cover
Contact Name
Susanti Sundari
Contact Email
susanti.sundari@utb.ac.id
Phone
+6281279266529
Journal Mail Official
industrikautb@gmail.com
Editorial Address
Redaksi INDUSTRIKA : JURNAL ILMIAH TEKNIK INDUSTRI Fakultas Teknik Universitas Tulang Bawang (UTB) Lampung Jl. Gajah Mada. No. 34 Kotabaru, Bandar Lampung 35121 Tel / fax : (0721) 252 686 / (0721) 254 175
Location
Kota bandar lampung,
Lampung
INDONESIA
Industrika : Jurnal Ilmiah Teknik Industri
ISSN : 27764745     EISSN : 25795732     DOI : https://doi.org/10.37090/indstrk.v5i1
INDUSTRIKA is a research journal which facilitates the publication of scientific articles in the field of Industrial Engineering. The published articles in INDUSTRIKA can be the result of research and literature review. Some of the topics are including: Business and strategy; decision analysis Engineering economy; Environmental issues Facility location; layout; design; materials handling Forecasting; production planning/control Human factors; ergonomics; safety Human resources management ICT and information systems Innovation; knowledge management; organizational learning Inventory; logistics; transportation; Manufacturing; control; automation Product/process design and management Project/operations management; Service systems/management; modeling/simulation
Articles 436 Documents
Analisis Perencanaan dan Pengendalian Persediaan Material Filter Menggunakan Metode Forecasting di PT ABC Putri Febriyani; Dene Herwanto; Febrian Hiltono
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/1x77f490

Abstract

Effective inventory management is a crucial aspect in ensuring the continuity of production processes and fulfilling customer demand optimally, especially in a dynamic and fluctuating market environment. PT ABC, as a manufacturing company producing filter components, faces challenges related to demand fluctuations and additional Purchase Orders (PO) from customers, which impact material availability. This study aims to analyze the planning and control of filter inventory by applying forecasting methods, specifically Moving Average and Linear Regression methods. Historical demand data were used to forecast the requirements for filters with diameters Ø50 mm and Ø72 mm. The results indicate that Linear Regression produces lower forecasting errors compared to Moving Average for both filter sizes. For the Ø50 mm filter, Linear Regression yields an MSE of 3,524,583.3, MAD of 1,576, and MAPE of 0.4121, all of which are lower than the values produced by the Moving Average method. A similar pattern is observed for the Ø72 mm filter, where Linear Regression results in an MSE of 1,182,480.374, MAD of 817, and MAPE of 0.2667, which are also lower than those generated by Moving Average. Therefore, this study concludes that Linear Regression is the recommended forecasting method for planning filter requirements at PT ABC. Keywords: Filter, Forecasting, Linier Regression, Material, Moving Average
Pengendalian Kualitas Screen Assy dengan Metode Seven Tools Pada PT Industri Komponen Otomotif Febrian Hiltono; Dene Herwanto; Rafli Bagas Prayoga; Putri Febriyani
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/zvwnzg25

Abstract

Quality problems persist in the production of the 14.08 mm Screen Assy at PT Industri Komponen Otomotif, where the observed defect rate surpasses the company’s quality standard. Production records from 2024 show an average defect rate of roughly 2%, well above the company’s tolerance of 0.2%, and Ami (wire mesh) defects are the most frequent type. Such defects can lower product quality and push up costs through rework and scrap, so a more structured approach to quality control is needed. This study applies the seven quality control tools (check sheet, histogram, Pareto chart, scatter diagram, cause-and-effect or fishbone diagram, control chart, and flowchart) in a quantitative approach to inspection reports collected from April 2024 to February 2025. Of the 268,584 units produced, 3,141 were defective, and Ami defects accounted for 1,093 units (32.3%). The fishbone analysis points to human factors as the leading cause, followed by machine and work-method factors. The process is generally statistically in control, although several points lie close to the upper control limit. The Seven Tools thus help trace the root causes of defects in an organized way and provide a basis for continuous improvement proposals. Keywords: Defect, Fishbone Diagram, Quality Control, Screen Assy, Seven Tools  
Analisis Persediaan Roda dengan Metode Periodic Order Quantity (POQ) dan Minimum-Maximum (Studi Kasus: Perusahaan Kendaraan Motor) Muhammad Aqil Muzhaffar; Wahyudin Wahyudin
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/n45z8e22

Abstract

Vehicle manufacturing companies are among those that prioritize inventory management, especially wheels. Data on motorcycle wheel usage and inventory for 2024 shows that the company experienced an overstock of 3,743 units, or 5% of the total usage of 75,020 units in 2024. This was due to inventory planning that was still less than ideal. The Minimum-Maximum and Periodic Order Quantity (POQ) methods can be used by companies to control inventory efficiently, as these methods can help optimize quantities, ordering intervals, and reduce cost waste. Based on the results of calculations using both methods in the case study, it was found that the Total Inventory Cost using the POQ method was Rp. 554,921,669, which is much lower than the Min-Max method, which reached Rp. 2,438,024,040 or equivalent to 77.24%. These calculation results show that the POQ method is superior to the Min-Max method in determining order quantity, frequency, safety stock, and inventory costs. Through this research, it is hoped that companies can consider optimizing storage costs, reducing the risk of overstocking, and improving the efficiency of wheel component supply chain management based on the selected method. Keywords:  Inventory Control, Minimum-Maximum, Periodic Order Quantity, Wheel.
Evaluasi Beban Kerja Staf Divisi Accounting Menggunakan Metode Workload Analysis Melalui Pendekatan Work Sampling di PT. Z Indah Tri Arsy Nurul Hudda; Dene Herwanto; Wahyudin Wahyudin
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/xy1eqw76

Abstract

Effective human resource management requires a balance between workload and employee capacity to ensure optimal organizational performance. An imbalance in workload, particularly underload conditions, may lead to inefficient use of working time and reduced productivity. Preliminary observations in the Accounting Division of PT. Z indicated that Staf workload appeared relatively low compared to the available working time, suggesting suboptimal utilization of human resources. Therefore, a systematic workload evaluation was required. This study aims to evaluate the workload of Accounting Division Staf using the Workload Analysis method through a Work Sampling approach. The research employed a quantitative approach by conducting observations over five working days on two Accounting Staf members, with activity records taken at five-minute intervals. Work activities were classified into productive, supportive, and non-productive activities. The results showed that Staf 1 had a workload level of 78% and Staf 2 had a workload level of 81%, both of which fall into the underload category. These findings indicate the presence of unused working time that has not been optimally utilized. Therefore, this study recommends a reassessment of task distribution and the addition of relevant responsibilities to improve efficiency and achieve a more balanced workload in the Accounting Division. Keywords: Accounting Division, Workload Analysis, Work Sampling
Analisis Pengendalian Kualitas Produk Aki Otomotif Menggunakan Metode Six Sigma di Industri Manufaktur Baterai Naufal Muhammad Renaldi; Fransisca Debora; Muhammad Farhan Rusdy Setiawan
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/safjpz25

Abstract

Product quality is essential for maintaining the competitiveness of battery manufacturing industries. A high defect rate increases production costs and reduces customer satisfaction. This study aims to analyze and improve the battery production process using the Six Sigma method with the DMAIC (Define, Measure, Analyze, Improve, Control) approach. Process capability was evaluated using Defects Per Million Opportunities (DPMO), sigma level, and a p-control chart, while dominant defects and their root causes were identified through a Pareto chart and a cause-and-effect diagram. The results showed an average DPMO of 149, a sigma level of 5.1, and a defect proportion of 0.104%, indicating that the production process achieved world-class capability and remained statistically under control. The dominant defects were splash (44%), leakage (21%), and sunken pole (8%). The proposed improvements reduced the defect rate from 3.57% to 2.77% through operator competency enhancement, routine machine maintenance, and standardized work procedures. These findings demonstrate that the Six Sigma approach is effective in improving production process quality. Keywords: Defect Analysis, DMAIC, Process Improvement, Quality Control, Six Sigma.
Perancangan Dashboard Monitoring Kinerja Produksi Berbasis Key Performance Indicator (KPI) pada Perusahaan Manufaktur Otomotif Muhammad Nashiruddin; Susanti Sundari
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/gy826w72

Abstract

Competition in the automotive manufacturing industry requires companies to monitor production performance quickly, accurately, and in an integrated manner. Common problems include fragmented production data, periodic reporting, and limited visualization of production achievement, productivity, quality, and downtime. This study aims to design a production performance monitoring dashboard based on Key Performance Indicators (KPIs) to support management in monitoring production conditions and determining improvement priorities. The research method consists of information-needs identification, data collection, KPI determination, data processing, dashboard design, and evaluation. The selected KPIs include production achievement, productivity, defect rate, downtime, and Overall Equipment Effectiveness (OEE). Six-month simulated data are used to demonstrate the application of the method. The results show an average production achievement of 95.45%, productivity of 95.83%, defect rate of 2.02%, and OEE of 78.33%. The proposed dashboard presents key indicators, performance trends, target-versus-actual comparisons, defect Pareto analysis, and downtime information. The design provides a concise visualization of production conditions and supports data-driven decision making. The data in this study are simulated and can be replaced with actual company data without changing the methodological framework. Keywords: Automotive Industry, Dashboard, KPI, OEE, Production Performance

Filter by Year

2017 2026


Filter By Issues
All Issue Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri Vol. 10 No. 3 (2026): Industrika: Jurnal Ilmiah Teknik Industri Vol. 10 No. 2 (2026): Industrika: Jurnal Ilmiah Teknik Industri Vol. 10 No. 1 (2026): Industrika: Jurnal Ilmiah Teknik Industri Vol. 9 No. 4 (2025): Industrika: Jurnal Ilmiah Teknik Industri Vol. 9 No. 3 (2025): Industrika: Jurnal Ilmiah Teknik Industri Vol. 9 No. 2 (2025): Industrika: Jurnal Ilmiah Teknik Industri Vol. 9 No. 1 (2025): Industrika: Jurnal Ilmiah Teknik Industri Vol. 8 No. 4 (2024): Industrika: Jurnal Ilmiah Teknik Industri Vol. 8 No. 3 (2024): Industrika: Jurnal Ilmiah Teknik Industri Vol. 8 No. 2 (2024): Industrika: Jurnal Ilmiah Teknik Industri Vol. 8 No. 1 (2024): Industrika: Jurnal Ilmiah Teknik Industri Vol. 7 No. 3 (2023): Industrika: Jurnal Ilmiah Teknik Industri Vol. 7 No. 2 (2023): Industrika: Jurnal Ilmiah Teknik Industri Vol. 7 No. 1 (2023): Industrika: Jurnal Ilmiah Teknik Industri Vol. 6 No. 2 (2022): Industrika: Jurnal Ilmiah Teknik Industri Vol. 6 No. 1 (2022): Industrika: Jurnal Ilmiah Teknik Industri Vol. 5 No. 2 (2021): Industrika: Jurnal Ilmiah Teknik Industri Vol. 5 No. 1 (2021): Industrika: Jurnal Ilmiah Teknik Industri Vol. 4 No. 2 (2020): Industrika: Jurnal Ilmiah Teknik Industri Vol. 4 No. 1 (2020): Industrika: Jurnal Ilmiah Teknik Industri Vol. 3 No. 2 (2019): Industrika: Jurnal Ilmiah Teknik Industri Vol. 3 No. 1 (2019): Industrika: Jurnal Ilmiah Teknik Industri Vol. 2 No. 2 (2018): Industrika: Jurnal Ilmiah Teknik Industri Vol. 2 No. 1 (2018): Industrika: Jurnal Ilmiah Teknik Industri Vol. 1 No. 2 (2017): Industrika: Jurnal Ilmiah Teknik Industri Vol. 1 No. 1 (2017): Industrika: Jurnal Ilmiah Teknik Industri More Issue