cover
Contact Name
Putri Nur Dayana
Contact Email
putrinurd93@gmail.com
Phone
+62811327813
Journal Mail Official
jurnal.jifam@gmail.com
Editorial Address
Editor Journal of Infrastructure & Facility Asset Management Civil Engineering Dept., Building 2nd Floor, Room J-201 Sukalilo ITS Campus Surabaya 60111
Location
Kota surabaya,
Jawa timur
INDONESIA
Journal of Infrastructure and Facility Asset Management
ISSN : 2656890X     EISSN : 26568896     DOI : http://dx.doi.org/10.12962/jifam.v2i1.6965
Journal of Infrastructre & Facility Asset Management is aimed to develop Infrastructure & Facility Asset Management Sciences and Knowledge. This journal accepts paper contains the results of research or knowledge development in Infrastructure & Facility Asset Management from anywhere. This journal is published regularly 2 times a year, every March and September. If needed, this journal can also be published in June and December as Supplement Issue. Supplements are not of mandatory publishing. Supplements are only issued if deemed necessary.
Articles 308 Documents
Analysis of the impact of soil excavation stages on slope stability case study of road and bridge construction projects in bts. Singaraja-Mengwitani at point 7E, Bali Guilden Laelatu Yudha; Ria Asih Aryani Soemitro; Trihanyndio Rendy Satrya; Noor Fachrie
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22441

Abstract

The Singaraja -Pengayaman BTS Road Section is a national road located in the central corridor of Bali Island and includes several critical locations in terms of road geometry. Geometric adjustments are being addressed through the BTS Singaraja -Mengwitani Road and Bridge Construction Project Section 7E, involving excavation work up to 64 meters high at STA. 0+119.87. This study aims to analyze slope stability based on existing conditions, evaluate the impact of excavation method variations on slope stability, and determine effectiveexcavation methods both with and without the influence of water on slope stabilityusing Plaxis 2D program. The research results indicate that the safety factor (SF) value of the existing slope prior to excavation was 1.337, whereas it decreased to 1.034 after the final excavation stage. According to the SNI 8460:2017 standard (SF < 1.5), the slope condition in the final excavation stage is deemed unsafe. Excavations with depth variations of 1 meter, 2 meters, and 3 meters, as well as at slope angles of 45 ̊, 55 ̊, and 65 ̊, showed similar impacts on slope stability. A significant decrease in the safety factor occurred from the 7th excavation bench downward, where the safety factor fell below 1.3. At the end of the excavation process, the deepest sliding surface reached a depth of 20.11 meters. At an elevation of +36.5 meters, where the groundwater level reaches 56.40% of the total slope height, which marks the boundary between soil and rock layers, the safety factor drops to 1.040. Further increases in groundwater levels above +36.5 meters could render the slope unstable and potentially lead to collapse.
Planning of Alternative Embankment Reinforcement on the Roadway. Case Study: Landslide on the Bypass Road of Lombok International Airport - Mandalika Section Km 10+415 to 10+519 Panji Ageng Ichtiar; Mohamad Khoiri; Dwa Desa Warnana; Herlambang Zulfikar
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22442

Abstract

The Lombok International Airport – Mandalika Bypass Road experienced a landslide at KM 10+415 to 10+519 in February 2023 during heavy rainfall. The landslide is estimated to have occurred due to the saturation of the embankment caused by groundwater flow and rainwater infiltration. The proposed reinforcement includes the use of foam mortar with thickness variations of 2m, 4m, and 6m, with or without subdrain. Another proposal involves using Rigid Inclusions in the form of controlled modulus columns (CMC) with column spacing variations of 2ø, 3ø, and 4ø, with or without subdrain. Numerical analysis of the safety factor (SF) and deformation (Uy) was conducted using the Plaxis 2D program, both for the initial condition and after reinforcement. In general, the SF and deformations (Uy) for all reinforcement variations meet the reinforcement criteria, i.e., SF > 1.5 and deformations (Uy) < 2cm. The smallest SF of 1.579 was obtained with 4m thick foam mortar with subdrain. The largest deformations (Uy) of 1.656 was found with 2ø column spacing CMC without subdrain. The most effective Stress Reduction Ratio of 0.13 was achieved with 2ø column spacing CMC without subdrain. The influence of the subdrain is not significant because the landslide surface did not reach the groundwater table.
Analysis of the Use of a Combination of Soil Embankment and Lightweight Material (Foam Mortar) as an Alternative to Slab on Pile Construction Case Study: Rengat-Pekanbaru Toll Road Construction Project Section Lingkar Pekanbaru-Junction Pekanbaru Sta 19 Wahyu Maya Dewatama; Noor Endah Mochtar; Indrasurya B. Mochtar; Mahar Muliawan
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22443

Abstract

The soil condition on the Rengat - Pekanbaru Toll Road Sta 193+ 025 - Sta 193+400 which passes through oil palm plantations, swamp areas, and the Siak River, consists of a compressible layer as thick as 7.0 meters. To handle the problem, a 375 m long slab on pile construction was planned with a construction time of 3 months. However, the design was costly; therefore, alternative planning using ordinary piles and a combination of ordinary and lightweight piles was required. The rate of settlement at the study site did not meet the requirements for t = 1 year (< 2cm/year) or t = 10 years (< 10cm/10 years). Therefore, it is necessary to install PVDs with an installation distance of 1.0 meter and a length of 7.0 m. The stability analysis showed that as the percentage of foam mortar increases, the SF value increases. The bearing capacity of the subgrade was increased by installing geotextiles; the number of geotextile layers required at each site varied depending on the height of the embankment and the combination of soil + foam mortar, the thicker the foam mortar, the less geotextile layers were required. The number of reinforcing piles was also planned according to the thickness of the soil and foam mortar variations; the thicker the foam mortar, the less piles were required. In terms of cost, the slab on pile replacement structures that provide savings are geotextile-reinforced soil backfill and a combination of soil backfill with 25% thick foam mortar. Each of these replacement structures provides savings of Rp 40 billion (without foam mortar) and Rp 12.1 billion (with 25% thick foam mortar). For the implementation time, both methods require the same completion time as slab on pile which is 3.5 months.
Comparison Between Soil Improvement Design Method of Replacement and PVD Installation for Soft Soil Embankment, Case Study: Probolinggo – Banyuwangi Toll Road Project Section 3 Sta 23+075 – 23+670 Esti Kusuma Wardani; Reza Kazhimi
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22444

Abstract

The Probolinggo – Banyuwangi Toll Road, part of Trans Java Toll Road, is one of the strategic projects which connects the west to the east of the island of Java. On this toll road, precisely in section 3 STA 23+075 – 23+670, the toll road structure and pavement construction stands on soft ground with varying depths, with the deepest point being around 9 meters. It is concerned that the presence of soft soil which is quite deep will cause damage to the pavement, which will cause discomfort for road users if the soft soil cannot be improved properly. In this study, several alternatives are designed which will later be used as considerations for the project owner to determine the most effective method for improving soft soil at that location. The method used is subgrade replacement which will later be compared with the use of PVD along with estimated costs for each method. Apart from that, an analysis was also carried out regarding compliance with the rate of residual settlement regulations from the Director General of Highways, namely less than 2 cm per year and less than 10 cm per 10 years. From the study results, it was found that the rate of settlement of all variations of soft soil and replacement had met the Bina Marga regulations. In addition, a comparison of PVD cost requirements with replacement showed that PVD requires lower costs than replacement with a maximum time of ±5 weeks so that it can be concluded as the best alternative method.
Slope Design for Cost Optimization of Slope Cutting and Reinforcement (Case Study: Trans-Sumatra Toll Road Rengat Pekanbaru Section Lingkar Pekanbaru Junction Pekanbaru Sta. 205+150 - 205+725) R Fiansyah Dwi Prasetiyo; Noor Endah Mochtar; Indra Surya B Mochtar; Mahar Muliawan
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22445

Abstract

Reviewer Hitapriya Suprayitno
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Paper Writting Stipulation Papers on JIFAM - The Journal of Infrastructure & Facility Asset Management Journal is regulated by general stipulation as follows. - Papers must be a real work of the author. - Papers has never been published in other media. - Papers must contain discussion about Infrastructure & Facility Asset Management. - Papers must contains a new discussion, judging based on the discussion that has been published in previous JIFAM. - The paper has to take references from Scientific Journal with minimum of 5 papers. - Paper lengths are limited in 8-16 pages. - Paper Template can be downloaded on the website http://https://iptek.its.ac.id/index.php/jifam Scope of Topic JIFAM accepts papers on Infrastructure & Facility Asset Management. The scope of the topic includes, but not limited to, - I & F Function - I & F Demand - Supply - I & F User Behavior - I & F Policy - I & F Planning - I & F Administration Aspects - I & F Operation System - I & F Maintenance System - I & F Evaluation Technique - I & F Disposal - I & F Economical Aspect - I & F Financial Aspect - I & F Management Organization - I & F Spatial Aspects and Environmental Aspects Reviewer Prof. Dr. Ir. Ria Asih A. S. M.Eng, Institut Teknologi Sepuluh Nopember (ITS), Surabaya Dr. Trihanyndio R. S. ST., MT., Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia Dr. Mahendra A. M. ST., MT., Institut Teknologi Sepuluh Nopember (ITS), Surabaya, Indonesia
Closure Hitapriya Suprayitno
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Journal of Infrastructure & Facility Asset Management Volume 7, Special Issue 1, January 2025 (e) ISSN 2656-8896 (P) ISSN 2656-890X Volume 7, Special Issue 1, January 2025 Parametric Study of Embankment Stability And Geotextile Reinforcement On Soft SoilMirza Syah Alam, Herman Wahyudi, Yudhi Lastiasih, Yusrizal Kurniawan Analysis Of Slope Stability Based On The Effect Of RainFall On The Lombok International Airport (BIL) – Mandalika Road STA 10+375 to STA 10+550Made Sudiadnya, Mohamad Khoiri, Dwa Desa Warnana, Herlambang Zulfikar Analysis of The Effect of Seismic Load on The Design Safety Factor of Foam Mortar with Bored Pile Landslide Location of Batas Pidie/Aceh Besar – Bts. Kota Sigli STA 0+560Ichvan Danny Kurniawan, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro,Fikri Afzal A Study of Pile Displacement in Soft Soil: The Case of Semarang - Demak Toll Road Construction Package 1BNovera Sagita, Herman Wahyudi, Yudhi Lastiasih &Yusrizal Kurniawan Design Of Toll Road Embankment With Secondary Compression Mitigation After PVD Installation And Solutions For The Probolinggo – Banyuwangi Toll Road Construction Project PackKAGE 2 STA 16+300 – STA 16+700Septya Kukuh Aryandi, Indrasurya B. Mochtar, Noor Endah, Abdjad Agung Artanto Volume 6, Special Issue 3, January 2024 Effect of Stabilization Soil With Fly Ash and Bottom Ash on Characteristics of Residual Soil (Padang-Sicincin Toll Road)Novema Dwi Saputra, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro & Sri Hastuti Hardiningsih Effect of Embankment Construction Pace on Slope Stability Wih Varied Heights on Organic Soft Soil in the Sicincin-Padang Toll Road Sta 10+250-10+400Alfian Wildan Mulifandi, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro &Sri Hastuti Hardiningsih Analysis Of Behavior And Chemical Stabilization Of Highly Plastic Local Excavated Soil for Embankments In The IKN Highway Project Segment 3A From Karangjoang To KKT KariangauMohammad Iqbal Yanuar, Herman Wahyudi, Yudhi Lastiasih & Dedi Prayitno Analysis of Embankment Slope Failure And Effectiveness Of Reinforcement With Full Displacement Column on Soft Soil (Case Study : Construction Of Padang Sicincin Toll Road Section STA 7+400 – 7+550)Firman Arifanto, Trihanyndio Rendy Satrya, Ria Asih Aryani Soemitro & Sri Hastuti Hardiningsih Effectiveness And Stability Analysis Of Embankment Using Lightweight Embankment On Pasuruan - Probolinggo Toll Road Project Section 4, IndonesiaRuri Febri Ritwandanu, Herman Wahyudi, Yudhi Lastiasih & Hamim Mufijar Comparation of Limit Equilibrium Method (LEM) 2D on Safety Factor and Embankment ReinforcementAisiyah Pramaisela Hapsari & Yudhi Lastiasih
Handling Selection of Settlement and Embankment Stability Issues Based on Variations in Embankment Height and Soft Subgrade Thickness Case Study: Pekanbaru Junction - Pekanbaru Bypass Sta. 176+775 - Sta. 176+975 Pandu Hermawan; Noor Endah Mochtar; Indrasurya B. Mochtar; Mahar Muliawan
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22471

Abstract

Trans Sumatra Toll Road (JTTS) is one of the most important infrastructure projects in Indonesia. One of the main sections of JTTS is the Rengat - Pekanbaru Toll Road, Pekanbaru Ring Section (Pekanbaru Junction - Pekanbaru Bypass). Existing conditions at Sta 176+775 - Sta 176+975 are dominated by oil palm plantations with soft soil layers in the form of organic soil to a depth of 1.0 meter; the layer below is clay with medium to stiff consistency. The existing treatment plan is preloading embankment with PVD and 1,0 m deep subgrade replacement. In this study, alternative planning calculations were carried out with variations of subgrade replacement up to 0.5 m and 1,0 m thickness. The study results show that the most cost-optimal treatment design is the treatment design without replacement with geotextile reinforcement. The thicker the subgrade replacement, the smaller the compression and rate of settlement. In terms of embankment reinforcement, the thicker the subgrade replacement, the less reinforcement is required. The thickness of subgrade replacement also affects the cost of the work, the thicker the subgrade replacement, the higher the cost of the work.
Slope Stability Analysis Under Dry-Wetting Cycle Conditions (Case Study: Landslide Countermeasure of Batas Pidie/Aceh Besar - Batas Kota Sigli) Zulfadhli Zulfadhli; Trihanyndio Rendy Satrya; Ria Asih Aryani Soemitro; Fikri Afzal
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22472

Abstract

A landslide occurred on National Road Section Bts. Pidie/Aceh Besar - Bts. Kota Sigli Sta. 0+500 during the peak of the rainy season has resulted in the disruption of traffic lanes. Soil samples were obtained from the landslide site for inclusion in the testing process. The laboratory tests encompass a range of physical and mechanical parameters and also dry-wetting procedures. The result shows that the topsoil layer consists of sandy silty clay with medium plasticity. Then, a dry-wetting cycle was conducted to simulate the dry and rainy season by introducing and reducing water content from the initial condition (wi) to saturated (wsat) and to airdried (wairdry) with 25%, 50%, 75%, and 100% interval. The results showed a decrease in unconfined compressive strength (qu) by 22.70% and negative pore water pressure (-Uw) by 53.14%. Slope stability analysis found that the slope was stable after the landslide with an FS value of 1.380 and increased to 1.410 when there was the addition of slab on pile road construction. The addition of rainfall variations for 3 and 5 hours is insignificant to the stability of the slope due to the groundwater table being too deep to affect pore water pressure.
Behaviour Study of Abutment Foundation Pile on Lightweight Embankment Oprit (Case Study: Kali Otek Bridge – Lamongan North Ring Road Construction Package Section 2) Nila Wahyu Pertiwi; Ria Asih Aryani Soemitro; Trihanyndio Rendy Satrya; Sifa’ Udukha
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22475

Abstract

The Kali Otek Bridge is in the Lamongan North Ring Road Development Package Section 2 with a bridge span length of 40.8m. The boring test results show that the subgrade is included in the very soft soil classification to a depth of >15 meters. The existing condition is a pond area that can be inundated with water reaching a height of 1 meter, thus affecting the occurrence of land subsidence and stability of the bridge abutment foundation pillars. The existence of embankment construction can also cause subsidence on the subgrade.In this research, soil settlement and stability analysis of lightweight foam mortar embankment has been carried out by varying the percentage of the height of the existing embankment and the foam mortar. In addition, it also analyzes the effect of using lightweight embankment, both as a whole and its variations on the stability of bridge abutment foundation piles, both with and without Prefabricated Vertical Drain (PVD).The analysis showed that the use of foam mortar reduced the subgrade settlement by 61.2% with a longer time of 18.5%. The smallest settlement and lateral deflection was at 100% foam mortar backfill variation with consolidation time of 190 days. The greater the percentage of foam mortar height, the smaller the settlement as the factor of safety increases. Thus, the use of foam mortar can be an alternative embankment for bridge oprites on soft soil.

Filter by Year

2019 2026


Filter By Issues
All Issue Vol 8 No 1 (2026): Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 7 No 1 (2025): Journal of Infrastructure & Facility Asset Management Vol 7, No 1 (2025): Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 3 : Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 2 : Journal of Infrastructure & Facility Asset Management Vol 6 (2024): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 6, No 1 (2024): Journal of Infrastructure & Facility Asset Management Vol 6 No 1 (2024): Journal of Infrastructure & Facility Asset Management Vol 5 No 2 (2023): Journal of Infrastructure & Facility Asset Management Vol 5 (2023): Special Issue 1 : Journal of Infrastructure & Facility Asset Management Vol 5 No 1 (2023): Journal of Infrastructure & Facility Asset Management Vol 5, No 1 (2023): Journal of Infrastructure & Facility Asset Management Vol 4 No 2 (2022): Journal of Infrastructure & Facility Asset Management Vol 4, No 2 (2022): Journal of Infrastructure & Facility Asset Management Vol 4, No 1 (2022): Journal of Infrastructure & Facility Asset Management Vol 4 No 1 (2022): Journal of Infrastructure & Facility Asset Management Vol 3 No 3 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 3 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 2 (2021): Journal of Infrastructure & Facility Asset Management Vol 3 No 2 (2021): Journal of Infrastructure & Facility Asset Management Vol 3 No 1 (2021): Journal of Infrastructure & Facility Asset Management Vol 3, No 1 (2021): Journal of Infrastructure & Facility Asset Management Vol 2 No 2 (2020): Journal of Infrastructure & Facility Asset Management Vol 2, No 2 (2020): Journal of Infrastructure & Facility Asset Management Vol 2 (2020): Supplement 1 : Journal of Infrastructure & Facility Asset Management Vol 2, No 1 (2020): Journal of Infrastructure & Facility Asset Management Vol 2 No 1 (2020): Journal of Infrastructure & Facility Asset Management Vol 1 No 2 (2019): Journal of Infrastructure & Facility Asset Management Vol 1, No 2 (2019): Journal of Infrastructure & Facility Asset Management Vol 1, No 1 (2019): Journal of Infrastructure & Facility Asset Management Vol 1 No 1 (2019): Journal of Infrastructure & Facility Asset Management More Issue