan dengan mengkaji melalui struktur rantai pasok yang digunakan. Hasil dari penelitian yang dilakukan pada kontraktor, subkontraktor dan supplier pada konstruksi jembatan dengan beberapa aspek penentu seperti hubungan dengan subkontraktor dan supplier seperti, jenis pengadaan, jenis kontrak, system pembayaran, dan interaksi antara dua perusahaan menunjjukn adanya keterkaitan antara hubungan kerja sama yang baik terhadap keefektifan pelaksanaan pekerjaan konstruksi. Keywords: rantai pasok, supplier, subkontraktor, Tier, konstruksi jembatan.
LAHAN MENJADI FAKTOR PENGHAMBAT DALAM PELAKSANAAN PEMBANGUNAN UNTUK KEPENTINGAN UMUM Bambang Istijono
Jurnal Rekayasa Sipil (JRS-Unand) Vol 10, No 2 (2014)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (190.281 KB) | DOI: 10.25077/jrs.10.2.52-59.2014

Abstract

Terdapat beberapa resiko yang berpotensi menjadi penghambat pekerjaan konstruksi, selain masalah kinerja kontraktor, kinerja konsultan, koordinasi dengan pihak terkait. Salah satunya adalah masalah pengadaan lahan/pembebasan tanah. Masalah pembebasan tanah tidak hanya terjadi di perkotaan tetapi juga terjadi di daerah, terutama yang masih mengenal tanah ulayat/adat. Permasalahan lahan menjadi faktor penting untuk diselesaikan sebelum dimulainya suatu pekerjaan konstruksi, tanah yang belum bebas akan dapat menghambat pelaksanaan pekerjaan, bahkan menyebabkan pekerjaan tidak dapat diselesaikan sesuai jadwal kontrak. Tulisan ini menguraikan tentang teori pengadaan tanah, peraturan tentang pengadaan tanah dalam pelaksanaan pembangunan untuk kepentingan umum dan beberapa kasus terjadi di pekerjaan jembatan, jalan dan pekerjaan irigasi, dengan mengidentifikasi faktor yang menjadi penghambat pembebasan lahan. Hasil penelitian menunjukkan bahwa permasalahan pembebasan lahan terjadi karena terdapat perbedaan patokan nilai harga ganti rugi antara pemilik tanah dan Pemerintah. Disarankan bahwa harga patokan tanah tidak hanya berpedoman pada harga saat ini, tetapi juga memperhitungkan harga jual tanah pada saat proyek selesai dilaksanakan. Keywords: pengadaan lahan, pembangunan, kepentingan umum
THE IMPACT OF APPLYING BASE ISOLATOR IN HOSPITAL BUILDING Predaricka Deastra; Jati Sunaryati; Riza Aryanti
Jurnal Rekayasa Sipil (JRS-Unand) Vol 10, No 2 (2014)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (484.331 KB) | DOI: 10.25077/jrs.10.2.9-24.2014

Abstract

Due to Indonesia’s location in the earthquake zone, it is necessary for civil engineers in Indonesia to study seismic performance of a building, which is strongly related to the structure of the building itself. Buildings equipped with vibration damping structures, known as an isolation system, will have a different seismic behavior than if it did not have one. This is due to the impact of an earthquake dampening vibration isolator. This final project analyzes the difference between seismic performance of a building using a seismic isolation system and ones without. The conclusion of this final project shows that the isolation system will decrease the internal force of a structure element by about 57.71% for axial force, 84.10% for shear, and 85.75% for moment. The application of an isolation system will also decrease the relative displacement by about 74,28% and extended structure vibration period by about 171.17 %. Keywords: earthquake, seismic performance, isolation system.
PENGUKURAN TINGKAT PENERAPAN NORMA, STANDAR, PROSEDUR DAN KRITERIA KESELAMATAN DAN KESEHATAN KERJA (NSPK K3) PADA PROYEK KONSTRUKSI Ari Syaiful Rahman Arifin; Akhmad Suraji; Bambang Istijono
Jurnal Rekayasa Sipil (JRS-Unand) Vol 10, No 2 (2014)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (101.543 KB) | DOI: 10.25077/jrs.10.2.31-40.2014

Abstract

Hasil analisis statistik beberapa negara menyimpulkan bahwa bahwa risiko kecelakaan kerja di industri konstruksi adalah jauh lebih tinggi dibanding rata-rata untuk semua sektor (Suraji, 2000). Masalah keselamatan dan kesehatan kerja secara umum di Indonesia belum mendapatkan perhatian dari berbagai pihak (Wirahadikusumah, 2007). Permasalahan yang terkait dengan keselamatan kerja di Indonesia adalah bukan hanya mengenai kualitas dari kebijakan (policy) yang mengatur keselamatan kerja di industri konstruksi, tetapi juga sejauh mana kebijakan tersebut telah diimplementasikan dalam pekerjaan konstruksi di lapangan. Survai penerapan regulasi dan kebijakan K3 pada 30 proyek gedung oleh Suraji & Rosmariani (2012) menemukan bahwa dari 30 proyek gedung yang terdiri dari 17 proyek oleh perusahaan konstruksi BUMN hanya memiliki rata-rata penerapan elemen Norma, Standar, Prosedur dan Kriteria Keselamatan dan Kesehatan Kerja (NSPK K3) sebesar 60% dari 65 elemen NSPK. Demikian juga untuk 11 proyek oleh perusahaan swasta nasional penerapan elemen NSPK hanya sebesar 48%. Sedangkan untuk 2 proyek yang dikerjakan oleh perusahaan kontraktor swasta asing sudah sangat baik menerapkan hampir semua elemen NSPK (99%). Penelitian ini dilakukan pada proyek konstruksi pekerjaan gedung di Universitas Negeri Padang tahun 2011-2012, ditambah dengan satu proyek pemerintah dan satu proyek swasta tahun 2013 sebagai pembanding. Tujuan dari penelitian ini adalah untuk mengukur kinerja perusahaan kontraktor dalam menerapkan NSPK K3 pada proyek konstruksi untuk pekerjaan gedung. Sehingga dapat mengetahui seberapa tingkat kepatuhan (akuntabilitas) perusahaan kontraktor dalam menerapkan NSPK K3. Hasil Penelitian menunjukkan bahwa persetanse kepatuhan masing-masing perusahaan kontraktor terhadap penerapan peraturan berbeda-beda. Untuk perusahaan dengan proyek konstruksi beresiko rendah, hasil perhitungannya adalah pada kisaran 56,10% - 58,06%. Untuk proyek konstruksi dengan tingkat resiko sedang, hasil perhitungannya adalah pada kisaran 61,86% - 65,04%. Untuk perusahaan dengan proyek konstruksi berisiko tinggi, hasil perhitungannya adalah pada kisaran 79,96% - 84,28%. Berdasarkan hasil penelitian pada proyek konstruksi untuk tingkat risiko rendah tingkat penerapan NSPK K3 pada penilaian tingkat penerapan Kurang, sedangkan untuk proyek konstruksi dengan risiko sedang dan tinggi menerapkan NSPK K3 pada penilaian tingkat penerapan Baik. Keywords: NSPK K3, tingkat penerapan, risiko, kontraktor, proyek konstruksi.
ANALISIS BIAYA KEUNTUNGAN DEVELOPER DARI HARGA JUAL BERBAGAI TIPE RUMAH PADA BANGUNAN PERUMAHAN Wahyu Ramadhan; Yervi Hesna
Jurnal Rekayasa Sipil (JRS-Unand) Vol 10, No 2 (2014)
Publisher : Civil Engineering Departement, Andalas University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (104.867 KB) | DOI: 10.25077/jrs.10.2.25-30.2014

Abstract

Kawasan perkotaan yang berkembang pesat dengan beragam aktivitas menyebabkan kebutuhan masyarakat akan rumah menjadi meningkat. Alternatif mencapai keinginan tersebut yaitu dengan membeli rumah dari pihak pengembang perumahan. Developer atau pengembang perumahan akan berusaha menyediakan rumah dengan berbagai tipe rumah yang diminati oleh masyarakat. Penelitian ini bertujuan untuk mengetahui identifikasi biaya yang diperhitungkan kemudian didapatkan titik impas serta keuntungan tiap tipe rumah dengan mengambil data 3 (tiga) tipe rumah yang berbeda di Kota Pekanbaru. Dari hasil analisa break even point untuk rumah tipe 40/128 m2 mencapai titik impas pada Rp.3.232.600.000 (18 Unit), Tipe 75/120 m2 Versailes sebesar Rp.826.960.000 (2 unit), dan tipe 150/155 m2 Lux sebesar Rp.2.866.200.000 (3 unit). Berdasarkan hasil analisa break even point, maka diperoleh keuntungan dari tiap tipe rumah masing-masing yaitu sebesar Rp.1.201.892.432 (Tipe 40/128 m2), Rp.2.300.483.160 (Tipe 75/120 m2Versailes), dan Rp 4.838.821.300 (Tipe 150/155 m2Lux). Hasil penelitian menunjukan bahwa membangun rumah dengan tipe dan ukuran yang kecil, developer akan mendapatkan keuntungan yang lebih kecil dibandingkan dengan membangun rumah dengan tipe dan ukuran menengah dan besar. Dengan menjual rumah tipe 75/120 m2 keuntungan developer yang diperoleh hanya sebesar 20,66% dibandingkan dengan membangun tipe rumah 75/120 m2 Versailes dan tipe rumah 150/155 m2didapatkan keuntungan sebesar 95,08% dan 69,51 % Keywords: Biaya, Break Even Point, Keuntungan, Developer.

Page 1 of 1 | Total Record : 6