cover
Contact Name
Mira Lestira Hariani
Contact Email
mira.hariani0103@gmail.com
Phone
(0231) 246664
Journal Mail Official
greenscience.ft@unswagati.ac.id
Editorial Address
Fakultas Teknik, Universitas Swadaya Gunung Djati Cirebon Jl. Pemuda No. 32 Kota Cirebon, Jawa Barat
Location
Kota cirebon,
Jawa barat
INDONESIA
Journal of Green Science and Technology
ISSN : 25981277     EISSN : 26213966     DOI : http://dx.doi.org/10.33603/jgst
Core Subject : Engineering,
Journal of Green Science and Technology (JGST) published since 2018 by Faculty of Engineering Universitas Swadaya Gunung Djati (UGJ) Cirebon with p-ISSN 2598-1277 and e-ISSN 2621-3966. JGST is a peer reviewed journal published triannualy in January, April, and September.
Articles 121 Documents
PLANNING AND ANALYSIS YOGYA TEGAL TOSERBA STRUCTURE Gino Harto Wibowo; Tira Roesdiana
Journal of Green Science and Technology Vol 3, No 1 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i1.2148

Abstract

The strategic geographical location of Tegal City supports the development of business and services. YOGYA Group is a Supermaket and Department Store company. In building construction there is a structural analysis that is used as a method or system to achieve development as planned.The method used in this research is qualitative method. Literature method by collecting data, studying and identifying.Observation method by conducting a survey to the research location. Adhering to the guidelines of SNI 2847: 2013 (Requirements for structural concrete for buildings), SNI 1727: 2013 (Minimum load for building design and other structures), Guidelines for house planning and building loading (PPURG 1987) and SNI 1726: 2012 (earthquake resistance planning procedures for buildings and non-building structures).This analysis obtained a result of dimension data and the number of beam reinforcement, column, plate and the number of pile needs for the YogyaTegal department store building.Keyword : Analysis, Building, Concrete, SNI, Strategic
ANALYSIS OF PLANNING CONSTRUCTION MAIN ROAD DEVELOPMENT PLTU TANJUNG JATI A Tubagus CiptaPerdana Harta; Martinus Agus Sugianto
Journal of Green Science and Technology Vol 2, No 2 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i2.1287

Abstract

Construction of Main Road at TanjungJati steam power plant which is currently being implemented does not yet have pavement structure, moving the writer to make the research object by analyzing the rigid pavement thickness planning by paying attention to vehicle load repetition factor because the average daily traffic (LHR) the road is not much. In addition to the analysis of pavement thickness planning in this study will also analyze the construction management for road construction in PLTU TanjungJati be efficient, effective and have good quality.The method used in this research is qualitative method by emphasizing secondary data, Vehicle Load Repetition Analysis, Rigid Pavement Thickness Analysis, Volume Calculation Analysis, Cost Analysis, Bar Chart Method, S Curve and Critical Path Method.Keywords: Highway, Rigid Pavement, Concrete Pavement, Project Management, Bar Chart Method, S Curve and CPM.
MANAGEMENT OF PUBLIC TRANSPORTATION PERFORMANCE MODEL BASED ON SAFETY TRANSPORTATION, PERIODIC TRANSPORTATION TEST, BEHAVIOR, AND SATISFACTION IN CIREBON CITY. Herry Hermawan
Journal of Green Science and Technology Vol 4, No 2 (2020): Journal of Green Science and Technology, Vol.4 No.2 (2020)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v4i2.3446

Abstract

The development of cities in Indonesia is marked by the high number of commuters (commuters) who travel between the main city and the surrounding city or district (hinterland) or between regions within a city due to an increase in population, population activities, types of services, and the relative functioning of the economy national and regional level of a country..       Transportation problems and challenges are multi-dimensional between transportation systems and urban systems, both operational, management and policy aspects. Urban transport policies that care about sustainable development in developing countries are very complex, but can be studied especially in the public transportation system because it is more possible when compared to private transport at this time.       In Indonesia, the number of motorized vehicles is increasing every year. The addition of that number in 2012 reached 10,036 million units, resulting in the population recorded in the Indonesian National Police increased 12% to 94.292 million units compared to only 84.19 million in 2011 (Kurniawan, 2013). Based on data from the National Police also stated that in 2012 there were 109,038 accident cases with 27,441 people died. Different data from the Coordinating Ministry for Economic Affairs and People's Welfare of the Republic of Indonesia states that motorcycle rider accidents have reached 120,226 times or 72% of all traffic accidents in a year. Most accident cases occur in people with lower middle economic level as motorcycle and public transportation users (State Intelligence Agency, 2013).       As released by WHO (World Health Organization), of all accidents that occur on the highway, the human error factor (human error) has the highest contribution, reaching between 80-90 percent compared to the factor of vehicle vehicle improperities ranging from 5-10 percent, as well as due to damage to road infrastructure by 10-20 percent (DG Hubdat, 2010). Vehicle facilities that often occur are less than 1 millimeter of tire grooves resulting in vehicle skid or tire breaks, brakes failing, metal fatigue resulting in broken vehicle parts, worn equipment not replaced, and various other causes. This is very much related to the technology used and the care done to the vehicle. One of the government's efforts to improve road safety is through safety vehicle action programs such as compliance with vehicle operations, organizing periodic and type test repair procedures, handling overloading, vehicle scrapping, and developing motor vehicle design that aims to improve vehicle safety technology (DG Hubdat, 2013).Keywords:Transportation Performance, User Satisfaction.
ANALYSIS OF IMPROVEMENT ROAD PALIMANAN – KRAMAT SECTION CIREBON REGENCY Mustakim Mustakim; Martinus Agus S
Journal of Green Science and Technology Vol 1, No 1 (2017): Journal of Green Science and Technology
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v1i1.1036

Abstract

Cirebon Regency has a good potential of both in trading and service. So, the roads should contribute to support the driving to comfort for road users. Palimanan – Kramat road is one of the access roads to RegencyCirebon. Along the way Palimanan - Kramat majority to be a place of business. Along Palimanan– Kramat road is a lot of structural damage such as potholes, cracked lengthwise and there is also almost the entire surface of the asphalt peeling. All this happened was possible because the line was often traversed by vehicles such as dump trucks which overload. The purpose of this study is to solve the damage to the road by means of the overlay. The method which is used in this study is a survey method in the location of the Overlay Palimanan – Kramat Road. Analysis of the data which is used are the Summary of Traffic Volume, Volume Peak Hour Traffic, Highway Capacity Analysis, Traffic Growth, Calculation of Pavement Thickness. The results of the study explained that the capacity of the vehicle on roads this time is at 1450 pcu/h, the degree of saturation of 0.3 into the current level of service B that is stable, high capacity most vehicles via this road for 378 pcu/hour. From these results, the road quite smoothly enough so that it can be concluded that the vehicles passing dominated by heavy vehicles with a load of overload which caused damage to the road and the re-layer thickness of 11 cm. Therefore, to note the level of vehicle load so as not to overload the structure of the pavement. Keywords: Road Pavement, Capacity of Road, Road Pavement Structure, Capacity of Vehicles 
ANALYSIS PLANNING AND DESIGN STRUCTURE OF BUILDING FLATS RENT FOR FACTORY WORKERS IN INDUSTRIAL AREA CIREBON REGENCY Taufik Nurrohman; Fathur Rohman
Journal of Green Science and Technology Vol 3, No 3 (2019)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i3.2757

Abstract

ABSTRACTThe industrial area in Cirebon Regency which has absorbed a number of industrial workers need to be supported by the infrastructure that facilitates the existence of industrial workers from inside and outside of Cirebon Regency, namely is residence that becomes one of the primary needs / basic human and they should find a place to live that suits the needs and financial capabilities. According to the Constitution 1945, Law No. 4 1992 Housing and Settlement and the Law No. 39 of 1999 on Human Rights, the house is the people's basic rights and guaranteed by law and supported by the Presidential Decree 22/2006 issued a national program "Flats 1000 Tower" which was targeted to build flats are middle to lower class.In order to create a structure that is safe and meets serviceability limit, so in the process of design the building structure must be according to SNI 2847-2013 of reinforced concrete. Beside planning, the loading structure must be according to SNI 1727-2013, then for calculation of earthquake engineering refers to SNI 1726-2012. Analysis structure using ETABS, for the material of structures is used concrete including frame section (column, sloof, beam, and slab).From the planning and design of the flats that were done in this thesis obtained 2 types of columns with a size 50/50 using reinforcement 12-D19 and shear reinforcement Ø10-100 and 35/35 using reinforcement 8-D19 and shear reinforcement Ø10-100, then obtained 2 types of main beams with a size 35/50 using reinforcement 12-D16 with shear reinforcement Ø10-100 and size 25/30 using reinforcement 5-D16 with shear reinforcement Ø10-120, then for floor and roof slab obtained a thickness 13cm using reinforcement D12-150. RAB structure obtained in this plan is Rp.15,920,000,000,- so that the price per meter is Rp.3,686,000,-.Keywords : Analysis and Planning structure, ETABS, Thesis Result.
Management Analysis Of The Project Of Muhammadiyah Bandung University Ayu Putri Aninda; Fathur Rohman
Journal of Green Science and Technology Vol 3, No 2 (2019): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v3i2.2381

Abstract

            Project management is all planning, implementation, controlling and coordination a project from early the (idea) the end project to en sure of the project appropriately time, money and quality. Selection method scheduling project is also one the very policy note in order to obtain result in according with the original plans.This thesis specifically discuss how project management planning the construction of Muhammadiyah Bandung University. The research was conducted by means of a survey into the field and study of literature.This thesis analysis includes volume calculation, Needs of labor, materials and equipment, Bar chart, Cash flow, S Curve, method of CPM (Critical Path Method) is a method of identifying critical work paths or items. Forwards calculation, backwards calculation, free float and total float.           Keyword: Project Management, Bar Chart, S Curve, Critical Path Method.
ANALYSIS STRUCTURE OF BUILDING LOCAL GOVERNMENT 2 KARAWANG WITH CONCRETE STRUCTURE Rio Supriyatna; Arief Firmanto
Journal of Green Science and Technology Vol 2, No 3 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i3.2143

Abstract

Desire to have a local government of Karawang office is quite  magnificent service complete with adequate facilities that can support a variety of work activities of Government Officials and employees, it is the hope of the ideal and coveted by all circles. However, of course, in realizing a high desire that must be supported by substantial costs sourced from local revenue sources that in fact the people's money too, would be comparable and parallel with the level of service to thecommunity.However, fears as above hopefully not happen because the purpose 5th floor of building local government 2 Karawang certainly has a good purpose for increased imagery and public services for the people in the city's mayor. Thus will be realized an order of life is getting better with the presence of a complete service of policy makers in the Karawang City, which in turn will encourage improvements in the economy of the community.The building local government 2 using concrete structure. On the basis of the criteria safety and excellent service then loading the planning process should be in accordance with SNI-1727-2013 as well as the structural design of the building should refer to SNI-2847-2013 specification for structural steel buildings, other than that in the calculation of earthquake engineering should also refer to the SNI-1726-2012.Keyword : Analysis structure, Etabs, frame section, deflection.
ANALYSIS OF INFILTRATION RELATIONS WITH LAND PHYSICAL PROPERTIES Awliya Tribhuwana; Agung Prasetyo
Journal of Green Science and Technology Vol 4, No 3 (2020): JOURNAL OF GREENSCIENCE AND TECHNOLOGY, VOL.4 NO.3 (2020)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v4i3.3996

Abstract

ABSTRACTSoil types have different infiltration rates and vary depending on the characteristics of the soil, how the infiltration relationship occurs with dry water content and saturated water content, infiltration relationship with the soil after being compacted and before compacted and how the infiltration rate of the two types of relationship and how infiltration water that happened. Soil tests are carried out in the laboratory, soil water content before and after the soil has been solidified, changes in the time of infiltration capacity with the Horton equation, rain hydrograph for overall infiltration analysis, including cumulative infiltration and runoff rates.Soils experience porosity filling not as great as in normal soil conditions, normal soil conditions changes in water content reaches 5.22 mm/hour while in soil conditions that experience changes in water content compaction at 30 minutes by 0.14 mm/hour and experiences a constant rate in the 40th minute at a rate of 0.20 mm/hour, so there is a difference in water content of 5.08 mm/hour between normal soil and soil after solidification, due to compacting it causes runoff of 8.92 mm/hour, normal soil with runoff of 3.78 mm/hour.Keyword :  Infiltration, soil physical properties, runoff.
Comparison of Pile Bearing Capacity Based on Standard Penetration Test (SPT), Hydraulic Static Pile Driven (HSPD), and Pile Driving Analyzer (PDA) Test in The Project of Flyover Antapani – Bandung Retno Wulansari; Saihul Saihul Anwar
Journal of Green Science and Technology Vol 2, No 1 (2018): JOURNAL OF GREEN SCIENCE AND TECHNOLOGY
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v2i1.1172

Abstract

ABSTRACTThe pile foundation is one of a kind of deep foundation that serves to funnel structural loads to hard soil layers that have a high carrying. The purpose of this study was to calculate the bearing capacity of piles.Based on SPT data obtained and calculated by Mayerhoff method at point BH-01 Qult = 259,992 tons, at point BH-02 Qult = 258,234 tons, and at point BH-03 Qult = 279.586 tons, with HSPD data obtained based on reading dial pressure manometer tool is approximately from 178,365 tons - 186,120 tons, whereas with PDA obtained based on RMX value on PDA test is about 124 tons - 225 tons.The results of the calculation of bearing capacity there are differences in values, both from the use of calculation methods and the location of points reviewed. From the results of the calculation can be concluded that the big highets bearing capacity the pile is values of SPT. In values of HSPD and PDA is relative same because the method using similar method (hydraulic and wave method).
ANALYSIS OF PUBLIC TRANSPORT DEVELOPMENT IN METROPOLITAN CITY BASED ON ORIGIN-DESTINATION (CASE STUDY: METRO CAPSUL BANDUNG) Ade Triyadani; Idwan Santoso; Sony Sulaksono Wibowo
Journal of Green Science and Technology Vol 4, No 1 (2020): Journal of Green Science and Technology, Vol.4 No.1 (2020)
Publisher : FAKULTAS TEKNNIK UNIVERSITAS SWADAYA GUNUNG JATI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v4i1.3017

Abstract

Development of new mode of metro kapsul as mass transportation mode in Bandung with corridor plan from Station Hall to Tegallega and return to Station Hall with plan of 19 stop station which can give contribution to congestion problem and lack of public transportation service in Bandung city. This study aims to analyze the potential of demand with the data of origin - destination of the respondent in the corridor plan of the metro capsule in order to give a description of the movement in the origin-destination matrix, in analysis for potential demand used the modal movement assumption of private vehicles, public transport and pedestrian, The location of priority shelter at the beginning of development by using multicriteria analysis while for operational analysis is calculated some variables of capsule metro operating system (headways, frequencies, etc). The result of origin-destination matrix analysis is getting potential demand of metro capsule during weekdays on-peak of 3529 pass/hour, off-peak of 2116 pass/hour. The result of location priority stop location will get 6 (six) stop location recommended in “Stasiun Bandung, Pasar Baru, Pasar Anyar, Taman Tegallega, ITC Kebon Kelapa and Alun-Alun Bandung”. From the operational results of metro capsule, obtained frequence of 20 Unit/jam, headways 3 minutes, the number of vehicles required 8 vehicles, on weekdays and weekends when on-peak and off-peak.

Page 11 of 13 | Total Record : 121