cover
Contact Name
Jurnal Teknologi Pendidikan
Contact Email
jurnaltp@ppsuika.ac.id
Phone
-
Journal Mail Official
jurnalinovator@fe.uika-bogor.ac.id
Editorial Address
Jln. K.H. Sholeh Iskandar Km.2, Tanah Sereal Bogor 16161 Telp./Fax.: (0251) 357804
Location
Kota bogor,
Jawa barat
INDONESIA
Inovator : Jurnal Manajemen
ISSN : 19786387     EISSN : 2623050X     DOI : 10.32832/inovator
Core Subject : Economy,
Jurnal INOVATOR , Jurnal ini memberikan inovasi pada perkembangan teknologi dan ilmu manajemen dengan memberikan informasi praktis hasil pemikiran dan penelitian para pakar manajemen dengan scope : Manajemen Sumber Daya Manusia; Manajemen Keuangan; Manajemen Pemasaran; Manajemen Operasional dan Kewirausahaan. Jurnal ini terbit dua kalai dalam satu tahun yaitu pada bulan Maret dan September.
Arjuna Subject : -
Articles 221 Documents
Facility Layout Redesign to Improve Material Handling Efficiency in Colored Stone Production at PT Tatalogam Lestari Dessy Damayanthy; Fajar Wisnu Nugraha
INOVATOR Vol 15 No 2 (2026): SEPTEMBER
Publisher : prodima@fe.uika-bogor.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/inovator.v15i2.24984

Abstract

Facility layout efficiency and material handling are important for improving manufacturing performance. An inappropriate layout can increase material travel distance, movement frequency, and Material Handling Cost (MHC). This study aims to redesign the facility layout for the colored stone production process at PT Tatalogam Lestari and evaluate its impact o?n material travel distance and MHC. A quantitative approach was applied using field observations, interviews, facility measurements, and material movement data. The redesign employed the Activity Relationship Chart (ARC), Total Closeness Rating (TCR), and Blocplan methods, while material travel distance was calculated using the rectilinear distance approach. The results show that the proposed layout reduced material travel distance from 30,019.18 to 27,057.64 meters/day, a reduction of 2,961.54 meters/day or 9.87%. MHC decreased from IDR 1,395,846.49 to IDR 1,155,276.42/day, generating savings of IDR 240,570.07/day or 17.23%. The proposed layout improves material handling efficiency and operational cost performance.