cover
Contact Name
Sumardi Sadi
Contact Email
jurnalteknikumt@gmail.com
Phone
+6281328193939
Journal Mail Official
mardiesadi99@gmail.com
Editorial Address
Jl. Perintis Kemerdekaan I No 33 Cikokol Kota Tangerang
Location
Kota tangerang,
Banten
INDONESIA
JURNAL TEKNIK
ISSN : 23028734     EISSN : 25810006     DOI : http://dx.doi.org/10.31000/jt.v9i2
Jurnal Teknik merupakan kumpulan artikel dari berbagai program studi keteknikan dan Education, Sains dan Teknologi, yaitu Teknik Elektro, Teknik Mesin, Teknik Sipil, Teknik Industri dan Teknik Informatika, Teknologi Kelautan, Teknologi Perikanan Laut, Teknologi Pertanian, atau artikel program studi keteknikan lainnya. P-ISSN 2302-8734 dan E-ISSN : 2581-0006. Jurnal Teknik menerima artikel dari khalayak umum dibidang keteknikan, baik regional maupun nasional, semua jurnal akan diproses sesuai prosedur publikasi ojs yang berlaku. Pada edisi volume 8 semua artikel yang masuk dibatasi dengan plagiarisme cheker masimal 30%, untuk edisi berikutnya vol 9 dan seterusnya semua artikel dibatasi oleh plagliarisme cheker maksimum 20%. Artikel harus langsung disubmit oleh penulis dengan email penulis.
Articles 652 Documents
ANALISIS PROYEK PEMBANGUNAN TOWER TELEKOMUNIKASI DENGAN METODE CRITICAL PATH METHOD ( Suatu Kajian Pada PT. Ciptajaya Sejahtera Abadi di Jakarta ) Hermanto Hermanto
Jurnal Teknik Vol. 2 No. 2 (2013): Juli-Desember 2013
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v2i2.3954

Abstract

suatu jaringan kerja yang cepat, tepat dan efisien, dalam melakukan penjadwalan waktu proyek yang dikerjakan dengan menggunakan metode CPM (Critical Path Method), dengan bantuan software microsoft project dan WinQSB-2 sehingga diperoleh waktu penyelesaian proyek yang optimal dengan biaya pelaksanaan dilapangan dapat di tekan serendah mungkin, tanpa mengurangi mutu pekerjaan. Metode Penelitian yang digunakan adalah metode pengembangan proyek, dengan penelitian yang bersifat kualitatif yang dikuantitatifkan yaitu mengumpulkan data sebanyak-banyaknya mengenai faktor-faktor yang merupakan pendukung dalam penelitian, kemudian menganalisis faktorfaktor tersebut untuk dicari peranannya sebagai perhitungan waktu penjadwalan proyek yang benar dan baik dalam melakukan suatu kegiatan yang dilakukan oleh PT. Ciptajaya Sejahtera Abadi. Setelah peneliti menganalisis data, akhirnya peneliti dapat menarik kesimpulan bahwa terdapat Alternatif waktu penjadwalan yang dipilih dengan menggunakan waktu yang optimal 36 hari, karena waktu penyelesaiannya lebih cepat 9 hari dari waktu normal dengan biaya crash program Rp 228.606.085,00 dengan biaya tambahan cost slope Rp 6.125.856,00 maka biaya tersebut adalah biaya yang optimal dengan waktu dan biaya yang lebih efisien dan efektif.
PERANCANGAN DAN ANALISA PENGENDALIAN KECEPATAN MOTOR ARUS SEARAH 15 HP DENGAN α = 00 - 750 MENGGUNAKAN TC 780 DAN SCR Sumardi Sadi
Jurnal Teknik Vol. 2 No. 2 (2013): Juli-Desember 2013
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v2i2.3955

Abstract

Pengendalian Kecepatan Motor DC merupakan pengaturan kecepatan pada motor dc melalui komponen SCR, pengaturan ini sering digunakan dalam automatisasi di industri, diperlukan karena beberapa mesin yang digunakan harus diatur setepat mungkin. Aplikasi pengendalian kecepatan motor pada umumnya diterapkan pada mesin-mesin yang sistem kerjanya memerlukan variasi putaran, misalnya pada automatisasi dengan sistem konveyor, atau pada pengepakan produk, dimana beberapa konveyor bisa berjalan bersamaan dengan kecepatan yang berbeda-beda. Untuk memenuhi kebutuhan pengendalian motor DC tersebut, maka perlu suatu alat yang digunakan untuk mengatur putaran motor dc yang handal, hal ini dapat dilakukan dengan mengontrol besar arus pada daya suatu system automatisasi tersebut. Pengendalian motor DC dalam perancangan ini menggunakan IC TC 780, Op-Amp, dan SCR. Pengaturan SCR dikendalikan oleh gate, yang mana besar arus gate tersebut didapatkan dari TC 780. Komponen TC 780 dapat berfungsi mengatur sudut penyalaan SCR dengan sudut antara 0o sampai dengan 180o. Arus yang keluar dari TC 780 kemudian dikuatkan oleh Op-Amp dan selanjutnya digunakan untuk penyalaan SCR melalui gate SCR tersebut. Prinsip kerja utama dari perancangan ini adalah 1). melakukan pengaturan tegangan sebagai tegangan referensi, 2). Tegangan referensi digunakan sebagai input pengontrol TC 780. 3) Output yang dihasilkan TC 780 dikuatkan melalui rangkaian buffer/Op-Amp, 4). Rangkaian output dari rangkaian buffer digunakan untuk gate SCR, 5). Dengan adanya arus yang masuk melalui gate tersebut, selanjutnya SCR mengendalikan motor DC.Perancangan ini digunakan untuk mengendalikan motor DC tiga fasa. SCR dapat digunakan untuk mengendalikan daya besar dengan energy kendali minimum. Komponen control IC TCA 780 digunakan sebagai pembangkit pulsa pemicu SCR yang dan dapat mensinkronkan kerja dari SCR lebih efisien. Pengaturan sudut penyalaan SCR bertujuan supaya keluar tegangan arus serah juga dapat diatur. Berdasarkan pengujian pada Motor DC 15 HP dengan α = 00 – 750 didapatkan putaran antara 309 – 1518 RPM, dengan Daya Jangkar (Ea) antara 92,8 – 45,4 Volt serta Daya DC (Pdc) antara 3,5 – 13 Hp.
Penyisihan Warna dan Zat Organik Pada Air Gambut Secara Koagulasi-Flokulasi dengan Koagulan Belimbing Wuluh Lisa Asmiyarna; Syarfi Daud; Lita Darmayanti
Jurnal Teknik Vol. 11 No. 2 (2022)
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v11i2.3995

Abstract

Peat water has potential as a source of clean water because of its ample availability but qualitatively it still does not meet the standards according to Permenkes No.32 Tahun 2017 quality of clean water, such as organic substances and colors that are still high. This study uses a coagulation-flocculation methods using a Averrhoa bilimbi juice and alum. The variation are dosage averrhoa bilimbi juice (22,5 ml, 25 ml, 27,5 ml) with alum 0,25 gr and pH 4, 5, 6, 7, 8 in setting aside color and organic matter. The results showed that the treatment of peat water in the treatment variation 27,5 ml, alum 0,25 gr and pH condition 4 is already the best result for water quality requirements. Decreasing the colour with value  95,61% and organic substances is about 71,18%.
Faktor-faktor yang Berhubungan dengan Tindakan Tidak Aman pada Pekerja di Proyek Pembangunan Apartemen Evencho Margonda Sempurna Bangun; Indriasari Indriasari
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4003

Abstract

Unsafe action becomes a problem for most work accidents. This study focuses on the factors associated with unsafe actions caused by various kinds of causes or factors both within the worker and the work environment. The construction industry cannot be separated from the potential hazards that can cause work accidents. Analysis of unsafe actions is needed in an effort to prevent the number of accidents at work. The research was conducted using a cross sectional research design or method and included in descriptive research. The interview questionnaire was addressed to workers as many as 75 workers. Research variables aimed at resource persons include knowledge, motivation, supervision, K3 training and the availability of PPE. The assessment of unsafe actions was carried out by entering the results of the interviewee's questionnaire using the SPSS V20 application. From the results of the questionnaire research, 70 workers found unsafe actions were carried out by 44% of the workers. the lack of knowledge factor was 18.7%, the low motivation factor was 46.7%, the supervisory factor was less than 9.3%, the factor of workers who did not attend K3 training was 17.3%, and the factor of lack of availability of Personal Protective Equipment was 10.7 % of all factors with the strongest association with unsafe action. Monitoring and training are required to increase the knowledge of workers so that they can better avoid accidents caused by the factors that have been studied.Keywords: Unsafe measures,Construction Industry, Factors Unsafe action factor (Tindakan yang tidak aman menjadi masalah bagi sebagian besar kecelakaan kerja. Penelitian ini memfokuskan pada faktor-faktor yang terkait dengan tindakan tidak aman yang disebabkan oleh berbagai macam penyebab atau faktor baik di lingkungan pekerja maupun lingkungan kerja. Industri konstruksi tidak lepas dari potensi bahaya yang dapat menyebabkan kecelakaan kerja. Analisis tindakan tidak aman diperlukan dalam upaya mencegah banyaknya kecelakaan kerja. Penelitian dilakukan dengan menggunakan desain atau metode penelitian cross sectional dan termasuk dalam penelitian deskriptif. Kuesioner wawancara ditujukan kepada pekerja sebanyak 75 pekerja. Variabel penelitian yang ditujukan pada nara sumber meliputi pengetahuan, motivasi, supervisi, pelatihan K3 dan ketersediaan APD. Penilaian tindakan tidak aman dilakukan dengan memasukkan hasil kuesioner narasumber menggunakan aplikasi SPSS V20. Dari hasil penelitian kuisioner, 70 pekerja menemukan tindakan tidak aman yang dilakukan oleh 44% pekerja. Faktor pengetahuan kurang 18,7%, faktor motivasi rendah 46,7%, faktor pengawasan kurang dari 9,3%, faktor pekerja yang tidak mengikuti pelatihan K3 sebanyak 17,3%, dan faktor kurangnya ketersediaan alat pelindung diri. Peralatan adalah 10,7% dari semua faktor dengan hubungan terkuat dengan tindakan tidak aman. Pemantauan dan pelatihan diperlukan untuk meningkatkan pengetahuan pekerja agar dapat lebih terhindar dari kecelakaan yang disebabkan oleh faktor-faktor yang telah dipelajari.Kata Kunci: Tindakan tidak aman, Industri Konstruksi, Faktor Faktor tindakan tidak aman.)
SOLAR CELL OTOMATIS DENGAN PENGATURAN DUAL AXIS TRACKING SYSTEM MENGGUNAKAN ARDUINO UNO Indrawan Nugrahanto; Sungkono Sungkono; Muhammad Khairuddin
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4004

Abstract

Pertambahan jumlah penduduk dan juga kemajuan teknologi saat ini membuat kebutuhan masyarakat akan energi listrik saat ini semakin tinggi. Maka dari itu sangat diperlukan sumber energi alternatif, salah satunya yaitu dengan memanfaatkan energi matahari. Dengan menggunakan solar cell, energi matahari dapat dikonversi menjadi energi listrik. Namun, pemasangan solar cell saat ini masih bersifat konvensional (tidak mengikuti pergerakan matahari). Sehingga energi listrik yang dihasilkan tidak. Untuk mengatasi masalah tersebut maka penulis membuat solar tracker yang dirancang secara otomatis agar solar cell dapat mengikuti pergerakan matahari sehingga mampu menyerap cahaya matahari secara maksimal. Pergerakan solar tracker ditentukan berdasarkan Data posisi matahari selama setahun, dan menggunakan metode Pembacaan database dari sudut Azimuth dan sudut Elevation yang kemudian diproses oleh Arduino uno, dalam menentukan posisi aktuatornya. Kata Kunci :Solar cell, Arduino Uno, Database
RANCANG BANGUN MODUL PELATIHAN DENGAN MENGGUNAKAN SENSOR, SISTEM KENDALI DAN AKTUATOR ELEKTRONIK Elka Faizal; Indrawan Nugrahanto; Sungkono Sungkono
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4005

Abstract

Penggunaan perangkat otomasi berupa sensor, sistem kendali, maupun aktuator berasal dari berbagai jenis, model, merk, dan tipe sudah lazim digunakan pada berbagai kegiatan di dunia industri. Pengetahuan pengguna sangat dperlukan untuk menggunakan perangkat industri yang berbeda-beda ini sebagai upaya kesalahan saat penggunaannya. Namun, masih banyak ditemukan mahasiswa dan masyarakat umum yang belum memahami cara penggunaan perangkat-perangkat yang lazim digunakan di dunia industri. Hal ini yang mendasari penulis untuk membuat sebuah modul pelatihan yang dapat digunakan sebagai media pembelajaran yang akan memberikan pengetahuan mengenai piranti yang lazim digunakan di industri seperti sensor proximity, temperature controller, dan relay. Modul pelatihan yang dirancang penulis ini digunakan sebagai media praktikum mahasiswa pada mata kuliah Sensor dan Transducer dengan harapan mahasiswa mampu memahami penggunaan sensor, kendali dan actuator elektronik sebagai persiapan mahasiswa menghadapi dunia industri.Kata Kunci: Modul pelatihan Sensor proximity Kendali suhu
Struktur SRPMK DAN SRPMM Pada Bangunan Tinggi (Structure of SRMK and SRMM on High Building) Almufid Almufid; Egi Santoso
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4025

Abstract

In the planning of building structures, it is necessary to have precise calculations so that the structure obtained is strong against loads and is certainly economical. From a geographical point of view, Indonesia is one of the countries on the most active earthquake route in the world because it is surrounded by the Pacific Ring of Fire and is above three continental plate collisions (triple junction plate convergence), thus making Indonesia a country that is has a high earthquake risk level. In Indonesia itself there are several provisions that apply where there are regulations in planning a building to be earthquake resistant. As for this research study is to plan a 10-story apartment structure using the Special Moment Bearer Frame System (SRPMK) and the Intermediate Moment Bearer Frame System (SRPMM) based on SNI 2847-2019, SNI 1726-2019, and SNI 1727-2013 and other provisions. applicable in Indonesia to support earthquake resistant building planning. At this stage, it begins with preliminary design, then structural modeling and analysis is assisted using the ETABS program. From the planning results obtained in the form of dimensions and differences from the calculation of reinforcement between the two systems used.Keywords: SRPMK, SRPMM, Earthquake Resistant Building Planning, ETABS (Dalam perencanaan struktur bangunan diperlukan adanya perhitungan yang tepat agar struktur yang didapat kuat terhadap beban serta yang pasti ekonomis. Jika dilihat dari segi geografis Indonesia menjadi salah satu negara yang berada di jalur gempa teraktif di dunia karena dikelilingi oleh Cincin Api Pasifik (Ring of Fire) dan berada di atas tiga tumbukan lempeng benua (triple junction plate convergence), sehingga menjadikan Indonesia sebagai negara yang memiliki tangkat resiko gempa cukup tinggi. Di Indonesia sendiri ada beberapa ketentuan yang berlaku dimana ada peraturan-peraturan dalam merencanakan suatu bangunan agar tahan terhadap gempa. Adapun dari studi penelitian ini adalah merencanakan struktur apartemen 10 lantai menggunakan Sistem Rangka Pemikul Momen Khusus (SRPMK) dan Sistem Rangka Pemikul Momen Menengah (SRPMM) berdasarkan SNI 2847-2019, SNI 1726-2019, dan SNI 1727-2013 serta ketentuan-ketentuan lain yang berlaku di Indonesia untuk menunjang perencanaan bangunan tahan gempa. Pada tahapannya diawali dengan preliminary design, lalu pemodelan serta analisa struktur dibantu menggunakan program ETABS. Dari hasil perencanaan didapat berupa dimensi dan perbedaan dari hasil perhitungan tulangan antara kedua sistem yang digunakan..Kata Kunci: SRPMK, SRPMM, Perencanaan Bangunan Gedung Tahan Gempa, ETABS)
PERANAN PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONTRUKSI (PROJECT MANAGER ROLE ON CONSTRUCTION PROJECTS SUCCESS) Hesty Erviani Zulaecha; Almufid Almufid; Zamroni Zamroni; Ryan Novianto
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4026

Abstract

The role of a project manager can be seen from a knowledge, performance and personal perspective. Meanwhile, the success of a construction project can be seen from the efficiency of the project being managed and the project that is managed, which can be of the right quality, on time and on cost from customer desires and contribution to a company. The purpose of this study is to determine the stages of competence that are very influential on the success of a construction project and to find out how much influence the project manager's competence has on the success of a construction project. Data collection was carried out by distributing questionnaires to 6 building construction projects that are being carried out by private companies such as contractors, construction management and owners. Data processing using statistical analysis method using SPSS software. The results of the analysis of the knowledge, performance and personal variables show that the variable that most influences the success of a building construction project is the performance variable followed by the knowledge and performance variables with standardized regression coefficient (Beta) of X1 =, X2 = and X3 =.Keywords: project success, project management competence, project manager, multiple linear regress.(Peranan seorang project manager dapat dilihat dari segi pengetahuan, kinerja dan pribadi. Sedangkan keberhasilan proyek konstruksi dilihat dari efisiensi proyek yang di kelola dan proyek yang di kelola dapat tepat mutu, tepat waktu dan tepat biaya dari keinginan pelanggan dan kontribusi pada sebuah perusahaan. Dari tujuan penelitian ini adalah untuk menentukan tahapan kompetensi yang sangat berpengaruh terhadap keberhasilan proyek konstruksi serta mengetahui seberapa banyak pengaruh kompetensi project manager terhadap keberhasilan proyek konstruksi. Pengumpulan data dilakukan dengan menyebarkan kuesioner pada 6 proyek konstruksi gedung yang sedang dikerjakan perusahaan swasta seperti kontraktor, management kontruksi dan owner. Pengolahan data menggunakan metode analisis stastitik menggunakan software SPSS. Hasil analisis dari variabel pengetahuan, kinerja dan pribadi menunjukkan bahwa variabel yang paling berpengaruh terhadap keberhasilan proyek konstruksi gedung adalah variable kinerja dan di ikuti oleh variabel pengetahuan dan kinerja dengan nilai koefisien regresi yang terstandarisasi (Beta) sebesar X1=, X2= dan X3=.Kata Kunci: keberhasilan proyek, kompetensi manajemen proyek,  project manager , uji regresi linier berganda)
RISIKO TERHADAP KINERJA, BIAYA DAN WAKTU PROYEK RISKS TO PROJECT PERFORMANCE, COST AND TIME Zamroni Zamroni; Almufid Almufid; Hesty Erviani Zulaecha; Ratna Maya Sari
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4027

Abstract

Project risk is an uncertain event or condition in the future, and if it occurs it will have a positive or negative impact on the achievement of project goals / objectives, including scope, schedule, cost and quality. One of the main causes of project failure is poor project risk management. There have been many studies that state that project risk management is an important factor in the success of a project. In previous studies, many results indicate that risk management must be carried out for every construction project in order to avoid losses on cost, quality and project completion schedule. Risk management planning is the first step and determines the direction of a series of other risk management activities. This process determines how to approach and plan activities in risk management will be carried out in the projectKeywords: project risk, risk management, construction project(Risiko proyek adalah  suatu peristiwa yang tidak pasti atau kondisi di masa depan, dan jika terjadi maka akan berdampak positif atau negatif terhadap pencapaian tujuan/sasaran proyek, termasuk ruang lingkup, jadwal, biaya dan kualitas. Salah satu penyebab utama kegagalan suatu proyek adalah buruknya manajemen risiko proyek. Sudah banyak penelitian yang menyatakan bahwa manajemen risiko proyek merupakan salah satu faktor penting kesuksesan suatu proyek. Pada penelitian sebelumnya banyak hasil yang menunjukkan bahwa manajemen risiko harus dilakukan bagi setiap proyek konstruksi agar dapat menghindari kerugian atas biaya, mutu dan  jadwal penyelesaian proyek. Perencanaan manajemen risiko merupakan langkah pertama dan yang menentukan arah dari rangkaian kegiatan manajemen risiko lainnya. Proses ini menentukan bagaimana pendekatan dan perencanaan kegiatan-kegiatan dalam manajemen risiko akan dilakukan di dalam proyekKata Kunci: Risiko proyek, manajemen resiko, proyek konstruksi)
PERBAIKAN INTENSITAS CAHAYA PENGGUNA KOMPUTER DENGAN PENDEKATAN ERGONOMI DI PT. UJT INDONESIA (COMPUTER USERS LIGHT INTENSITY IMPROVEMENT WITH ERGONOMIC APPROACH IN PT. UJT INDONESIA) Tina Hernawati Suryatman; Okky Hermawan
Jurnal Teknik Vol. 10 No. 1 (2021): Januari - Juni 2021
Publisher : Universitas Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/jt.v10i1.4028

Abstract

PT. UJT is an Engineering services company, Mechanical and Electrical Construction. In the process almost all office work uses a computer as its main device. This study was conducted to determine the relationship of subjective complaints of eye fatigue to the level of lighting of computer users at PT. UJT, as well as obtaining the proposed lighting design according to the standard. This type of research is descriptive correlational. The sample in this study was determined by purpose sampling, with the results of 40 computer user workers. Data collection is done by distributing questionnaires and measuring local lighting levels at the work desk. The results showed that the intensity of lighting at work tables of 34 computer users (85%) was categorized as bad because <300 lux or> 500 lux and 29 people (72.5%) computer user workers experienced subjective complaints of eye fatigue. The Chi Square Test statistical test results showed a significant relationship between the level of lighting with subjective complaints of eye fatigue, where in the degree of significance of 5%, the P value = 0.039 was obtained. Proposed lighting improvements are carried out by changing the armature height of room B lights according to room A. To achieve the target of lighting intensity of 400 lux, an additional 11 units of armature are needed and a replacement unit with MAS LED tube 1200mm UO 16Watt 865 T8 2500 lumen.Keywords: Eye Fatigue, Lighting Intensity, Chi Square Test, Lighting Design, Office PT. UJT Indonesia(PT. UJT merupakan perusahaan jasa Engineering, Konstruksi Mekanikal dan Elektrikal. Didalam prosesnya hampir seluruh pekerjaan kantor menggunakan komputer sebagai perangkat utamanya. Penelitian ini dilakukan untuk mengetahui hubungan keluhan kelelahan mata dengan tingkat pencahayaan pengguna komputer di PT. UJT, serta memberikan usulan desain pencahayaan sesuai standar. Jenis penelitian ini adalah deskriptif korelasional. Sampel pada penelitian ini ditentukan dengan cara purpose sampling, dengan hasil 40 pekerja pengguna komputer. Pengambilan data dilakukan dengan menyebarkan kuesioner dan melakukan pengukuran tingkat pencahayaan lokal di meja kerja. Hasil penelitian menunjukkan bahwa intensitas pencahayaan pada meja kerja 34 orang pengguna komputer (85%) dikategorikan buruk karena < 300 lux atau > 500 lux  dan 29 orang (72,5%) pekerja pengguna komputer mengalami keluhan kelelahan mata. Hasil pengujian statistik Chi Square Testmenunjukkan adanya hubungan yang signifikan antara tingkat pencahayaan dengan keluhan kelelahan mata, dimana pada derajat kemaknaan 5% di dapatkan nilai P value = 0,039. Usulan perbaikan pencahayaan dilakukan dengan merubah ketinggian armatur lampu ruangan B sesuai dengan ruangan A. Untuk mencapai target intensiatas pencahyaan sebesar 400 lux, diperlukan penambahan jumlah armatur sebanyak 12 unit dan penggantian unit lampu dengan tipe MAS LED tube 1200mm UO 16 Watt 865 T8 2500 lumen.Kata Kunci: Kelelahan Mata, Intensitas Pencahayaan, Chi Square Test, Desain Pencahayaan,   Kantor PT. UJT Indonesia)

Filter by Year

2012 2026


Filter By Issues
All Issue Vol. 15 No. 2 (2026): Juli - Desember 2026 Vol. 15 No. 1 (2026): Januari - Juni 2026 Vol 14, No 2 (2025): Juli - Desember 2025 Vol. 14 No. 2 (2025): Juli - Desember 2025 Vol 14, No 1 (2025): Januari - Juni 2025 Vol. 14 No. 1 (2025): Januari - Juni 2025 Vol 13, No 2 (2024): Juli - Desember 2024 Vol. 13 No. 2 (2024): Juli - Desember 2024 Vol 13, No 1 (2024): Januari - Juli 2024 Vol. 13 No. 1 (2024): Januari - Juli 2024 Vol 12, No 2 (2023): Juli - Desember 2023 Vol. 12 No. 1 (2023): Januari - Juni 2023 Vol 12, No 1 (2023): Januari - Juni 2023 Vol 11, No 1 (2022): Januari - Juni 2022 Vol. 11 No. 1 (2022): Januari - Juni 2022 Vol. 11 No. 2 (2022) Vol 11, No 2 (2022) Vol 10, No 2 (2021): Juli-Desember 2021 Vol. 10 No. 2 (2021): Juli-Desember 2021 Vol 10, No 1 (2021): Januari - Juni 2021 Vol. 10 No. 1 (2021): Januari - Juni 2021 Vol 9, No 2 (2020): Juli-Desember 2020 Vol. 9 No. 1 (2020): Januari-Juni 2020 Vol 9, No 1 (2020): Januari-Juni 2020 Vol 8, No 2 (2019): Juli-Desember 2019 Vol. 8 No. 2 (2019): Juli-Desember 2019 Vol. 8 No. 1 (2019): Januari-Juni 2019 Vol 8, No 1 (2019): Januari-Juni 2019 Vol. 7 No. 2 (2018): Juli-Desember 2018 Vol 7, No 2 (2018): Juli-Desember 2018 Vol 7, No 1 (2018): Januari-Juni 2018 Vol. 7 No. 1 (2018): Januari-Juni 2018 Vol 7, No 1 (2018) Vol. 6 No. 2 (2017): Juli-Desember 2017 Vol. 6 No. 1 (2017): Januari-Juni 2017 Vol 6, No 2 (2017): Jurnal Teknik FT UMT Vol 6, No 1 (2017): Jurnal Teknik FT UMT Vol 5, No 2 (2016): Juli-Desember 2016 Vol. 5 No. 2 (2016): Juli-Desember 2016 Vol 5, No 1 (2016): Januari-Juni 2016 Vol. 5 No. 1 (2016): Januari-Juni 2016 Vol 4, No 2 (2015): Juli-Desember 2015 Vol. 4 No. 2 (2015): Juli-Desember 2015 Vol 4, No 1 (2015): Januari-Juni 2015 Vol. 4 No. 1 (2015): Januari-Juni 2015 Vol 4, No 2 (2015) Vol 3, No 2 (2014): Juli-Desember 2014 Vol. 3 No. 2 (2014): Juli-Desember 2014 Vol. 3 No. 1 (2014): Januari-Juni 2014 Vol 3, No 1 (2014): Januari-Juni 2014 Vol. 2 No. 2 (2013): Juli-Desember 2013 Vol 2, No 2 (2013): Juli-Desember 2013 Vol 2, No 1 (2013): Januari-Juni 2013 Vol. 2 No. 1 (2013): Januari-Juni 2013 Vol 2, No 2 (2013) Vol. 1 No. 2 (2012): Juli-Desember 2012 Vol 1, No 2 (2012): Juli-Desember 2012 Vol 1, No 1 (2012): Jurnal Teknik FT UMT More Issue