cover
Contact Name
Vega Aditama
Contact Email
vegaaditama@lecturer.itn.ac.id
Phone
+6282257017949
Journal Mail Official
vegaaditama@lecturer.itn.ac.id
Editorial Address
Jl. Bendungan Sigura-gura No 2 Malang, Jawa TImur
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Infomanpro
ISSN : 24609609     EISSN : 27747956     DOI : -
Core Subject : Social, Engineering,
Infomanpro Journal is a publication media of research results in the field of Civil Engineering and sub-fields of structure, geotechnical engineering, transportation, construction management, and water resources. This journal is published regularly as much as 2 volumes per year in June and December.
Articles 3 Documents
Search results for , issue "Vol 14 No 2 (2025): JURNAL INFOMANPRO" : 3 Documents clear
KEPUTUSAN PRIORITAS PENANGANAN KERUSAKAN JALAN DENGAN PENDEKATAN SIMPLE ADDITIVE WEIGHTING Ma'ruf, Annur; Donny Maynando Gennaryo; Krisna Febrian Anugerahputra
Jurnal Teknik Sipil Info Manpro Vol 14 No 2 (2025): JURNAL INFOMANPRO
Publisher : Pascasarjana Teknik Sipil Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36040/infomanpro.v14i2.15309

Abstract

Kabupaten Sumba Barat merupakan salah satu daerah di Nusa Tenggara Timur dengan luas wilayah sebesar 737,42 km2 serta jumlah penduduk sebanyak 129.710 jiwa. Kabupaten ini memiliki APBD tahun 2023 sebesar Rp200.954.111.325,- dengan alokasi belanja modal jalan, jaringan dan irigasi sebesar Rp118.423.906.212,- Studi ini bertujuan untuk menentukan prioritas penanganan kerusakan jalan untuk ruas jalan Kabupaten Sumba Barat. Metode pendekatan analisis yang digunakan pada kajian ini adalah Simple Additive Weighting (SAW) dimana metode ini dapat memberikan keputusan prioritas dengan banyak kriteria dari banyak alternatif. Pemilihan alternatif dianalisis berdasarkan bobot kepentingan antar kriteria antar alternatif. Berdasarkan hasil analisis diperoleh bobot masing-masing alternatif pada ruas jalan Weekarou – Sodana sebesar 1,153, ruas jalan Gaura - Rita sebesar 1,131, ruas jalan Sobawawi - Weekarou sebesar 1,120, Ruas jalan Wanukaka – Rua sebesar 1,118, dan ruas jalan Kurutepe - Matakaito sebesar 1,086. Berdasarkan nilai bobot yang diperoleh, maka ruas jalan Weekarou – Sodana merupakan prioritas utama untuk mendapatkan penanganan kerusakan jalan di Kabupaten Sumba Barat.
Analisa Kelayakan Finansial Perencanaan Tempat Pengolahan Sampah Berbasis 3R (Reduce, Reuse, Recycle) di Kecamatan Bangil Kabupaten Pasuruan Rachmawati, Vitha
Jurnal Teknik Sipil Info Manpro Vol 14 No 2 (2025): JURNAL INFOMANPRO
Publisher : Pascasarjana Teknik Sipil Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36040/infomanpro.v14i2.15881

Abstract

The increasing population in Bangil District, Pasuruan Regency, has resulted in an increase in waste generation, reaching 424.53 tons/year. Waste management is certainly necessary to maintain a clean and beautiful environment. Waste management through the 3R concept (Reduce, Reuse, Recycle) is one of the strategic solutions to reduce the volume of waste entering the Final Processing Site (TPA). This study aims to analyze the financial feasibility of planning a 3R waste processing site (TPS) in three densely populated sub-districts: Kolursari, Kidul Dalem, and Pogar. The research methods include a survey of waste generation and composition, land requirements analysis, preparation of a budget plan (RAB), and financial feasibility analysis using Net Present Value (NPV) and Benefit Cost Ratio (BCR) indicators with a 10% discount rate and a 10-year project life. The planning results show a land requirement of 976.05 m² with a RAB of Rp 645,171,893,- with revenue from waste levies and waste sales per year of Rp 1,194,866,460,- and operational expenses per year of Rp 428,133,600,-. The NPV value obtained is Rp 4,066,069,249 > 0 and BCR 2.24 > 1, indicating that the project is financially feasible.
Analisis Optimasi Percepatan Waktu Proyek Konstruksi untuk Mengatasi Keterlambatan Jadwal Kartika, Deviany; Lila Ayu Ratna Winanda; Jeremy Irawan
Jurnal Teknik Sipil Info Manpro Vol 14 No 2 (2025): JURNAL INFOMANPRO
Publisher : Pascasarjana Teknik Sipil Institut Teknologi Nasional Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36040/infomanpro.v14i2.16176

Abstract

Keterlambatan dalam proyek konstruksi sering kali menjadi tantangan utama yang dapat mempengaruhi biaya, kualitas, dan keberlanjutan proyek. Keterlambatan yang terjadi harus segera diatasi agar target proyek tersebut tidak terganggu.Penelitian ini bertujuan menganalisis strategi percepatan (crashing) pada proyek Paket Rehabilitasi Drainase Perkotaan Kecamatan Kertosono.Proyek rehabilitasi drainase ini penting untuk dilakukan karena cuaca yang cukup ekstrim saat ini, bahkan terdapat banjir dibeberapa tempat. Proyek mengalami keterlambatan hingga minggu ke-5 akibat berbagai faktor teknis dan non-teknis, sehingga untuk mengatasi keterlambatan tersebut, dilakukan analisis percepatan dengan dua metode, yaitu penambahan jam lembur dan penambahan sumber daya tenaga kerja.Dari hasil perhitungan, baik percepatan dengan menambah 2 jam lembur maupun penambahan sumberdaya berupa pekerja dan tukang sama-sama menghasilkan waktu penyelesaian akhir total sebesar 53 hari. Oleh karena menghasilkan hasil waktu yang sama, maka direkomendasikan melakukan percepatan dengan menambah sumberdaya, dengan kenaikan biaya total sebesar 2.290%dari rencana awal, serta penurunan waktu sebesar 11.667% dari waktu rencana. Sehingga penambahan sumberdaya adalah aksi yang paling optimal untuk dilakukanPerbandingan kedua metode menunjukkan bahwa penambahan sumber daya lebih ekonomis dibandingkan penambahan jam lembur, meskipun keduanya menghasilkan percepatan yang sama.Penelitian ini memberikan wawasan tentang pentingnya pemilihan metode percepatan yang tepat untuk mengoptimalkan biaya dan waktu dalam penyelesaian proyek yang tertunda. Implementasi strategi crashing yang efisien dapat menjadi solusi untuk mengurangi dampak keterlambatan proyek, sekaligus memastikan penyelesaian sesuai dengan target yang telah ditetapkan.

Page 1 of 1 | Total Record : 3