cover
Contact Name
Augusta Adha
Contact Email
augusta.adha@eng.uir.ac.id
Phone
-
Journal Mail Official
saintis@journal.uir.ac.id
Editorial Address
-
Location
Kota pekanbaru,
Riau
INDONESIA
JURNAL SAINTIS
Published by Universitas Islam Riau
ISSN : 14107783     EISSN : 25807110     DOI : -
Core Subject : Social, Engineering,
Saintis is devoted to research on civil engineering related fields including geotechnics, transports, structures, water resources and others related with civil engineering topics.
Arjuna Subject : -
Articles 9 Documents
Search results for , issue "Vol. 17 No. 2 (2017)" : 9 Documents clear
Evaluasi Kinerja Sistem Drainase Manggar Kecil Kota Balikpapan: Drainage System Evaluation of Manggar Kecil Balikpapan Margaret, Rossana; Saputra, Andika A. I. Saputra A. I.
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (336.115 KB)

Abstract

[ID] Manggar Kecil merupakan salah satu wilayah drainase yang berada di Kelurahan Manggar, Kecamatan Balikpapan Timur. Wilayah drainase ini memiliki luas daerah tangkapan sebesar 24,07 km2 dan saluran primer sepanjang 9,16 km yang bermuara di Selat Makassar. Manggar Kecil memiliki permasalahan dalam proses pengaliran air dari hulu menuju hilir. Permasalahan ini berkaitan dengan kapasitas saluran primer yang tidak sesuai dengan besarnya debit hidrologi yang mengalir. Oleh karena itu, dalam penelitian ini dilakukan analisa debit hidrologi yang kemudian dibandingkan dengan kapasitas saluran yang bertujuan untuk mengetahui kinerja dari saluran. Metode yang digunakan dalam studi ini adalah dengan menganalisa besarnya debit hidrologi yang terjadi pada DAS Manggar Kecil. Besarnya debit hidrologi ini kemudian dibandingkan dengan kapasitas saluran drainase DAS Manggar Kecil. Dari hasil analisa diperoleh nilai debit hidrologi maksimum yang mengalir pada saluran primer Manggar Kecil sebesar 83,20 m3/det sedangkan kapasitas saluran maksimum hanya mencapai 72,86 m3/det, terdapat selisih debit sebesar 10,34 m3/det yang mengakibatkan terjadinya luapan. [EN] Manggar Kecil is one of areas drainage located in villages drainage manggar, East Balikpapan. The drainage area has catchment area 24,07 km2 and channels primary along 9,16 km that rises in the strait of Makassar. Manggar Kecil having problems in the process water flowing from upstream flows into downstream. This problem is related to the capacity of the primary channels is not in accordance with the size of the discharge hydrology that flows. In this research, hydrological discharge analysis which then compared with channel capacity which aims to know the performance of channel. Method used in this study is to analyze the amount of hydrological discharge that occurs in the Bassin Manggar Kecil. The discharge hydrology were then compared with capacity drainage channel Bassin Manggar Kecil. From the analysis results obtained the maximum hydrological flow value that flows on the main channel Manggar Kecil 83,20 m3/s while the maximum channel capacity reaches only 72,86 m3/s, there is a discharge of 10,34 m3/s resulting in the overflow.
Analisis Earned Value Waktu dan Biaya Proyek Konstruksi Jalan (Studi Kasus: Pelebaran Jalan Simpang Lago - Sorek I): Earned Value Analysis of the Time and Cost of the Road Construction Project (Case Study: The Widening of the Road Simpang Lago - Sorek I) Kurniawan, Wahyudi; Purnomo. R, Deddy; Boer, Astuti
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (867.643 KB)

Abstract

[ID] Dalam sebuah proyek, merencanakan dan mengendalikan biaya dan waktu merupakan bagian dari keseluruhan pengelolaan proyek, terutama pada tahap studi kasus yang diulas oleh para peneliti ini adalah pembangunan proyek pelebaran jalan Simpang Lago - Sorek I. Dalam penelitian ini dilakukan pengendalian metode time and cost dengan metode nilai satu yang dapat memantau kinerja proyek dalam hal biaya dan waktu. Yang bertujuan untuk mengetahui kinerja proyek dalam hal biaya dan waktu setiap minggu dan memprediksi biaya dan waktu untuk menyelesaikan sisa pekerjaan. Dengan demikian diperoleh koreksi tindakan apa yang harus dilakukan selanjutnya untuk kemajuan proyek. Hasil penelitian yang dilakukan adalah, untuk nilai keseluruhan BCWS dari proyek pelebaran jalan sebesar Rp.19.972.180.434,65 ini, dengan nilai BCWP akhir minggu inspeksi 21 Rp.15.017.729.689,96, nilai ACWP akhir inspeksi Minggu 21 USD .14.996.531.704,74. Sedangkan untuk hasil yang diperoleh dari analisis beberapa indikator yang ada nilai SPI diperoleh 1.308> 1 sedangkan CPI naik 1,002> 1, yang berarti percepatan proyek dalam hal jadwal namun biaya sebenarnya kurang dari pada pekerjaan yang telah dilakukan. Selesai Untuk nilai Rp.5.827.309.552,19 ETC dan EAC sebesar Rp.20.823.841.256,93 sedangkan nilai ECD menjadi 194 hari untuk waktu penyelesaian proyek. [EN] In a project, planning and controlling costs and time are part of the overall project management, especially at this stage of the case studies reviewed by the researchers is the construction of the road widening project Simpang Lago - Sorek I. In this study the control of time and cost method of earned value one method that can monitor the performance of the project in terms of cost and time. Which aims to determine the performance of the project in terms of cost and time every week and predict the cost and time to complete the remaining work. thus obtained correction what action to do next for the progress of the project. The results of the research conducted is, for BCWS overall value of these Rp.19.972.180.434,65 road widening project, to the value of BCWP end of the inspection week 21 Rp.15.017.729.689,96, ACWP value end of the inspection week 21 USD .14.996.531.704,74. As for the results obtained from the analysis of some existing indicators SPI values ​​obtained 1.308> 1 while the CPI gained 1.002> 1, which means the project is accelerating in terms of schedule but the actual cost is less than the work that has been done. For the value of Rp.5.827.309.552,19 ETC and EAC value of Rp.20.823.841.256,93 while the value of ECD to 194 days for the project completion time.
Pemilihan Sepeda Motor Sebagai Angkutan Reguler Mahasiswa Universitas Islam Riau (Studi Kasus : Fakultas Teknik): Selection of Motorbikes as Regular Transport Students of Islamic University of Riau (Case Study: Faculty of Engineering) Muttaqin, Muchammad Zaenal; Zaini, Abdul Kudus
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (305.128 KB)

Abstract

[ID] Transportasi merupakan salah satu kebutuhan utama dalam menunjang aktivitas masyarakat sehari-hari. Perkembangan transportasi yang beragam menyebabkan masyarakat memiliki banyak pilihan yang akan digunakan guna mendukung aktivitasnya sehari-hari. Mahasiswa sebagai salah satu kelompok masyarakat memiliki suatu karakteristik tertentu dalam memilih moda transportasi, baik dari karakteristik mahasiswa itu sendiri maupun kualitas pelayanan dari moda yang dipilih. Faktor lokasi dan perilaku mahasiswa menjadi faktor karakteristik utama dalam pemilihan moda tersebut. Sedangkan pada faktor luar, persepsi seseorang terhadap kualitas pelayanan yang diberikan menjadi satu pertimbangan sendiri dalam memilih suatu moda transportasi. Tujuan dari penelitian ini adalah mengetahui perilaku mahasiswa dalam memilih moda transportasi dalam rangka meuwujdkan suatu transportasi yang berkelanjutan. Analisis Tabulasi dan pendekatan kualitatif melalui metode Likert akan digunakan untuk mengetahui karakteristik mahasiswa serta kualitas pelayanan moda transportasi yang dipilih dari mahasiswa itu sendiri. Sampel yang didapat penelitian ini adalah sebanyak 500 mahasiswa fakultas teknik Universitas Islam Riau pada segala jurusan. Hasil penelitian menunjukkan bahwa mahasiswa memiliki kecenderungan tertinggi dalam memilih kendaraan pribadi berupa motor (80%) dibandingkan kendaraan yang lain. Kepuasan mahasiswa dalam moda ini sangat tinggi. Faktor kehandalan, fleksibilitas dan aksesibilitas yang tinggi menjadi faktor tertinggi dalam menggunakan motor. Selain itu, pertimbangan tertinggi mahasiswa dalam memilih sepeda motor adalah persepsi mengenai dampak minimum yang timbul terhadap permasalahan lalu lintas dibanding moda yang lain dalam kondisi mixed traffic flow. Sehingga, faktor kualitas yang ditawarkan suatu moda transportasi menjadi salah satu faktor yang penting dalam menentukan suatu pemilihan moda transportasi pada kelompok mahasiswa.
Evaluasi Waktu dan Biaya Pelaksanaan Pembangunan Gedung Rektorat Universitas Muhammadiyah Riau Tahap I Jalan Tuanku Tambusai – Pekanbaru Riau: Evaluation of Implementation Time and Cost of Rectorate Building of Universitas Muhammadiyah Riau Phase I Jalan Tuanku Tambusai - Pekanbaru Riau Saifullah, Saifullah; Wanim, Arhan; Boer, Astuti
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (946.138 KB)

Abstract

[ID] Perkembangan teknologi dewasa ini terus memperlihatkan grafik kemajuan yang begitu pesat, hampir di segala bidang. Begitu pula dengan bidang konstruksi gedung yang semakin maju dan berkembang. Pembangunan Gedung Rektorat Universitas Muhammadiyah Riau bertujuan untuk meningkatkan sarana dan prasarana pendidikan Universitas Muhammadiyah Riau itu sendiri. Dalam setiap pembangunan kendala - kendala yang sering dihadapi dalam pelaksanaan pekerjaan adalah terjadinya keterlambatan waktu pelaksanaan pekerjaan. Waktu pelaksanaan pekerjaan merupakan salah satu unsur penting dalam manajemen konstruksi apabila terjadi keterlambatan pekerjaan akan terjadi pula pembengkakan anggaran biaya pekerjaan. Jika dalam suatu pelaksanaan pekerjaan terjadi keterlambatan, maka perlu dilakukan evaluasi waktu pada beberapa aktivitas proyek. Tujuan penelitian ini untuk mengetahui apakah waktu pelaksanaan pekerjaan sudah sesuai dengan waktu rencana awal dan menganalisa kemungkinan memperpendek waktu pelaksanaan dari realisasi lapangan. Dalam penelitian ini, digunakan dua langkah pengumpulan data yaitu observasi lapangan dan wawancara. Untuk mengatasi keterlambatan pekerjaan digunakan dua metode pada Pembangunan Gedung Rektorat Universitas Muhammadiyah Riau, yaitu dengan menggunakan metode kerja lembur dan metode penambahan tenaga kerja baru. Pada metode kerja lembur upah yang harus dibayar kepada pekerja lebih tinggi 1,5 atau 2 kali upah biasa. Sedangkan pada metode penambahan tenaga kerja upah untuk tenaga baru sama dengan pekerja tetap, ditambah dengan biaya transportasi dan uang makan. Berdasarkan hasil analisa pemendekan durasi dilakukan selama 21 hari kerja pada 18 kegiatan pekerjaan yang terdapat pada lintasan kritis. Penambahan biaya dengan metode kerja lembur sebesar Rp.265.842.755,00dengan metode penambahan tenaga kerja baru sebesar Rp.298.472.000,00. Dari kedua metode yang ditinjau didapat bahwa metode kerja lembur lebih efisien dalam penambahan biaya karena jumlah biaya yang dikeluarkan lebih kecil. [EN] Today's technological developments continue to show a graph of progress so rapidly, almost in all areas. Similarly, the construction of buildings that more advanced and growing. Development of Rectorate Building University of Muhammadiyah Riau aims to improve facilities and infrastructure education of Muhammadiyah University of Riau itself. In every development constraint - constraints that often faced in the implementation of work is the occurrence of delay in the implementation of work. Timing of the work is one of the most important elements in construction management in the event of a delay in work will also occur swelling budget work costs. If there is a delay in the implementation of the work, it is necessary to evaluate the time in some project activities. The aims of this study is to determine whether the timing of the implementation of the work is in accordance with the time schedule plan and to analyze the possibility of shortening time. In this study, using two steps of data collection is works observation and interview. To overcome the delay of work using two methods on the Rectorate Building Building University of Muhammadiyah Riau, they are by using method of overtime work and method of addition of new worker. In the method of overtime work wages to be paid to workers is higher 1.5 or 2 times the usual wage. While on the method of adding labor wages for new personnel equal to permanent workers, included with the cost of transportation and money to eat. Based on the results of the crash program analysis conducted during 21 working days on 18 work activities contained on the critical path. The additional cost with the overtime method of Rp.265.842.755,00 with the method of adding new workforce of Rp.298.472.000,00. From the of method showing that methods reviewed, it is found that the overtime method more efficient in adding cost because the amount of expenses is smaller.
Evaluasi Keandalan Sistem Proteksi Kebakaran Pada Bangunan Gedung (Studi Kasus Gedung PT. PLN Wilayah Riau Dan Kepulauan Riau): Reliability Evaluation of Fire Protection SystemsIn building (Case Study of PT. PLN Building in Riau and Riau Islands Region) Ruspianof, Arda Dwi Cahyo; Retno, Deddy Purnomo; Mildawati, Roza
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (513.193 KB)

Abstract

[ID] Bangunan gedung merupakan wujud fisik dari hasil pekerjaan konstruksi yang menyatu dengan tempat kedudukannya, sebagian maupun seluruhnya berada di atas, di dalam tanah dan air, yang berfungsi sebagai hunian atau tempat tinggal, kegiatan keagamaan, kegiatan usaha, kegiatan sosial budaya, maupun kegiatan khusus. Faktor keselamatan menjadi persyaratan penting yang harus dipenuhi oleh suatu bangunan gedung (UURI,2002) Salah satu aspek keselamatan kerja tersebut adalah keselamatan dari bahaya kebakaran maupun ledakan. Kebakaran merupakan suatu peristiwa atau kejadian yang sangat merugikan semua pihak, baik pihak pengelola atau pengguna gedung, pemilik gedung, maupun masyarakat yang berada di sekitar gedung (UURI, 1970). Metode yang digunakan dalam penelitian ini adalah metode analisis deskriptif. Dimana untuk mendapatkan data yang dibutuhkan, dilakukan pengamatan langsung di lapangan. Komponen yang diidentifikasi yaitu kelengkapan tapak, sarana penyelamatan, sistem proteksi aktif dan sistem proteksi pasif. Pengamatan ini dilakukan untuk mengetahui ketersediaan alat proteksi dan Nilai Keandalan Sistem Keselamatan Bangunan (NKSKB) pada gedung PT. PLN Wilayah Riau dan Kepulauan Riau. Hasil dari penelitian ini menyatakan bahwa sistem proteksi kebakaran pada gedung PT. PLN Wilayah Riau dan Kepulauan Riau sebagian besar telah tersedia. Dengan nilai keandalan pada lantai dasar (87,878%), lantai 1 (87,878%), lantai 2 (87,878%), lantai 3 (87,878%), dan lantai 4 (87,878%). Sedangkan nilai keandalan pada gedung PT. PLN Wilayah Riau dan Kepulauan Riau sebesar 86,47%, hal ini berarti menurut Pd–T–11–2005–C nilai keandalan bangunan terhadap bahaya kebakaran adalah andal. [EN] Building is a physical manifestation of the work of construction that blends with its domicile, partly or wholly located above and / or in the soil and / or water, which serves as a dwelling or residence, religious activities, business activities, social culture activities, as well as special events. Safety factors become essential requirements that must be met by a building (Act No. 28 of 2002 Section 1 on Building). One aspect of the work safety is the safety of the danger of fire or explosion. Fire is an event or events that are very detrimental to all parties, either the manager or the user of the building, the owner of the building, and the people who were around the building (Act No. 1 of 1970 Chapter II Article 2 of the Scope of Work Safety). The method used in this research is descriptive analysis method. Where to get the required data, direct observation was conducted in the field. Components were identified as completeness footprint, rescue facilities, active protection system and passive protection system. These observations were made to check the availability of protective devices and Value of Building Safety System Reliability (NKSKB) on building the PT. PLN Region Riau and Riau Islands. The results of this study stated that the fire protection systems in buildings PT. PLN Riau and Riau Islands region has been largely unavailable. With the value on the ground floor (87.878%), 1st floor (87.878%), 2nd floor (87.878%), 3rd floor (87.878%), and the 4th floor (87.878%). While the value of reliability in building the PT. PLN Riau and Riau Islands region at 86.47%, which means according to the Pd-T-11-2005-C value of the reliability of the building against fire is reliably.
Analisis Risiko Pekerja Pengelasan Terhadap Kesehatan Ditinjau Dari Ergonomi Di CV Las Jasa Muda Kota Pekanbaru: Health Risk Analysis of Welding Work from Ergonomics point of view at CV Las Jasa Muda, Pekanbaru City Edigan, Firman; Putra, Abriansyah
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (481.768 KB)

Abstract

[ID] CV Las Jasa Muda Pekanbaru adalah bengkel jasa pengelasan baik rumah tangga maupun industri. Dalam melakukan proses pengelasan masih menggunakan alat yang dipergunakan manusia secara manual sehingga aktivitas dalam melakukan pekerjaan memiliki risiko yang menyebabkan masalah kecelakaan yang berpengaruh terhadap kesehatan. Tujuan penelitian ini adalah untuk menganalisis risiko kesehatan yang berhubungan dengan postur kerja, kebisingan dan durasi kerja. Penelitian ini merupakan penelitian kualitatif yang bersifat deskriptif, yang bertujuan untuk mendapatkan informasi dengan metode wawancara, observasi serta pengukuran REBA, NBM dan kebisingan dimana penelitian ini dilakukan di CV Las Jasa Muda Pekanbaru. Subjek penelitian ini berjumlah 5 informan yaitu seluruh pekerja. Variabel dalam penelitian ini yaitu postur kerja, kebisingan, durasi kerja. Hasil penelitian diketahui bahwa masih banyak terdapat postur kerja yang dapat menyebabkan risiko tinggi bagi kesehatan pekerja yaitu pada angka 9, tingginya tingkat kebisingan yang diterima pekerja sekitar 86-92,7 dB dapat menyebabkan masalah kesehatan serius dan durasi kerja yang cenderung lama membuat pekerja menjadi lelah, serta kebisingan yang melebihi nilai ambang batas yang menyebabkan masalah kesehatan yaitu hipertensi dan stres. Untuk mengurangi risiko dalam bekerja adalah dengan sosialisasi terkait keselamatan dan kesehatan kerja, meningkatkan kesadaran pentingnya kesehatan dan keselamatan bagi pekerja dengan tujuan untuk menciptakan kondisi pekerjaan yang aman serta terjaminnya kesehatan pekerja dan memberikan APD earplug pada pekerja untuk menghindari kebisingan yang berlebih. [EN] CV Las Jasa Muda Pekanbaru is workshop services welding domestic and industry. In welding still used the manually tool that human in activity having risk work that causes trouble accident influence on health. The purpose of this research is to analyze health risks associated with work posture, noise and work duration. The research is qualitative that are descriptive, aims to get information with the interview, observation and measurement of REBA, NBM and noise where the study is done at CV Las Jasa Muda Pekanbaru. The subject this research is 5 informants all workers. This variabel research is work posture, noise, work duration. The results of research known that there are still many work posture that can cause risk high for health workers namely at approximately 9, the high level noise for workers around 86-92,7 dB can cause serious problems health and work duration old workers to make tired, the noise threshold above value that causes health problems that hypertension and stress. To reduce risk of work is to socialize the work safety and health, raise awareness the importance of safety and health for workers with the aim of condition creating of a job that safe and guaranteeing the health and give PPE earplug on workers to avoid the noise excess.
Perbandingan Kuat Tekan Beton Dengan Menggunakan 4 Cara Perawatan: Comparation Compressive Strength Of Concrete By Using 4 Ways Of Curing Supriadi, Supriadi; Dewi, Sri Hartati
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (695.129 KB)

Abstract

[ID] Beton merupakan material paling sering digunakan dalam dunia konstruksi, baik konstruksi bangunan maupun infrastruktur jalan. Sifat beton diketahui akan lebih baik jika kuat tekan betonnya lebih tinggi, dengan demikian mutu beton didasari oleh kuat tekan beton. Semakin besar kuat tekan beton maka semakin baik mutu beton, namun demikian mutu setiap beton sangatlah bervariasi. Hal ini dipengaruhi oleh beberapa faktor salah satunya yaitu curing atau perawatan beton. Usaha perawatan pada umumnya sering terabaikan atau kurang diperhatikan. Penelitian ini bertujuan untuk menentukan cara perawatan beton yang lebih baik. Pada penelitian ini menggunakan sampel beton berbentuk silinder, sampel dicetak dan dibiarkan dalam cetakan ± 24 jam, sampel dibuat sebanyak 36 sampel, Dalam penelitian ini perawatan yang digunakan adalah perendaman dalam air, diselimuti goni, diluar ruangan, didalam ruangan, Dilakukan analisa uji kuat tekan di Laboratorium masing-masing pada umur 7, 14 dan 28 hari, jumlah sampel pada masing-masing setiap jenis perawatan dan umur beton sebanyak 3 sampel. Analisis kuat tekan beton dilakukan dengan SNI 03-2834-2000. Hasil penelitiaan ini menunjukan bahwa beton dengan perawatan direndam dapat meningkat kuat tekan beton, sedangkan untuk beton yang didalam ruangan, diluar ruangan dapat mengurangi kekuatan tekan beton. Setelah dilakukan perhitungan dalam penelitian ini didapatkan hasil kuat tekan rata-rata beton pada umur 28 hari yang direndam diperoleh sebesar 18.05 MPa, dan selimuti goni didapat sebesar 17,67 MPa, sedangkan untuk beton yang didalam ruangan, diluar ruangan diperoleh sebesar 16,24 MPa dan 14,95 MPa, pada pekerjaan dilapangan sangat sulit mengaplikasikan jenis perawatan direndam di dalam air, maka dapat diambil jenis perawatan diselimuti goni karena memiliki nilai kuat tekan beton melebihi mutu beton rencana dibanding perawatan di luar ruangan dan di dalam ruangan. [EN] Concrete is the most common material used in the construction world, both building construction and road infrastructure. The nature of the concrete is known to be better if the compressive strength of the concrete is higher, thus the quality of the concrete is based on the compressive strength of the concrete. The greater the compressive strength of the concrete the better the quality of the concrete, however the quality of each concrete varies greatly. This is influenced by several factors one of which is curing or concrete treatment. Nursing care in general is often overlooked or poorly cared for. This study aims to determine how better concrete treatment. In this study using cylindrical concrete sample, the sample is printed and left in the mold ± 24 hours, the sample is made as many as 36 samples. In this research the treatment used is water immersion, covered by jute, outside the room, in the room, in each laboratory at the age of 7, 14 and 28 days, the number of samples in each type of treatment and the concrete age of 3 samples. Analysis of concrete compressive strength was done with SNI 03-2834-2000. The results of this research show that concrete with soaked treatment can increase the compressive strength of concrete, while for concrete inside the room, outside the room can reduce the compressive strength of concrete. After calculation in this research got result of compressive strength strength of concrete average at 28 days soaked obtained by 18.05 MPa, and blanket goni obtained 17,67 MPa, while for concrete inside room, outside room obtained equal to 16,24 MPa and 14,95 MPa, in the field work is very difficult to apply the type of treatment soaked in the water, it can take the type of treatment covered with jute because it has a value of concrete compressive strength exceeds the quality of concrete plans compared to outdoor treatments and indoors.
Studi Karakteristik Fondasi Pelat Tipis Dengan Pengaku Tiang “+” Pada Tanah Granuler Melalui Uji Eksperimen Dan Analisis Pemodelan Menggunakan Software Abaqus: Study of Characteristics of Thin Plate Foundation with Stiffener "+" in Granular Soil through Experimental Test and Analysis Modeling Using Abaqus Software Syarif, Firman; Adi, Agus Darmawan; Saputra, Ashar
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1271.702 KB)

Abstract

[EN] The amount of damage that happened in Indonesian road is the impact of high traffic load exceeds the carrying capacity of the pavement. To reduce the problems that occur on the pavement the good systems of pavement are built, various studies conducted to produce a creative innovation in order to evaluate and improve the performance of the pavement system. this study has developed a new system of foundation with pile "+" to make the connection between plate and minipile (joint) becomes better. In this study, three models of foundation will be tested by loading test (following ASTM D 114 381 and ASTM D 3689 Pile Under static axial compressive load) to observe and analyze the behavior of the foundation model by loading centric and eccentric. In addition to laboratory tests this research also modeling analysis with Abaqus software to observe and analyze the behavior of the foundation model in terms of deformation and settlement. The results showed the distances between pile and pile provides a significant contribution in reducing the settlement in the foundation when given a maximum load of 20 kN, where is the foundation 1 had short distance between the other foundation the deformation and settlement is the smallest. The length of pile also give significant contribution to reduce the settlement like in foundation 3 that have 20 cm length of the pile have settlement and deformatioan smaller than the foundation 2 that have 10 cm length of the pile
Perbandingan Perhitungan Perencanaan Tebal Perkerasan Jalan Lentur Dengan Dua Metode Pada Jalan Simpang Fajar – Lintas Bono Kabupaten Pelalawan: Calculation comparation for pavement thickness design of flexural road with two method in Fajar – Lintas Bono Crossroad Pelalawan District Mildawati, Roza
JURNAL SAINTIS Vol. 17 No. 2 (2017)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1099.482 KB)

Abstract

[ID] Kabupaten Pelalawan memprioritaskan pembangunan pada sektor transportasi darat dengan memperluas jaringan jalan, hingga menuju pelosok-pelosok desa yang selama ini masih terisolir sebagai akibatnya ketidaklancaran transportasi dan pertumbuhan ekonomi masyarakat didaerah tersebut. Tujuan dari penelitian ini untuk mengetahui jumlah lalu lintas harian rata-rata yang melalui jalan perkerasan lentur Simpang Fajar – Lintas Bono Kabupaten Pelalawan dan membandingkan tebal perkerasan lentur pada ruas jalan Simpang Fajar – Lintas Bono Kabupaten Pelalawan dengan menggunakan Metode Pt.T 01-2002 B dan Metode Bina Marga (analisa komponen 1987). Pada penelitian ini menghitung perkerasan lentur dengan menggunakan Metode Pt.T 01-2002 B dan Metode Analisa Komponen 1987 yang sesuai dengan tujuan penelitian dengan mempertimbangkan kondisi tanah dan lingkungan sekitar, menghitung besar tingkat pertumbuhan lalu lintas pada ruas jalan Simpang Fajar –Lintas Bono Kabupaten Pelalawan. Berdasarkan hasil analisa data lalu lintas tahun 2016 didapat besar persentase pertumbuhan lalu lintas pada ruas jalan Simpang Fajar –Lintas Bono Kabupaten Pelalawan adalah ( i ) = 4.7 %. Berdasarkan penelitian yang dilakukan didapat LHR untuk analisa lalu lintas harian rata-rata pada hari senin, rabu, jumat dan minggu pada ruas Jalan Simpang Fajar – Lintas Bono dengan total LHR pada tahun 2015 sebesar 1678 (kend/hari/2 arah) dan tahun 2016 yang berjumlah 1777 (kend/hari/2 arah). Untuk hasil analisa Metode Pt.T 01-2002 B diperoleh total tebal perkerasan 50 cm dengan D1 = 8 cm, D2 = 11 cm, D3 = 31 cm dan untuk Metode Analisa Komponen 1987 diperoleh total tebal perkerasan 58.5 dengan D1 = 7.5 cm, D2 = 15 cm, D3 = 36 cm. Berdasarkan hasil penelitian penulis mengambil kesimpulan bahwa Metode Pt.T 01-2002 B lebih sesuai dengan standart yang digunakan karena Metode Pt.T 01-2002 B sudah memperhitungkan koefisien drainase. [EN] Pelalawan Regency prioritizes the development of the land transportation sector by expanding the road network, to the remote areas of the village that has been isolated as a result of the lack of transportation to the area. The purpose of this research is to know the average daily traffic quantity through the flexible pavement road of Simpang Fajar - Lintas Bono Pelalawan Regency and compare the thickness of the flexible pavement on Simpang Fajar - Lintas Bono Road in Pelalawan Regency using Pt.T 01-2002 B and the DGH method (component analysis 1987). In this study, calculate the flexible pavement using Method Pt.T 01-2002 B and Component Analyzer Method 1987 in accordance with the objectives of the study by considering the condition of the soil and the surrounding environment, calculate the level of traffic growth on Simpang Fajar -Lintas Bono, Pelalawan.Based on the results of traffic data analysis in 2016 obtained a large percentage of traffic growth on the road Simpang Fajar -Lintas Bono Pelalawan District is (i) = 4.7%. Based on the research, LHR obtained for daily traffic analysis on Monday, Wednesday, Friday and Sunday at Simpang Fajar - Lintas Bono with total LHR in 2015 of 1678 (kend / hari / 2 arah) and 2016 which amounted to 1758 (kend / hari / 2 direction). For the result of Pt.T 01-2002 B method, the total of pavement thickness 50 cm with D1 = 8 cm, D2 = 11 cm, D3 = 31 cm and for Component Analyzer Method 1987 obtained total thickness of pavement 58.5 with D1 = 7.5 cm, D2 = 15 cm, D3 = 36 cm. Based on the results of research the authors conclude that the method Pt.T 01-2002 B more in accordance with the standard used because the method Pt.T 01-2002B has taken into account the drainage coefficient.

Page 1 of 1 | Total Record : 9