cover
Contact Name
Widodo Kushartomo
Contact Email
widodokushartomo@gmail.com
Phone
+628176869150
Journal Mail Official
jmts@untar.ac.id
Editorial Address
Jl. Letjen S. Parman No. 1, Jakarta 11440
Location
Kota adm. jakarta barat,
Dki jakarta
INDONESIA
JMTS: Jurnal Mitra Teknik Sipil
ISSN : -     EISSN : 2622545X     DOI : http://dx.doi.org/10.24912/jmts
Core Subject : Engineering,
JMTS: Jurnal Mitra Teknik Sipil dikelola oleh Program Studi Sarjana Teknik Sipil, Fakultas Teknik, Universitas Tarumanagara. JMTS: Jurnal Mitra Teknik Sipil merupakan media publikasi hasil penelitian dan studi ilmiah dalam bidang Teknik Sipil yang diterbitkan 4 kali dalam setahun, yaitu pada bulan Februari, Mei, Agustus, dan November. Jurnal ini terbit pertama kali pada 1 Agustus 2018.
Articles 24 Documents
Search results for , issue "Volume 5, Nomor 1, Februari 2022" : 24 Documents clear
PENJADWALAN PROYEK GEDUNG SEKOLAH DI SURABAYA MENGGUNAKAN OPTIMASI TIME-COST TRADE-OFF DENGAN DISCOUNTED CASH FLOW Albert Mahendra Tanurahardja; Onnyxiforus Gondokusumo
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.16842

Abstract

In construction projects, time and cost factors are the keys to the success of a project. Project scheduling plays an important role in it. The Time-Cost Trade-Off method is a project scheduling technique using the Critical-Path Method which aims to find the optimum project duration, which is the duration with the minimum total cost. To get the minimum total cost, the addition of Direct & Indirect Cost should be made as small as possible. The usual Time-Cost Trade-Off does not take into account the time value of money. The time value of money has an effect on cash flow in a project. Therefore, a Time-Cost Trade-Off analysis is needed that takes into account the time value of money (Discounted Cash Flow). Future costs must be equalized to the same point in time or we can say the present time (when the project start time). The main purpose of this study is to determine the effect of time value of money on the minimum cost and optimal duration of a project. In the object of this research, the scheduling that is made after calculating the discounted cash flow will result in a smaller minimum total cost with an optimum duration.Pada proyek konstruksi, faktor waktu dan biaya merupakan kunci keberhasilan suatu proyek. Penjadwalan proyek ikut berperan penting di dalamnya. Metode Time-Cost Trade-Off adalah teknik penjadwalan proyek dengan menggunakan Critical-Path Method bertujuan untuk mencari durasi proyek yang optimum, yaitu durasi dengan biaya total yang minimum. Untuk mendapatkan biaya total yang minimum, maka penambahan Direct & Indirect Cost harus dibuat sekecil mungkin. Time-Cost Trade-Off yang biasa dilakukan tidak memperhitungkan nilai waktu terhadap uang (time value of money). Nilai time value of money berpengaruh pada arus kas pada suatu proyek. Oleh karena itu, diperlukan suatu analisis Time-Cost Trade-Off yang memperhitungkan nilai waktu terhadap uang (Discounted Cash Flow). Biaya di waktu mendatang harus disetarakan ke titik waktu yang sama atau bisa dikatakan waktu sekarang (saat waktu mulai proyek). Tujuan utama penelitian ini adalah untuk mengetahui pengaruh time value of money terhadap biaya minimum dan durasi optimal sebuah proyek. Pada objek penelitian ini, penjadwalan yang dibuat sesudah memperhitungkan discounted cash flow akan menghasilkan biaya total minimum yang lebih kecil dengan durasi yang optimum.  
CONCRETE DAMAGE ASSESSMENT THROUGH IMAGE PROCESSING WITH CANNY EDGE DETECTION METHOD Endru Suphato Sendiko; Henny Wiyanto
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.7065

Abstract

Concrete damage assessment for further action is very important for the safety of building strength before something unexpected happens. Therefore, an early assessment of a building that might seem alarming is very important. There are many methods that can be used to assess concrete damage, starting from the visual, use of tools, destructive and non-destructive test. As the rapid development of infrastructure, there is also an increase need to assess the damaged concrete. Not only new buildings, old buildings also need to be assessed to ensure the safety of these buildings, especially buildings affected by earthquakes, natural disasters, dirty environments and or others. The high need for assessors in these locations become a problem if the building is huge and will take time if done with a small workforce, technological assistance is the solution. Buildings affected by natural disasters causes various kinds of damage, starting from cracks, mold and stains on concrete blankets. This damage can interfere with the strength and safety of the building, so assessing damage to concrete is very important. Not all buildings that are damaged are safe to go to, let alone stepped on, so we need the help of technology, for example cameras or drones.
ANALISIS FAKTOR-FAKTOR PENYEBAB COST OVERRUN PADA PROYEK RUMAH INDONESIA SEHAT Felix Putra; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.16649

Abstract

ABSTRACTThe development of construction work is followed by the increasingly complex constructions project, causing more problems to arise as well as discrepancies between planning and implementation in the field. One of the problems that arises is the occurrence of cost overruns which can cause losses on the owner and construction service providers. The research was conducted on the Rumah Indonesia Sehat (RIS) project, which is 3 strories building projects with a large cost overrun case. This study aims to identify jobs that experience cost overrun and analyze the factors that influence the occurrence of cost overruns. The research data used are project real estimate of cost and questionnaire. Pareto diagrams is used to analyze the secondary data, while primary data will be processed with IBM SPSS Statistics software and then re-analyzed using the Relative Importance Index (RII) method. Based on the results, it was found that the work with the largest percentage of cost overrun in the RIS project was slab and beam work. Meanwhile, the most dominant factors causing cost overruns are poor productivity and quality of human resources, poor coordination between functions in the WBS, and lack of understanding by workers of the drawings and instructions given. ABSTRAKSemakin berkembangnya pekerjaan konstruksi diikuti dengan semakin kompleksnya suatu pembangunan menyebabkan semakin banyaknya pula masalah yang timbul serta ketidaksesuaian antara perencanaan dan pelaksanaanya di lapangan. Salah satu masalah yang sering muncul adalah terjadinya cost overrun atau pembengkakan harga yang dapat menyebabkan kerugian pada pihak owner maupun penyedia jasa konstruksi. Penelitian dilakukan terhadap proyek Rumah Indonesia Sehat (RIS) yang merupakan gedung rumah sakit 3 lantai dengan kasus cost overrun yang besar. Penelitian ini bertujuan untuk mengidentifikasi pekerjaan yang mengalami cost overrun serta menganalisis faktor-faktor yang mempengaruhi terjadinya cost overrun. Data penelitian yang digunakan adalah data sekunder berupa RAB & RAP proyek dan data primer berupa kuesioner dengan skala Litcher. Metode analisis untuk data sekunder adalah menggunakan Diagram Pareto sedangkan data primer akan diolah dengan software IBM SPSS Statistics 28 kemudian dianalisis kembali dengan metode Relative Importance Index (RII). Berdasarkan hasil analisis didapatkan bahwa pekerjaan yang mengalami presentase cost overrun terbesar pada proyek RIS adalah pekerjaan pelat dan balok. Sedangkan faktor dominan penyebab tejadinya cost overrun adalah produktivitas dan kualitas sumber daya manusia yang buruk, kurang baiknya koordinasi antar fungsi pada WBS yang berdampak pada terjadinya pekerjaan ulang, dan kurangnya pemahaman pekerja terhadap gambar dan instruksi yang diberikan. 
ANALISIS SISA MATERIAL PADA PROYEK PEMBANGUNAN PABRIK Henry Irawan; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 1, Februari 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i1.16573

Abstract

ABSTRACTPT. XYZ factory with an area of 4000 m2 located in the Ngoro Industrial Park area - Mojokerto, East Java is one of the largest tobacco producers in Indonesia. The construction of this factory certainly cannot be separated from what is called residual material or material that can no longer be used. The purpose of this study is to find out how much material remains in the PT. XYZ factory construction project. The researcher uses real data obtained directly from the construction manager of the complete factory construction project starting from RAB, RAP, project contracts, material expenditures, incoming materials, installed materials, and leftover materials. Not only using real data, but researchers also make observations to strengthen existing construction project data. Data processing in this study using the Pareto diagram method. Researchers use Pareto diagram data processing so that the largest remaining material can be seen clearly through a Pareto graph. There are 34 kinds of waste materials in the construction of this factory construction project.ABSTRAKPabrik PT. XYZ memiliki luas 4000 m2 yang berlokasi di kawasan Ngoro Industrial Park – Mojokerto, Jatim adalah pabrik yang bergerak di bidang produsen tembakau terbesar di Indonesia. Pembangunan pabrik ini pasti tidak terlepas dengan yang namanya material sisa atau material yang sudah tidak dapat terpakai lagi. Tujuan pada penelitian ini untuk menganalisis seberapa banyak sisa material yang ada pada proyek pembangunan pabrikPT. XYZ Peneliti menggunakan data riil yang didapat langsung dari manajer konstruksi proyek pembangunan pabrik secara lengkap mulai dari RAB, RAP,  kontrak proyek, pembelanjaan material, material yang datang, material yang terpasang dan material yang sisa. Tidak hanya menggunakan data riill, peneliti juga melakukan pengamatan untuk memperkuat data proyek konstruksi yang ada. Pengolahan data pada penelitian ini menggunakan metode diagram pareto. Peneliti menggunakan pengolahan data diagram pareto agar sisa material terbesar dapat terlihat dengan jelas melalui grafik pareto. Terdapat 34 macam sisa material dalam pembangunan proyek konstruksi pabrik ini.   

Page 3 of 3 | Total Record : 24