cover
Contact Name
agata iwan candra
Contact Email
iwan_candra@unik-kediri.ac.id
Phone
+62811308010
Journal Mail Official
iwan_candra@unik-kediri.ac.id
Editorial Address
Jl. Selomangleng 1 Gedung A no.110 - KEDIRI 64115 JAWA TIMUR - INDONESIA
Location
Kota kediri,
Jawa timur
INDONESIA
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS)
Published by Universitas Kadiri
ISSN : -     EISSN : 26217686     DOI : http://dx.doi.org/10.30737/jurmateks
Core Subject : Engineering,
JURMATEKS (Jurnal Mahasiswa Teknik Sipil) diterbitkan oleh Program Studi Teknik Sipil, Fakultas Teknik, Universitas KADIRI untuk menampung hasil penelitian, tugas akhir maupun tugas proyek mahasiswa teknik sipil di lingkungan Universitas KADIRI.
Articles 15 Documents
Search results for , issue "Vol. 4 No. 2 (2021): OCTOBER" : 15 Documents clear
Optimalisasi Biaya dan Waktu Proyek Kontruksi Pelebaran Jalan Menggunakan Earned Value Sentot Tri Wibowo; Suwarno Suwarno; Ahmad Ridwan; Haris Wicaksono; Fitry Rahmawaty
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.1828

Abstract

In a construction project, there are several aspects that cause the project not to go according to plan. Cost and time are aspects that need to be considered to avoid losses incurred in a project. Jombang-ploso-legundi-gresik road project is one of the road widening projects carried out by PT. Mix Pro Indonesia. The project was carried out with the aim that access to (Surabaya-Mojokerto) or further trans Java toll road is quicker safe and smoother. This research aims to optimize the cost and time on the project using the Earned Value method. Calculations include the calculation of ACWP (Actual Cost of Work Performance), BCWS (Budgeted Cost Work Schedule), and BCWP (Budgeted Cost for Work Performed) using the Earned Value method. From these parameters, estimate aspects of cost and time. As well as project analysis of acceleration on a critical trajectory of work. The results of calculations in the 12th week obtained a BCWS value of Rp 1,216,677,846,400 BCWP = Rp 3,040,372,140,080, ACWP = Rp 3,678,560,000. CV value = -Rp 109,203,495.92, SV = Rp 895,646,816.82, CPI = 0.827, and for SPI = 2,499. From these results it can be seen that the CPI value < 1 which means that there are project expenditures that exceed the original plan. With the results, it can be used as a reference in the implementation of project activities.
Mengurangi Durasi Pelaksanaan Proyek Dengan Menggunakan Metode Time Cost Trade Off Muhammad Rizal Hermawan; Ahmad Ridwan; Suwarno Suwarno
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.1829

Abstract

Construction project management is one of the things that affect the smooth work of construction projects. Time and cost become benchmarks in the success of a project. In the construction project Bhayangkara Nganjuk hospital indicated experiencing delays caused by unse endorsive weather conditions. The delay will have an impact on the costs that will be incurred. The purpose of this research is to accelerate the time on the project by using the time cost trade off method. Development work includes IGD room work, Pharmaceutical Installation, Laboratory and Inpatiation Room. The data used in the form of Time schedule and budget plan costs obtained from the implementing contractor. From the data, analysis is carried out in the form of determination of relationships between jobs, determination of critical pathways, and acceleration analysis by applying a work shift system. The relationship between jobs is illustrated through the Microsoft Project. The results of the study obtained a total cost after acceleration of Rp. 3,873,505,632.00 the value was more expensive 11.25% than the normal cost of the project of Rp 3,481,698,000.00. With an accelerated duration of 125 days or 25.71% faster than the normal duration of the project of 180 days. So that from these results, it can be used as a reference in the implementation of the project regarding work hours that can be applied as well as the cost of the project and the duration of acceleration required.
Meningkatkan Daya Dukung Pondasi Tiang Pancang Gedung Abipraya Mojo Kabupaten Kediri Menggunakan Metode Begemann Arif Fathur Rohman; Edy Gardjito; Agata Iwan Candra; Andri Dwi Cahyono
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.1986

Abstract

The foundation is a lower structural element that serves to with stand the load of the upper structure. Pile foundation is one type of deep foundation, which is widely used in the construction of buildings. Pile foundation used in hard soil cases is located at a very deep depth. Abipraya Building is a building located in kediri regency which later functioned as a rural office. This study aims to increase the carrying capacity of pile foundation in the abipraya building project using the begemann method. Calculations carried out include the calculation of loading, carrying capacity, buckling factor and determination of foundation point.  Based on the calculations obtained the results of axial load (sigma Vertical Ultimate) Σνυ of 99.70. with a single-pole carrying capacity of 38.89 tons and a group pole carrying capacity of 117,917 tons. These results will be planned the foundation of the stake with a diameter of 30 with a depth of 8 meters, amounting to 4 poles. Calculation factor buckling results in 194.14 kg/cm2 smaller than the allowed maximum 2400 kg/cm2. Thus, with the known components of the planning of the pile foundation, it can be used as a reference in the construction of the abipraya building.
Meningkatkan Daya Dukung Tiang Pondasi Minipile Persegi Pada Gedung Kantor Ngasem Kabupaten Kediri Menggunakan Metode Mayerhoff Erwin Dwi Laksana; Edy Gardjito; Suwarno Suwarno; Faiz Muhammad Azhari; Imam Mustofa
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.1999

Abstract

The foundation is one part under the building that has a very important role. The choice of the type of foundation is something that needs to be considered. One type of foundation that is widely used is the minipile foundation. Minipile foundation itself is a type of foundation that is used if the load received from the superstructure is not too heavy and the hard soil type is at a depth of between 5-10m. The purpose of this study was to plan the bearing capacity of the minipile foundation pile in the PT. BPJE in Ngasem, Kediri Regency. The building is planned to be used as an office building. The planned sub-building includes foundation planning with a mini-square building with a cross-sectional dimension of 20x20. The calculations carried out include the calculation of the bearing capacity of the foundation using the Mayerhoff method, the calculation of the flexural factor and the calculation of reinforcement. The calculation results (sigma Vertical Ultimate) Vu = 114.78 tons. With bending factor tk = 286.95 kg /. The reinforcement in the pile cap for the x direction of tensile reinforcement = D16–170 and compression reinforcement = D16–250 while for tensile reinforcement in the y direction = D16 - 170 and compressive reinforcement = D10 - 250. Thus, the results of the planning can be used as a reference for the implementation of building construction. office of PT. BPJE in Ngasem, Kediri Regency.
Menentukan Desain Struktur Atas Gedung Fajar Biru Trenggalek Berdasarkan SNI (Standart Nasional Indonesia) Alfin Dino Saputra; Edy Gardjito; Sigit Winarto; Muhammad Heri Nastotok; Faiz Muhammad Azhari
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.2002

Abstract

A multi-storey reinforced concrete building is very prone to collapse. Therefore, proper structural planning is needed in order to qualify the strength and security of the structure. Fajar Biru Building is a building that will be built in Karangsuko village of Trenggalek Regency, East Java. The building functioned as a cost with a building area of 340 m2, and has a total of 4 floors. The method used is the SRPMM (Medium Moment Musician Frame System) method which refers to SNI 1726:2012, and SNI 2847:2013. Planning includes the calculation of beams, floor plates, and columns. From the results of the calculations that have been done. on the floor plate structure with a plate thickness of 120 mm, Ø12 tree bones are used with a distance of 100 mm for pedestals and 150 mm for field areas. On the looping of B1 beams with dimensions of 300x350 mm used 6-D16 tree bones for focus and 4-D16 for field areas with Ø10-70 mm for focus and Ø10-140 mm for field areas. For the repeating of Column K1 with dimensions of 300x600 mm used 10-D16 principal bones with a Ø10-70 mm dimension. So that from these results can be used as a reference in the implementation of the construction of the blue dawn building.
Optimalisasi Penjadwalan Proyek Pembangunan Gedung Puskesmas Badas Menggunakan Critical Path Method-Project Evaluation and Review Technique (CPM-PERT) Dafid Cahya Setiawan; Ahmad Ridwan; Suwarno Suwarno
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.2011

Abstract

Lack of project scheduling planning and ineffective control make the activity of a project less efficient. This will have an impact on the success of the project. This situation will result in delays and a decrease in the quality of work due to time constraints. Scheduling is important for determining the required activities and arranging a sequence and time frame to complete project activities on time. This study aims to optimize the scheduling of a moderate light rehabilitation project in the Badas Community Health Center building, Kediri Regency, where project start-ups are experiencing delays. The method used is Critical Path Method-Project Evaluation and Review Technique (CPM-PERT), which is a method to determine the duration of a project that can be completed and the percentage of its success. The analysis carried out includes calculation the duration desired acceleration and cost slope. Analysis results using CPM-PERT obtained critical path in: preparation activities (A), earthworks (B), structural work (D), 1st floor work (E), 2nd floor work (F), 3rd floor work (G), roof, ceiling and plank work (H), iron work (I), electrical work (L), floor and wall covering work (M) and finishing work (N). The normal duration of project completion is 140 days and costs Rp. 1,818,182,709, whereas with the CPM-PERT method the duration can be accelerated to 128 days (probability 99.99%) and required additional fee 8.1% or worth Rp. 146,719,664. Implementers can use it in optimizing scheduling and financing on the badas public health center building construction project.
Kuat Tekan dan Penyerapan Batako Menggunakan Serat Pelepah Kelapa Darul Niham Wahono; Zaenuri Arifin; Yosef Cahyo Setianto Poernomo; Zendy Bima Mahardana; Ashabul Yamin
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.2016

Abstract

Brick is a building material that has a function as a room sealer. Its larger size, when compared to red brick, makes bricks more in demand in the market. Improving the quality of bricks needs to be done to meet the needs of the building. The use of added materials becomes one of the things that can be considered to improve the nature and quality of bricks. This research aims to find out the strong press and absorption of bricks with the use of coconut pellet fiber. The research was conducted experimentally with the manufacture of test objects in the laboratory. The test object used is in the form of a beam of 30x15x10 cm. The percentage variation of coconut fiber is 5%, 10%, and 15% of the weight mass in bricks. The tests carried out include a strong compressive and water absorption test with reference to the Indonesian National Standard (SNI). The results of water absorption tests obtained the optimum value in bricks with a mixture of 5% fiber which is 6% of the mass of the weight of the brick, while the minimum value is in the brick, 15% fiber, which is 10%. While the compressive strength results get the optimum value on the 5% fiber mix variation, which is 20.1 kg/cm², and the minimum value on the variation of 15% fiber is 8.8 kg/cm². From these results showed that bricks with coconut pellet fiber have not been able to improve the quality of bricks.
Efisiensi Harga Satuan Pekerjaan Konstruksi Gedung Dengan Metode BOW (Burgerlijke Openbare Werken), SNI (Standart Nasional Indonesia) Dan Lapangan Nova Irmayanti; Ahmad Ridwan; Yosef Cahyo Setianto Poernomo; Haris Wicaksono; Fitry Rahmawaty
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.2022

Abstract

Construction management is very necessary in project management. To increase the efficiency and effectiveness of construction development activities, a unit price calculation tool is needed, namely construction cost analysis. Contractors generally make bid prices based on analysis that is not entirely guided by BOW (Burgerlijke Openbare Werken) analysis or SNI (Standart National Indonesia) analysis. Contractors tend to calculate the unit price of work using their own analysis which is based on previous experience in completing a construction work. The purpose of this study was to analyze the unit price of work on the building using the SNI, BOW and Field methods. The work components analyzed in this study are the unit price of materials and wages for partner work and foundation work. In each calculation method used, the most economical cost budget plan is obtained, namely using the field method calculation with the unit price value for the work of a partner, it costs Rp. 509.9996.78 while for foundation work it costs Rp. 722,965.1. By using the field method, a unit price is more economical when compared to BOW and SNI methods. So that these results can be used as a reference in planning the budget for a construction project.
Mengurangi Resiko Banjir Pada Sungai Bruno Kediri dengan Konstruksi Bendung Marlinto Umbu Reku; Yosef Cahyo Setianto Poernomo; Sigit Winarto; Ashabul Yamin
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.2034

Abstract

Flooding is a problem that needs to be considered because it affects all sectors. The Bruno River in Kediri Regency often experiences flooding in the rainy season, although the overflow does not reach the settlements. But already, some levees in the Bruno river broke because they could not accommodate the discharge from the Bruno river. Such characteristics have the potential to be the cause of flooding. The core of the problem arranges various flood control efforts. The development of complementary infrastructure such as Water Resources becomes the right choice to overcome the flood event. This research aims to plan Water Resources to control the flood on the Bruno river, Kediri Regency. The analysis includes hydrological analysis and hydraulic analysis. The hydrological analysis includes rainfall calculations, match tests, and flood plans, while hydraulic analysis includes the calculation of bend dimensions. Rainfall data were obtained from kanyoran rain station for the past 10 years. From the rainfall data is done calculations and compared with estimates when re-from related agencies. So, the difference in discharge is known that is used as the basis of the analysis of Water Resources planning. The results of the study obtained flood discharge of 69,20762609 m3/s. ≈ 70 m3/s with a high bend planning bend 4.3m wide 30 m. The elevation of the water level downstream of the bend is +51.56 m so that the planning results can be used as a step to reduce flooding in the Bruno river.
Meningkatkan Daya Dukung Pondasi Tiang Pancang Gedung Baru Rumah Sakit Baptis Kediri Menggunakan Metode Mayerhoff Lintang Ratnasari Satiti; Yosef Cahyo Setianto Poernomo; Sigit Winarto; Andri Dwi Cahyono
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 4 No. 2 (2021): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v4i2.2048

Abstract

The foundation is an important part of the building structure because it functions as a support. The selection of this pile foundation has various considerations, namely the pile foundation can achieve the hardest soil bearing capacity, made with a manufacturing system, then the quality of the concrete can be guaranteed, the soil bearing capacity is not only obtained from the tip of the pile. Foundation planning needs to be well planned to support user safety and comfort. Pile foundation is one type of foundation chosen because it is more cost-effective and quality than other foundations. This study aims to plan the pile foundation for a new building at Baptist Hospital Kediri. The calculations carried out include calculating the load received by each column, the carrying capacity of a single pile permit, the dimensions and depth of the pile, as well as the required pile cap dimensions. Calculation of the pile foundation is carried out using the Mayerhoff method. The calculation results show that the load on the column area (K13) is 212.23.04 tons, the carrying capacity of the single pile permit (Qall) is 87509.33 kg and Quult is 218773.3 kg and the use of 4 piles on one pile with dimensions of 40 x 40 cm with a depth of 10.6 m, With these results can be used as a reference in the construction of a new building Baptist Hospital that is safe and able to withstand the load of the building.

Page 1 of 2 | Total Record : 15