cover
Contact Name
Jufriadif Na`am
Contact Email
jcivil@upiyptk.ac.id
Phone
+6287895670026
Journal Mail Official
jcivil@upiyptk.ac.id
Editorial Address
Kampus Universitas Putra Indonesia YPTK Padang Jl. Raya Lubuk Begalung Padang-25221
Location
Kota padang,
Sumatera barat
INDONESIA
Civil Engineering Collaboration
ISSN : 26155915     EISSN : 26155915     DOI : 10.35134/jcivil
Core Subject : Engineering,
Civil Engineering Collaboration is an open-access peer reviewed journal that mediate the result of study, research and development of science and technology in Civil Engineering with scope: 1. Civil and Structural Engineeering 2. Earthquake Engineering 3. Surveying and Geo-Spatial Engineering 4. Road and Bridge Engineering 5. Constructions Management 6. Geotechnical Engineering 7. Transportation Engineering 8. Water Resources Engineering 9. Building Constructions.
Articles 4 Documents
Search results for , issue "Vol. 9 (2024) No. 2" : 4 Documents clear
Perencanaan Geometri Jalur Kereta Api Kecepatan Tinggi Lintas Bandung Cirebon Fase II (Cimalaka-Ligung) KM 33+850 – KM 67+000 Aghasta, Adya; Yudha, Aldi Wardana
Civil Engineering Collaboration Vol. 9 (2024) No. 2
Publisher : Universitas Putra Indonesia YPTK Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35134/jcivil.v9i2.75

Abstract

This research delves into the meticulous geometry planning of the High-Speed Railway Track for the Bandung-Cirebon Phase III (Ligung-Tengahtani), spanning KM 67+000 to KM 100+685.72. In pursuit of engineering excellence, the study leverages cutting-edge Autocad Civil 3D, Global Mapper and ArcGIS Student technology and exhaustive field surveys to craft a track alignment that redefines speed and safety standards. The design intricately weaves together horizontal and vertical curves, superelevation, and gradient, ensuring the railway not only conquers the challenging terrain but also elevates the operational efficiency to unprecedented levels. This work sets a new benchmark in high-speed rail infrastructure, delivering a masterfully engineered blueprint that promises to revolutionize connectivity and economic growth in Indonesia.
Analisis Faktor yang Mempengaruhi Kinerja Pelaksanaan Proyek Terhadap Kualitas Konstruksi Jalan Nasional di Provinsi Sumatera Barat Rafki, Doni; Dwifitra Y. Jumas; Heldi
Civil Engineering Collaboration Vol. 9 (2024) No. 2
Publisher : Universitas Putra Indonesia YPTK Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35134/jcivil.v9i2.72

Abstract

Pemerintah Sumatra Barat telah melakukan pertumbuhan ekonomi nasional dan tercapainya konektivitas antar wilayah. Pemerintah telah menetapkan target pembangunan infrastruktur prioritas yang salah satunya adalah pembangunan infrastruktur jalan seperti distribusi dan logistik yang merupakan urat nadi kehidupan ekonomi, politik, sosial-budaya dan pertahanan keamanan nasional, serta penghubung antar daerah sebagaimana kondisi geografis Indonesia. Penelitian ini bertujuan untuk mengidentifikasi dan menganalisis faktor yang mempengaruhi kinerja pelaksanaan proyek konstruksi dan yang paling berpengaruh terhadap kualitas proyek konstruksi jalan nasional dan mengetahui strategi yang dapat dilakukan untuk meningkatkan kualitas proyek di Provinsi Sumatera Barat. Identifikasi dari 38 variabel dari 6 faktor terbukti bahwa 38 variabel dari 6 faktor tersebut merupakan faktor yang mempengaruhi kinerja pelaksanaan proyek konstruksi jalan dan faktor yang paling berpengaruh terhadap kualitas proyek konstruksi jalan nasional Provinsi Sumatera Barat. Dari hasil analisa yang telah dilakukan variabel kemampuan koordinasi/komunikasi SDM pada faktor Sumber Daya Manusia merupakan faktor yang mempengaruhi kinerja proyek konstruksi dan faktor bahan/material merupakan faktor yang paling berpengaruh secara signifikan terhadap kualitas hasil produk jalan nasional Provinsi Sumatera Barat. Pada analisis faktor berdasarkan output dari SPSS jika dirangkum berdasarkan nilai % of variance rotation sum of squared loading terdapat 13 komponen yang terbentuk dengan nilai masing – masing komponen adalah faktor 1 (satu) nilai % of variance yang dihasilkan adalah sebesar 22,806 %, faktor 2 (dua) 31,000%, faktor 3 (tiga) 37,652%, faktor 4 (empat) 43,078 %, faktor 5 (lima) 48,110%, dan 6 (enam) 52,709%, faktor 7 (tujuh) 56,629%, faktor 8 (delapan) 60,224%, faktor 9 (sembilan) 63,536%, faktor 10 (sepuluh) 66,574%, faktor 11 (sebelas) 69,241%, faktor 12 (duabelas) 71,825%, dan faktor 13 (tigabelas) 74,270%. Maka variabel yang mempengaruhi pelaksanaan proyek konstruksi jalan Provinsi Sumatera Barat adalah variabel kemampuan koordinasi/komunikasi SDM yang terlibat dalam pelaksanaan proyek konstruksi jalan dimana variabel ini termasuk pada faktor sumber daya manusia dengan nilai % of variance rotation sum of squared loading sebesar 74, 270%.
ANALISIS TINGKAT KEPUASAN PENGGUNA JASA KONSTRUKSI DENGAN MENGGUNAKAN METODE CUSTOMER SATISFACTION INDEX (CSI) DAN IMPORTANCE PERFORMANCE ANALYSIS (IPA): Submit Jurnal Willy Kurniawan Kurniawan, Willy; Deded Eka Sahputra; Kharisma Permata Sari; Maiyozzi Chairi
Civil Engineering Collaboration Vol. 9 (2024) No. 2
Publisher : Universitas Putra Indonesia YPTK Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35134/jcivil.v9i2.74

Abstract

Kualitas pelayanan merupakan aspek yang sangat pernting diperharikan untuk mempertahankan kosumen. PT. Konstruksi Indonesia Group tugasnya sebagai penyedia jasa di bidang konsruksi bangunan. Penelitian ini bertujuan untuk mengetahui tingkat kepuasan pengguna jasa terhadap penyedia jasa konstruksi dan Menentukan hal-hal yang menjadi prioritas perbaikan terhadap faktor–faktor yang mempengaruhi tingkat kepuasan pengguna jasa penelitian ini 15 variabel kepuasan pengguna jasa konstruksi dengan menggunakan metode Customer Satisfaction Index ( CSI ) dan diagram Importance Performance Analysis ( IPA ). Dari hasil analisis yang dilakukan menunjukan bahwa dari 15 variabel yang diajuka kepada 20 orang responden diperoleh nilai Customer Satisfaction Index (CSI) sebesar 77,53 % yang artinya pengguna jasa “puas” terhadap produk yang di hasilkan penyedia jasa, untuk kinerja dari pengguna jasa nilai Importance Performance Analysis ( IPA ) sebesar 4,45 hal tersebut dapat di katakan bahwa pengguna jasa konstruksi “Sangat Puas” terhadap Pelaksanaan pengawasan dan pengendalian mutu proyek secara terjadwal.
Evaluasi Efektivitas Manajemen Proyek Pemeliharaan Jalan: Studi Kasus HDM-4 Muaro Kalaban–Kiliranjao Putra Saira, Rehan; Royhan Mashuri Harahap, Ahmad; Syafri, Yuni Purnama; Midya Octavia, Dyla; Putri Zayu, Wiwin
Civil Engineering Collaboration Vol. 9 (2024) No. 2
Publisher : Universitas Putra Indonesia YPTK Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35134/jcivil.v9i2.85

Abstract

This study aims to evaluate the effectiveness of project management in national road maintenance activities based on the Highway Development and Management (HDM-4) model, using a case study of the Muaro Kalaban–Kiliranjao road section in West Sumatra Province, Indonesia. The research employs a descriptive-evaluative approach by analyzing five key elements of the Project Management Body of Knowledge (PMBOK): time, cost, quality, risk, and communication management. The data were obtained from project documentation, implementation reports, work schedules, and HDM-4 simulation outputs. The findings indicate that among the five evaluated aspects, three cost, risk, and communication are categorized as effective, while time and quality are considered moderately effective. A project delay of approximately 6% was caused by weather and logistical factors, whereas the International Roughness Index (IRI) value of 6.08 m/km remains within the acceptable technical limits of the Indonesian Highway Standard (Bina Marga). Overall, the project’s management effectiveness level reached about 80%, demonstrating that the integration of the PMBOK framework with HDM-4 analysis can improve project efficiency and economic outcomes. This research highlights the importance of structured communication systems and proactive risk mitigation strategies to enhance the performance of infrastructure projects, especially in geographically challenging areas.

Page 1 of 1 | Total Record : 4