cover
Contact Name
Putri Nur Dayana
Contact Email
putrinurd93@gmail.com
Phone
+62811327813
Journal Mail Official
jurnal.jifam@gmail.com
Editorial Address
Editor Journal of Infrastructure & Facility Asset Management Civil Engineering Dept., Building 2nd Floor, Room J-201 Sukalilo ITS Campus Surabaya 60111
Location
Kota surabaya,
Jawa timur
INDONESIA
Journal of Infrastructure and Facility Asset Management
ISSN : 2656890X     EISSN : 26568896     DOI : http://dx.doi.org/10.12962/jifam.v2i1.6965
Journal of Infrastructre & Facility Asset Management is aimed to develop Infrastructure & Facility Asset Management Sciences and Knowledge. This journal accepts paper contains the results of research or knowledge development in Infrastructure & Facility Asset Management from anywhere. This journal is published regularly 2 times a year, every March and September. If needed, this journal can also be published in June and December as Supplement Issue. Supplements are not of mandatory publishing. Supplements are only issued if deemed necessary.
Articles 308 Documents
Excavation Slopes Stability Analysis with Cracked Soil in the Construction of the Serang – Panimbang Toll Road (STA 54+625) Under Maximum Rainfall Condition Wahyu Purnamayoga; Trihanyndio Rendy Satrya; Mahendra Andiek Maulana; Wahyu Supriyo Winurseto
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Construction of the Serang-Panimbang toll road requires deep excavation in several places finishing grade which then forms a roadside slope. Slope stability analysis is very critical in slope design so that infrastructure assets can be managed and maintained. The surrounding infrastructure may sustain damage if the slope is unstable. Rainfall is one of the most important triggers for landslide occurrence. In general, the effects of precipitation infiltration on slopes can cause changes in soil suction and positive pore water pressure, increase soil unit weight, and decrease soil shear strength. If cracked soil is found, the process of rain infiltration will be accelerated. It starts with small cracks and then turns into deep cracks, indicating the possibility of landslides, and the longer the landslide surface becomes, the more the slope will slide. This research discusses the effects of cracked soil and precipitation on slope stability. A slope stability analysis was performed using the Finite Element Method (FEM) and the cracked soil was modelled as a thin weak layer. The results showed that the safety factor decreased from 1,891 in the initial condition to 1,471 (before rain) and 1,441 (after rain) in the worst conditions.
Correlation of Initial Soil Density and Maximum Soil Density Under Drying-Wetting Cycles and Their Soil Erodibility Tia Evriana; Trihanyndio Rendy Satrya; Mahendra Andiek Maulana; Wahyu Supriyo Winurseto
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Serang - Panimbang Toll Road plan area of Banten province in regional stratigraphy from the starting station to the end consists of sedimentary rock sediments of the Bojongmanik Formation in the form of sandstone intersections with clayey limestone inserts that have been precipitated by the products of Karang volcano consisting of breccia and lava. This volcanic material exhibits a coarse soil texture, high water absorption capacity, and susceptibility to erosion. Soil erosion levels can be determined by measuring soil erodibility. Erosion often occurs in Indonesia because Indonesia has a tropical climate which has two seasons, the rainy and dry seasons. This climatic pattern contributes to the soil vulnerability to erosion, impacting its density. Therefore, it is important to know the effect of drying-wetting cycle on erodibility along the slope of Serang-Panimbang Toll Road. Soil samples will be modeled under two density variations: initial density and maximum density. Drying-wetting tests will determine the physical, mechanical, suction, and erodibility properties of soil. The results showed that there was an increase in the degree of saturation of 8.31% for the initial density soil and 17.12% for the maximum density soil. Unconfined compressive strength of the soil with initial density and maximum density also decreased in consistency which decreased from very stiff and stiff to very soft. However, erodibility values for both density conditions remained constant at 0.19 despite the drying-wetting cycles and is classified as low.
The Improvement of Existing Slope Reinforcement System and The Design of Alternative Slope Reinforcements Case Study: Lainea-Awunio Road Section Km 98+050 South Konawe Regency, Southeast Sulawesi Province Nadia Kamila; Mohamad Khoiri; Freddy Siagian
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The landslide that occurred on the Lainea-Awunio KM 98+050 national road in South Konawe Regency, Southeast Sulawesi caused a partial collapse on the road and disrupted traffic flow. For this reason, slope rehabilitation has been carried out using the construction of retaining walls. Based on the Geological Map and test results, it was found that the soil at the location has a high soil bearing capacity, but in reality, landslides occur during the rainy season and cracks are found on the slopes, therefore it is necessary to analyze slope stability using a cracked soil approach. In this research, slope stability analysis was analyzed using authentic soil data and with a cracked soil approach, slope stability analysis was analyzed using using the GEO5 auxiliary program and reinforcement planning was calculated using manual calculations. After the analysis, it was discovered that the slope that was initially predicted to be safe (SF>1) turned out to be a collapse (SF<1), and the reinforcement system that had been implemented in the field after being evaluated turned out to be not stable enough and required additional reinforcement. The additional reinforcement is designed using bored piles with a diameter of 1 meter to a depth of 13 meters to increase the safety factor from SF=0,66 to SF=1,60. Meanwhile for slopes without reinforcement bored piles with a diameter of 0,8 meters to a depth of 16 meters was used to increase the safety factor from SF=0,51 to SF=1,65.
Slope Stability for Landslide in Road Preservation Working Packages Ende-Wolowaru and Junction-Kelimutu STA 8+425 Frans Andre Sasarari; Yudhi Lastiasih; Herman Wahyudi; Agustinus Junianto
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

On the Ende-Kelimutu national road section at STA 8+425, according to the identification and field survey, the landslide that occurred at this point was caused by high rainfall intensity and geological factors of the slope. As the road supervisor, the Balai Pelaksanaan Jalan Nasional (BPJN) of East Nusa Tenggara has designed a landslide treatment using a combination of cantilever walls and drilled poles. Soil investigation data at STA 8+425 shows that the slope is dominated by sand with N-SPT values above 15 to a depth of 14.45 meters. When making design improvements, a number of rainfall data from several weather observation stations are needed, in order to determine the effect of rainwater infiltration on the landslides that occur. This study aims to determine the influence of rainwater infiltration on the occurrence of landslides at the study site, where the results of the analysis conducted with Geostudio prove the truth. Modeling with the combination of SEEP/W and SLOPE/W, the FS value before the landslide was 2.302 and then decreased to 0.35 during the landslide.
Reviewer Hitapriya Suprayitno
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Papers on JIFAM - The Journal of Infrastructure & Facility Asset Management Journal is regulated by general stipulation as follows. - Papers must be a real work of the author. - Papers has never been published in other media. - Papers must contain discussion about Infrastructure & Facility Asset Management. - Papers must contains a new discussion, judging based on the discussion that has been published in previous JIFAM. - The paper has to take references from Scientific Journal with minimum of 5 papers. - Paper lengths are limited in 8-16 pages. - Paper Template can be downloaded on the website http://https://iptek.its.ac.id/index.php/jifam Scope of Topic JIFAM accepts papers on Infrastructure & Facility Asset Management. The scope of the topic includes, but not limited to, - I & F Function - I & F Demand - Supply - I & F User Behavior - I & F Policy - I & F Planning - I & F Administration Aspects - I & F Operation System - I & F Maintenance System - I & F Evaluation Technique - I & F Disposal - I & F Economical Aspect - I & F Financial Aspect - I & F Management Organization - I & F Spatial Aspects and Environmental Aspects Reviewer Trihanyndio R. S. ST., MT., Ph.D, Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia Prof. Dr. Ir. Ria Asih A. S. M.Eng, Institut Teknologi Sepuluh Nopember (ITS), Surabaya Ir. Achmad Wicaksono M.Eng., Ph.D, Universitas Brawijaya (UB), Malang Mahendra A. M. ST., MT., Ph.D, Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia Dr. Dwa Desa Warnana S.Si., MSi, Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia Dr. Eng Januarti Jaya Eka P. ST., MT, Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia
Closure Hitapriya Suprayitno
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Journal of Infrastructure & Facility Asset Management Volume 6, Special Issue 2, January 2024 (e) ISSN 2656-8896 (P) ISSN 2656-890X JIFAM, Vol.6, Special Issue 1, January 2024 Slope Stability Analysis for Landslide in Road Preservation Working Packages Ende - Wolowaru and Junction – Kelimutu Sta 10+475Fauzan Akbar, Yudhi Lastiasih, Herman Wahyudi & Agustinus Junianto Subgrade Stabilization with Ca(OH)2 Lime to Improve the Physical and Mechanical Properties of Soil (Case Study: The National Road Trengguli – Bts. Kab. Demak/Kudus)Rahmadsyah Rangkuti, Ria Asih Aryani Soemitro, Dwa Desa Warnana, Trihanyndio Rendy Satrya & Yanuar Dwi Putra Comparison of Three Embankment Reinforcement on Soft Soil, A Case Study of Calang – Simpang Peut Road SectionDoni Mardian, Indrasurya B Mochtar & Dedy Mandarsyah Effect of Fly Ash and Bottom Ash on Characteristics of Clay Soil (Case Study: National Road Section Demak – Kudus, Indonesia)Alien Maulida Nurtaqwim, Ria Asih Aryani Soemitro, Dwa Desa Warnana, Trihanyndio Rendy Satrya & Yanuar Dwi Putra Existing Design Analysis of Slope Reinforcement on Clayey Soil and Its modified Alternatives (Case Study : Awunio – Lapuko National Road, Southeast Sulawesi)Zahrial Firman R, Mohamad Khoiri & Freddy Siagian JIFAM, Vol.6, Issue 1, January 2024 Determination of Optimum Mixture Between FABA and Local Fill Soil for Road Embankment. Case study: Road Preservation of Sp. Kereng - Bereng Bengkel – Pilang – Pulang Pisau, Central KalimantanRaden Hisyam Syauqi Al Ghifari, Noor Endah Mochtar & Soendiarto Analysis of Main Road Stability Due to The Effect of River Water Level Fluctuations and Rainfall (Case Study: Trengguli - Kudus Road Section)Akhdiat Fajar Wijaya Kusuma, Ria Asih Aryani Soemitro, Trihanyndio Rendy Satrya& Yanuar Dwi Putra Analysis of Existing Slope Reinforcement Design on Clay Shale Soil and Its Alternative Modifications: A Case Study of the Awunio – Lapuko Road Section Sta 4+955 – 5+015 in the Southeast Sulawesi ProvinceA. Azhari, Khoiri & Freddy Analysis of Road Embankment Improvement on Soft Soil Using Foamed Mortar Lightweight EmbankmentAlfiady Reza Permana Putuarga, Indrasurya B. Mochtar & Dedy Mandarsyah Determination of the Percentage Ca(OH)2 Lime Stabilization Material for Weathered Clay Shale as Road Subgrade on Serang – Panimbang Toll Road Section III STA 57+200Prince Joy Sormin, Trihanyndio Rendy Satrya, Mahendra Andiek Maulana & Wahyu Supriyo
Effect of Embankment Construction Pace on Slope Stability Wih Varied Heights on Organic Soft Soil in the Sicincin-Padang Toll Road Sta 10+250-10+400 Alfian Wildan Mulifandi; Trihanyndio Rendy Satrya; Ria Asih Aryani Soemitro; Sri Hastuti Hardiningsih
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v6i0.19953

Abstract

On the Sicincin-Padang toll road section there are several geotechnical problems, one of which is that at the Sta 10+250-10+400 is dominated by an organic soil. In the implementation of a 4.0 meter high embankment there are cracks appeared on the left side of embankment toe. Based on the evaluation results of monitoring geotechnical instruments in the field, the cracks that occur can be caused by the bearing capacity failure or due to the implementation stages of embankment construction is too fast. The method used in this research is to use finite element method by numerical simulation using Plaxis 2D program to determine the stability of embankment slope stability acording to the stages of implementation in the field and by modeling a staged construction, where the speed of embankment construction depends on the thickness of the embankment layer used, which is 15 cm to 25 cm until the design height is reached and the consolidation time is 1 day to 14 days for each additional 1 meter of embankment height. The porpose of this study is to determine the stages of implementation that are safe and compliant with the design criteria requrements. From the modeling results the existing embankment construction in the field has a safety factor value of SF=1.156. In this research, variations in the construction stages that have been modeled were obtained that are safe and meet the design criteria at the location under review are; at Sta 10+250 with using 25 cm thickness fill layer and 14 days consolidation time, Sta 10+350 with a 15 cm thickness fill layer and 7 days consolidation time, Sta 10+400 with a 25 cm thickness fill layer and 5 days consolidation time. There are differences in the effective time at each of the locations reviewed, this is due to differences in geometric embankment conditions at each location. From the results of modeling analysis, it also found that by reducing the thickness of the embankment fill layer and increasing the consolidation time, the value of the safety number will increase, the amount of settlement will increase, the amount of lateral movement will decrease and the excess pore water pressure will decrease.
Analysis Of Behavior And Chemical Stabilization Of Highly Plastic Local Excavated Soil for Embankments In The IKN Highway Project Segment 3A From Karangjoang To KKT Kariangau Mohammad Iqbal Yanuar; Herman Wahyudi; Yudhi Lastiasih; Dedi Prayitno
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v6i0.19955

Abstract

The development of IKN Nusantara (Indonesia's New Capital City) in phase I, 2022-2024, focuses on basic infrastructure development, one of which is the IKN Toll Road Segment 3A Karangjoang - KKT Kariangau (STA 14+000 - STA 25+909) in Balikpapan. This development will add back to Indonesia's infrastructure assets, especially the Ministry of Public Works and Public Housing. One of the main works in the construction of this toll road is excavation and embankment work, the need for a lot of embankment material is a problem in itself so that the excavated soil as much as possible is sought to be used as embankment soil by mixing the excavated soil with fly ash and bottom ash from Balikpapan Steam Power Plant, this is one form of soil stabilization experiment. The mixture testing was carried out by making 3 types of mixture variations namely soil + fly ash, soil + bottom ash, and soil + fly ash & bottom ash, the 3 types of mixtures were tested by standard proctor test and then continued with soaked CBR testing with 0, 7 and 14 days of curing. From these mixes, the highest soaked CBR test result value was 6.013% from the soil + BA 15% mix with 0 days of curing and the lowest value was 0.709% from the soil + FABA 10% mix with 14 days of curing. Due to the negative trend of the soaked CBR test results where the average value is below 6%, the mixed material is not recommended for use.
Analysis of Embankment Slope Failure And Effectiveness Of Reinforcement With Full Displacement Column on Soft Soil (Case Study : Construction Of Padang Sicincin Toll Road Section STA 7+400 – 7+550) Firman Arifanto; Trihanyndio Rendy Satrya; Ria Asih Aryani Soemitro; Sri Hastuti Hardiningsih
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v6i0.19964

Abstract

The package that is currently under construction on the Trans Sumatra toll road network section Padang - Pekanbaru is the Padang - Lubuk Alung - Sicincin section which is targeted for completion in July 2024. One of the obstacles in the work process is that there is an embankment landslide at STA 7 + 450 which is indicated due to a decrease in the subgrade. This resulted in the construction process not being able to continue so there was a delay in the progress of construction implementation. Therefore, a study is needed that focuses on analyzing the causes of landslides and follow-up recommendations to overcome problems in the STA 7 + 450 embankment work on the Padang - Pekanbaru Toll Road Construction project section Padang - Lubuk Alung - Sicincin. The method used in this research is finite element modeling analysis using the help of the PLAXIS 2D program by looking at the Safety Factor value of the embankment slope under initial conditions and back analysis. The landslide modeling results with the finite element method are also compared with the landslide lines that occur in the field. From the back analysis, new parameters are obtained when a landslide occurs as input in the reinforcement analysis to be used. For follow-up improvement, full displacement column reinforcement is proposed where the effect of FDC column spacing, thickness, and load transfer platform material combination on slope stability, settlement, and changes in soil mechanical parameters will be analyzed. It was found that the embankment structure before the collapse had a critical SF value of SF = 1.010. The cause of the landslide was indicated to be due to the additional load from the project vehicle traffic. Parameter changes were obtained in the form of c' = 8.17 kN/m2 and Ø' =19.68o, cc = 0.8175, and cs =0.1204 in the organic soft soil which was indicated to be the cause of the landslide. From the modeling results to find the effectiveness of reinforcement with FDC, the optimum parameters were obtained concerning a distance of 3 times the column diameter, and a Load Transfer Platform thickness of 1.8 meters with geogrid reinforcement.
Effectiveness And Stability Analysis Of Embankment Using Lightweight Embankment On Pasuruan - Probolinggo Toll Road Project Section 4, Indonesia Ruri Febri Ritwandanu; Herman Wahyudi; Yudhi Lastiasih; Hamim Mufijar
Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v6i0.19965

Abstract

The Pasuruan-Probolinggo Section 4 Toll Road project which has a length of 12.04 km is dominated by silty clay - clay. In addition to soft soil, there are other problems in the construction of the Pasuruan - Probolinggo Section 4 toll road, namely the limited availability of embankment soil material around the project site and the location of the quarry which is quite far away. In addition, when relying on embankment material from the quarry, the weather factor will play a very important role when the weather is rainy then the activity in the quarry stops, the targeted embankment volume is not met and the progress of work on that day is not achieved. Therefore, there is a need for alternative reinforcement of embankments other than soil embankments from quarries that are safe and light enough. Based on the existing problems, this research will conduct a comparative study of toll road embankment design with 3 different types of materials, namely: Conventional soil embankment compared with lightweight embankment in the form of EPS-Geofoam material and foam mortar material. This research will use Plaxis 2D program. The results of this research will determine alternative embankment materials that can be applied to soft subgrade so that overall stability and hydrostatic uplift requirements can be met. This research is expected to be a reference in planning the construction and improvement of the subgrade of the Pasuruan-Probolinggo Section 4 toll road and other toll roads using EPS geofoam embankment and foam mortar

Filter by Year

2019 2026


Filter By Issues
All Issue Vol 8 No 1 (2026): Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 7 No 1 (2025): Journal of Infrastructure & Facility Asset Management Vol 7, No 1 (2025): Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 6, No 1 (2024): Journal of Infrastructure & Facility Asset Management Vol 6 No 1 (2024): Journal of Infrastructure & Facility Asset Management Vol 5 No 2 (2023): Journal of Infrastructure & Facility Asset Management Vol 5 (2023): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 5, No 1 (2023): Journal of Infrastructure & Facility Asset Management Vol 5 No 1 (2023): Journal of Infrastructure & Facility Asset Management Vol 4 No 2 (2022): Journal of Infrastructure & Facility Asset Management Vol 4, No 2 (2022): Journal of Infrastructure & Facility Asset Management Vol 4, No 1 (2022): Journal of Infrastructure & Facility Asset Management Vol 4 No 1 (2022): Journal of Infrastructure & Facility Asset Management Vol 3, No 3 (2021): Journal of Infrastructure & Facility Asset Management Vol 3 No 3 (2021): Journal of Infrastructure & Facility Asset Management Vol 3 No 2 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 2 (2021): Journal of Infrastructure & Facility Asset Management Vol 3 No 1 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 1 (2021): Journal of Infrastructure & Facility Asset Management Vol 2 No 2 (2020): Journal of Infrastructure & Facility Asset Management Vol 2, No 2 (2020): Journal of Infrastructure & Facility Asset Management Vol 2 (2020): Supplement 1 : Journal of Infrastructure & Facility Asset Management Vol 2 No 1 (2020): Journal of Infrastructure & Facility Asset Management Vol 2, No 1 (2020): Journal of Infrastructure & Facility Asset Management Vol 1, No 2 (2019): Journal of Infrastructure & Facility Asset Management Vol 1 No 2 (2019): Journal of Infrastructure & Facility Asset Management Vol 1 No 1 (2019): Journal of Infrastructure & Facility Asset Management Vol 1, No 1 (2019): Journal of Infrastructure & Facility Asset Management More Issue