cover
Contact Name
Vega Aditama
Contact Email
vegaaditama@gmail.com
Phone
+6282257017949
Journal Mail Official
vegaaditama@gmail.com
Editorial Address
jalan bendungan sigura-gura no. 2 , Kota Malang, Jawa Timur
Location
Kota malang,
Jawa timur
INDONESIA
Sondir
ISSN : 19792832     EISSN : 27468275     DOI : -
Core Subject : Engineering,
Sondir Journal is a publication media of research results in the field of Civil Engineering and sub-fields of structure, geotechnical engineering, transportation, construction management, water resources and geographic information systems (GIS). This journal is published regularly as much as 2 volumes per year in April and October.
Articles 82 Documents
EVALUASI PENERAPAN METODE DESIGN AND BUILD PADA PROYEK PEMBANGUNAN STADION KABUPATEN KEDIRI Wiwik Nurdianti
SONDIR Vol. 10 No. 1 (2025): JURNAL SONDIR
Publisher : Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36040/sondir.v10i1.14629

Abstract

The selection of the right procurement method is expected to achieve the success of a project, namely achieving the objectives of the project itself. Procurement or procurement of goods / services with the Design and Build method is new in Kediri Regency, this method has just been applied for the first time, namely in the Kediri Regency Stadium Development Project. This study aims to determine the obstacles experienced in the application of the Design and Build Method and determine improvements that can be made to improve the performance of the next Design and Build project implementation. The research method is descriptive quantitative. Data was collected from field data and questionnaires involving 27 respondents from the Owner, Contractor, Construction Management Consultant and Evaluation Team. The results of the questionnaire were then analyzed using mean calculations and Focus Group Discussions. The results of this study are obstacles in the implementation of the Design and Build Method on the Kediri Regency Stadium Development project, namely: from the aspect of regulation / regulation, aspects of client capability / ability, aspects of capability / ability of other stakeholders, aspects of adaptation. Improvements that can be made to the implementation of the Design and Build Method, namely: Each stakeholder must understand in detail the concept of the Design and Build Method in accordance with the rules. The details of the rules are more clarified so that the implementation of the design and build project does not cause different perceptions between stakeholders. Design and Build work requires careful planning and good collaboration from various parties.
KAJIAN HIDROLOGI PADA KAWASAN PERKANTORAN BERSAMA DI PEMERINTAHAN KOTA KEDIRI PROVINSI JAWA TIMUR: hidrologi gunawan, Sutris Gunawan
SONDIR Vol. 10 No. 1 (2025): JURNAL SONDIR
Publisher : Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36040/sondir.v10i1.14792

Abstract

Along with urban growth, the increasing population has resulted in the need for housing also continuing to increase. The negative impact of urban infrastructure development in the form of housing, trade and services is increasingly reducing open areas that function as water absorption areas. The research object area is included in the Parung River Basin. The basic flow of this river comes from water sources in Banaran Village and Sumber Bulus in Tosaren Village with a catchment area of ​​the Parung River, amounting to 29.3 km2. The change in land that will be used for an office area is 5.8 Ha. The use of regional space is in accordance with the city spatial plan (RTRW 2011-2030 and 2024-2044) where one of them is the realization of an environmental center. And Singonegaran Village is included in the service, trade and service development environment area