cover
Contact Name
Dr. Taufiq Rochman ST, MT
Contact Email
taufiq.rochman@polinema.ac.id
Phone
+6285735783419
Journal Mail Official
prokons@polinema.ac.id
Editorial Address
Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141
Location
Kota malang,
Jawa timur
INDONESIA
Prokons: Jurnal Teknik Sipil
ISSN : 19781784     EISSN : 27148815     DOI : -
Jurnal Teknik Sipil (PROKONS), Terbit dua kali dalam setahun. PROKONS menerbitkan artikel penelitian yaitu penelitian asli teoretis dan eksperimental yang mengeksplorasi atau mengeksploitasi ide-ide dan teknik baru di empat bidang utama: teknik struktural, geomekanik, manajemen proyek konstruksi dan teknik transportasi. Tujuan jurnal ini adalah untuk memajukan ilmu pengetahuan yang berkaitan dengan teknik sipil dan berfokus pada bangunan, infrastruktur, sistem jembatan serta pemasangannya atau konstruksi.
Articles 202 Documents
KINERJA MODEL PERKERASAN RAMAH LINGKUNGAN (GREEN PAVEMENT) Marjono ,
Prokons: Jurnal Teknik Sipil Vol. 8 No. 1 February 2014
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v8i1.54

Abstract

Seiring dengan semakin meningkatnya pertumbuhan jumlah penduduk dan perkembangan ekonomi masyarakat khususya di wilayah perkotaan, maka adanya lingkungan perumahan dan fasilitas jalan yang aman dan nyaman sangat dibutuhkan. Namun yang terjadi ternyata masih jauh dari yang diharapkan, hal ini tampak ketika musim penghujan, banyak kawasan perumahan diperkotaan yang tergenang air. Sehingga keamanan dan kenyamanan penghuninya terganggu. Salah satu faktor penyebabnya adalah semakin sedikitnya lahan/ruang terbuka hijau (RTH). Hal ini diperparah dengan semakin banyaknya konstruksi jalan yang dibuat dari bahan yang kedap air seperti beton, campuran aspal, serta tidak berfungsinya sistem drainase. Konstruksi perkerasan jalan dari material berbutir (Gravel Pavement), merupakan salah satu bahan yang dapat diterapkan pada ruas jalan yang berada dikawasan pemukiman, karena dapat berfungsi ganda yaitu mampu menahan beban kendaraan yang lewat, dan mampu berfungsi sebagai resapan air, sehingga dapat mengurangi permasalahan tersebut, dan termasuk jenis konstruksi perkerasan yang ramah lingkungan (Green Pavement). Dengan metode eksperimental penelitian ini dilakukan didapatkan hasil bahwa model perkerasan yang diteliti dapat dijadikan alternatif untuk perkerasan jalan ramah lingkungan, hal ini ditunjukkan dari kinerja  model perkerasan yang mampu menyerap air pada permukaan, dengan waktu rata-rata 9,6 detik dan debit rata-rata 0,005 m3/dt atau 1,98 m3/jam.Kata-kata kunci:  perkerasan jalan, ramah lingkungan.
PERENCANAAN PERLINDUNGAN PILAR PADA JEMBATAN (Studi Kasus Bangunan Jembatan Trisula-Blitar) Winda Ekasari, Gerard Aponno, Moch. Sholeh
Prokons: Jurnal Teknik Sipil Vol. 8 No. 2 August 2014
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v8i2.71

Abstract

Trisula bridge piers located at the delta of Brantas River do not have any protection from the stream of the river when flooding. The purpose of the design is to find out the scouring happens to piers caused by the river flow, to determine what kind of protection used to protect the piers, to plan the implementation method, to find out the cost, and the implementation time.Water discharge, pier dimensions, the span and depth of the river, the condition of piers, and velocity of the flow were needed to find out the scouring by Hydraulic Engineering Circular No. 18 application. The result was employed to determine the type of the protection. To find out the estimated costs were calculated through SNI-2012. Ms. Project were applied to find out the implementation time.Keywords: bridge, piers, scouring, partially grouted riprap
PERENCANAAN DRAINASE DAN SUMUR RESAPAN PERUMAHAN PALM HILL CILEGON, JAWA BARAT Miftakhul Yaqin, Mohammad Zenurianto, Suhartono
Prokons: Jurnal Teknik Sipil Vol. 9 No. 2 August 2015
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v9i2.90

Abstract

Palm Hill housing must be completed with a proper drainage system and infiltration well to prevent it from surface run off water. The objective of the study is to design the drainage system and the infiltration well completed with its implementation time and budget.Topograpical map was needed to find out the elevation. Rainfall data from 3 nearby stations of Ciruas, Petir, and Serang were calculated through Log Pearson III method to find out the proposed rain fall at 10-year time reture. Waste water discharge was estimated 80% out of 364 houses. Cumulative discharge was resulted from the addition of run off to infiltration well to waste water discharges. The result was processed using Manning formula to design the culvert dimension.The calculations result in 6 different culvert dimensions,1 types of culvert,358 infiltration well, 277 work days at IDR2,954,079,288Keywords: drainage system,  infiltration well
PERILAKU GEMPA AKIBAT PENGARUH PERGERAKAN TANAH DAN PERGERAKAN PATAHAN PADA JEMBATAN RANGKA PELENGKUNG Evi Nur Cahya
Prokons: Jurnal Teknik Sipil Vol. 10 No. 1 February 2016
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v10i1.106

Abstract

Studi ini membahas tentang analisis respon dinamik perilaku gempa pada jembatan rangka pelengkung sebagai akibat dari pengaruh pergerakan tanah dan patahan. Data gempa didapat dari integral waktu gelombang respon percepatan gempa Jiji Taiwan pada tahun 1999 yang kemudian diaplikasikan kepada struktur jembatan rangka pelengkung untuk diteliti perilaku responsnya.Analisis respons dinamik dibuat menggunakan gerakan tanah pada saat gempa pada arah transversal dan longitudinal, bersamaan dengan pergerakan patahan pada arah vertical dan transversal, untuk meneliti perilaku gempa dari model jembatan baja pelengkung yang digunakan. Model analitis dengan sejarah waktu (time history) disimulasikan menggunakan model 3D dengan program ABAQUS.Berdasarkan hasil analisis, perilaku respons dari kedua kasus pada arah transversal dan longitudinal akibat akselerasi menunjukkan bentuk respons yang sedikit berbeda. Selain, itu juga ditemukan bahwa elemen struktur yang mengalami plastis berkumpul pertemuan antara rangka utama jembatan pelengkung dan girder pengakunya.Kata kunci: perilaku gempa, pergerakan tanah, pergerakan patahan (inland fault displacement), jembatan pelengkung rangka batang.
PENGARUH PENGENDALIAN JADWAL MATERIAL TERHADAP KINERJA PRAKTEK BENGKEL DAN LABORATORIUM JURUSAN TEKNIK SIPIL INSTANSI X DI MALANG Sitti Safiatus Riskijah
Prokons: Jurnal Teknik Sipil Vol. 11 No. 1 February 2017
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v11i1.123

Abstract

In fiscal year 2014 the practice material needs about 36% of the DIPACivil Engineering Department budgetfundsfor the fiscal year2014.Thus, needs proper management, so that the procurementof materialsdone as needed and can be used effectivelyandefficiently. This study aimstodetermine the level ofcontrolthe materialthat has been applied, andthe schedule of material management influence towards the performancepracticein terms ofschedule materialpractice aspects.The research data in the form of primary data obtained by distributing questionnaires to direct executors as the material handler and the responsible party of practice activity at the Civil Engineering Department of X at Malang. Number of samples around 8 with 6 executive responsible party. Data were analyzed descriptively and then analyzed with regression method using SPSS 20.The results shows: 1) Executors implement control of schedule practice material to the workshop and laboratory reasonably well; and 2) Control of material arrivals schedule shows significant effect of the time of practice execution or completion. With the contribution of the effect of 72.2%.  Keywords: control, schedule, materials, practice, performance
PENGARUH PEDAGANG KAKI LIMA TERHADAP PENANGGULANGAN BAHAYA KEBAKARAN PADA JL. HAYAM WURUK KOTA SEMARANG Eko Wahyudi, Zainal Abidin
Prokons: Jurnal Teknik Sipil Vol. 11 No. 2 August 2017
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v11i2.134

Abstract

Penanggulangan bahaya kebakaran merupakan upaya bagaimana cara didalam evakuasi pada saat terjadinya kebakaran dengan cepat tepat selamat di dalam suatu lingkungan atau kawasan. Jalur Pendistrian di Jalan Hayam Wuruk Semarang contoh lingkungan yang nyata, dimana hingga saat ini selalu ramai dikunjungi terutama mahasiswa, mengingat di Jalan Hayam Wuruk ini dapat memenuhi kebutuhkan masyarakat pada umumnya dan mahasiswa pada khususnya. Dimana di jalan ini terdapat jasa foto copy, percetakan, PKL, sehingga dapat memenuhi kebutuhan Mahasiswa khususnya. Hal ini berakibat pada munculnya masalah baru berupa kurang tertatanya jalur perdirtrian di jalan ini dan kemacetan penggunan jalan Hayam Wuruk, sehigga dapat berdampak kurang maksimalnya proses evakuasi jika terjadi kebakaran pada kawasan  sekitar jalan Hayam Wuruk.Tujuan dari penelitian ini adalah bagaimana cara mengatasi kemacetan tersebut yang diakibatkan oleh PKL yang dapat berpengaruh pada saat penanggulangan bahaya kebakaran. Meskipun dengan adanya aktivitas PKL dapat menghidupkan suasanan di sepanjang jalan Hayam Wuruk Semarang. Kata kunci: Jalur Pendistrian, PKL dan Kebakaran 
Analisis Kepuasan Konsumen terhadap Fasilitas Perumahan di Malang Sitti Safiatus Riskijah
Prokons: Jurnal Teknik Sipil Vol. 6 No. 1 February 2012
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v6i1.12

Abstract

Pengaruh Implementasi Rencana Tata Ruang Wilayah Terhadap Konservasi Sumber Daya Air Pada Wilayah Studi Kota Batu Jawa Timur Puspa Permanasari, M.Bisri, Agus Suharyanto
Prokons: Jurnal Teknik Sipil Vol. 7 No. 1 February 2013
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v7i1.32

Abstract

Penelitian ini bertujuan untuk mengevaluasi penggunaan lahan kondisi eksisting tahun 2010 dengan rencana dalam implementasinya pada Rencana Tata Ruang Wilayah Kota Batu tahun 2003 – 2013 dan menentukan pengaruh penggunaan lahan terhadap konservasi sumber daya air di kota Batu. Metode yang digunakan dalam penelitian ini adalah analisis regresi dan Analisis Proses Heirarki (AHP). Penelitian ini menunjukkan terdapat pengaruh dominan pada penggunaan lahan terhadap konservasi sumber daya air dan mempunyai hasil analis berbeda tiap kecamatan, penurunan nilai infiltrasi terjadi di kecamatan Junrejo sebesar 3 % dan kecamatan Batu sebesar 6%, hal berbeda terjadi di kecamatan Bumiaji, dengan peningkatan nilai infiltrasi sebesar 9%. Secara keseluruhan, besaran daya resap air hujan Kota Batu mengalami peningkatan sebesar 34.587.662 m³/tahun atau 15,9%, disebabkan peningkatan besaran curah hujan dan berhasilnya  program penghijauan. Peningkatan infiltrasi di Kota Batu merupakan pengaruh dari peningkatan daya resap air hujan di kecamatan Bumiaji yang meningkat sebesar 46.065.437 m³/tahun atau 31,7%, dengan kontribusi sebesar 76% terhadap total infiltrasi di Kota Batu. Kata-kata kunci:  konservasi, penggunaan lahan, infiltrasi
MODEL PENILAIAN HARGA JUAL RUMAH KELAS MENENGAH (TIPE 36-45) DENGAN ANALISIS REGRESI (STUDI KASUS DI WILAYAH KABUPATEN SIDOARJO) Lila Ayu Ratna Winanda
Prokons: Jurnal Teknik Sipil Vol. 7 No. 2 August 2013
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v7i2.48

Abstract

Pertumbuhan ekonomi dan properti yang tinggi di kabupaten Sidoarjo menyebabkan peningkatnya daya beli akan properti. Daya beli yang tinggi tentunya membutuhkan pertimbangan pemilihan properti, penilaian properti dengan menggunakan analisis regresi dapat digunakan sebagai pertimbangan pengambilan keputusan pembelian properti yang lebih baik atau untuk keperluan investasi, asuransi, dan perbankan.Penilaian properti dengan analisis regresi diterapkan pada real estate dengan  kriteria yang sama yakni rumah menengah khususnya dengan tipe 36–45 di Wilayah Kabupaten Sidoarjo, untuk mendapatkan model regresi dengan penyesuaian berupa luas tanah dan bangunan, letak bangunan terhadap pusat kota dan terhadap pusat semburan lumpur lapindo, lokasi bangunan, kondusif (sistem keamanan), air bersih, desain dan drainase.Hasil analisis regresi data dari developer untuk rumah tipe 36–45 di wilayah Kabupaten Sidoarjo didapat model regresi Y  =  0,338 + 0,206 X1 - 0,237 X2 + 0,192 X4 + 0,369 X5  + 0,487 X8, dengan koefisien determinasi model regresi  (R2) sebesar 96,1 %  ini berarti bahwa harga bangunan sebagian besar telah dijelaskan oleh variabel – variabel independent.  Selanjutnya model tersebut diterapkan pada salah satu sampel rumah dan didapatkan nilai sebesar Rp 218.900.000, sedangkan dengan perbandingan penyesuaian model regresi didapatkan nilai sebesar Rp 218.179.500,00.  Kedua nilai tersebut masih dalam kisaran harga penawaran untuk rumah tipe 36-45 yaitu Rp 90.000.000–Rp 355.000.000.  Kata-kata kunci:  penilaian properti, analisis regresi, harga rumah.
ANALISA RISIKO PADA PEMBANGUNAN GEDUNG PERUMAHAN TERHADAP PENCAPAIAN SASARAN (Studi Kasus pada Developer di Malang) Moch. Khamim, Sugeng Riyanto
Prokons: Jurnal Teknik Sipil Vol. 8 No. 2 August 2014
Publisher : Jurusan Teknik Sipil, Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/prokons.v8i2.66

Abstract

Penelitian ini bertujuan untuk mengidentifikasi potensi risiko dalam proyek konstruksi bangunan gedung dan dampaknya terhadap efektifitas pencapaian sasaran proyek. Parameter yang ditetapkan untuk memastikan potensi faktor risiko yaitu terdiri dari tingkat signifikansi risiko. Efektifitas pencapaian sasaran proyek diukur dari ketetapatan biaya, waktu dan mutu. Analisis Lintas (Path Analysis) menunjukkan bahwa faktor risiko menunjukkan faktor risiko eksternal, internal, internal teknis, dan hukum secara simultan memiliki pengaruh signifikan positif terhadap efektifitas pencapaian sasaran proyek. Faktor risiko eksternal dapat diprediksi secara parsial memiliki pengaruh signifikan terbesarKata-kata kunci: risiko, efektivitas, proyek konstruksi, sasaran proyek

Page 7 of 21 | Total Record : 202