PENILAIAN RISIKO KETERLAMBATAN PROYEK KONSTRUKSI (STUDI KASUS ; GEDUNG DPRD KABUPATEN PASAMAN) Sari, Kharisma Permata; Chairi, Maiyozzi; Trinanda, Asri Yuda; Agrival, Muhammad
JURNAL RIVET Vol 3 No 02 (2023): Desember 2023
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v3i02.1232

Abstract

Keterlambatan mempengaruhi aktivitas pekerjaan namun merupakan hal yang wajar terjadi selama pekerjaan konstruksi tetapi juga mempengaruhi durasi waktu penyelesaian pekerjaan secara keseluruhan. Penilitian ini bertujuan mengidentifikasi dan menilai risiko keterlambatan pada proyek Gedung DPRD Kabupaten Pasaman dan mengidentifikasi perencanaan risk respon terhadap risiko – risiko kritis yang ditemukan. Metode penilaian risiko menggunakan metode (Failure Mode Effect and Analysis) FMEA. Berdasarkan pengolahan data diperoleh 20 variabel yang termasuk risiko kritis yaitu, kekurangan tenaga kerja (105,98), kekurangan kedisiplinan tenaga kerja (123,12), keterlambatan pengiriman bahan (192,27), ketersediaan bahan terbatas di pasaran (131,17), kelangkaan material yang dibutuhkan (117,09), ketidak tepatan waktu pemesanan bahan dan material (95,94), tanggapan dari lingkungan sekitar proyek (158,6), karakter fisik bangunan sekitar proyek (109,13), kekurangan tempat penyimpanan bahan/material (104,07), kekurangan tempat pembuangan material (86,24), ketersediaan peralatan yang kurang (111,38), kerusakan peralatan (136,85), harga bahan/material yang mahal (137,61), kurang jelasnya design rekayasa perencanaan (117,93), intensitas curah hujan (344,91), cuaca yang berubah-ubah (436,08), faktor sosial budaya (217,03), kerusuhan (144,96), bencana alam (147,39), banyaknya pekerjaan tambahan (168,89)
ANALISIS PROYEK PEMBANGUNAN LABORATORIUM SENTRAL UNIVERSITAS ANDALAS DENGAN METODE CRITICAL PATH METHOD Auzan, Zulfakar; Desfita, Mediana; Nanda, Nanda; Sari, Kharisma Permata
JURNAL RIVET Vol 4 No 01 (2024): Juni 2024
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v4i01.1613

Abstract

CPM (Critical Path Method) is a method for determining the priority of activities that must receive careful supervision attention so that activities can be completed according to plan. The problem in this study is that there are several jobs that are delayed and must be accelerated. The purpose of this study is to find out the activities that are on the critical path and compare the initial time and cost of the project with the time and cost after using the CPM method. This research method uses a quantitative approach. The results of the discussion in this study indicate that the critical path obtained in the Andalas University Central Laboratory Development Project is in work with the code B - D - E - H - J - L - M - O - Q - R. After getting the work that is on the critical path, the acceleration time calculation is carried out by adding 1 hour of overtime, resulting in an additional cost of Rp 15,894,743, this causes a change in the value of the project cost which was initially Rp. 55,924,829,000 to Rp 55,940,723,743.
Analisa Perbandingan Rencana Mutu Kontrak (RMK) Antara Penyedia Jasa Dengan Standar Pekerjaan Umum Sari, Kharisma Permata; Chairi, Maiyozzi; Desfita, Mediana; Faismon4, Riki Hendra
JURNAL RIVET Vol 4 No 02 (2024): Desember 2024
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v4i02.1799

Abstract

One way that contractors or service providers do to provide satisfaction to customers or service users, by improving the quality of the services offered. One of the applications is to compare the Contract Quality Plan (RMK) Document implemented by contractors or service providers for the Solok City Hospital Development Advanced Project and the Marahadin Laing Football Field Construction Advanced Project. This research method is quantitative with a comparative method that compares two or more of a variable, situation, event, activity or in the form of similarities and differences in planning and implementation. Based on the evaluation of the completeness of the contents of the Contract Quality Plan (RMK) document, the total percent obtained from the evaluation of the completeness of the contents of the Contract Quality Plan Document (RMK) obtained from the Solok City Hospital Construction Continuation Project was 61.90% and the Marahadin Laing Football Field Construction Continuation Project was 54.76%. This assessment is carried out based on the completeness of the contents of the Contract Quality Plan Document which refers to the Contract Quality Plan Document (RMK) which regulates in the Regulation of the Minister of General Employment Number: 04/PRT/M/2009.
Analisis Penyebab Terjadinya Pekerjaan Repair pada PT. Lubuk Minturun Konstruksi Persada (PT. LMKP) Padang Sari, Kharisma Permata; Arman, Utami Dewi; Desfita, Mediana; Nasmirayanti, Rita
JURNAL RIVET Vol 5 No 01 (2025): Juni 2025
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/rivet.v5i01.2066

Abstract

This study aims to determine the factors that cause repair work. To find out the factors that cause the most dominant repair work and to find out how to minimize repair work at PT Lubuk Minturun Konstruksi Persada (PT.LMKP) Padang. The method used is SPSS (Statistical Product and Service Solutions). By circulating a questionnaire of 50 respondents. The results of data analysis concluded that the indicators causing repair work consisted of design and documentation totaling 6 indicators, planning and scheduling totaling 6 indicators, materials and equipment totaling 6 indicators, human resources totaling 6 indicators, leadership and documentation totaling 6 indicators. So the total is 28 indicators of the causes of repair work. The indicator that causes the most dominant repair work is the indicator that has the highest score, namely Design and Scheduling for indicator X2.5 “repair work causes inequality between architectural drawings and structural drawings / not according to drawings” with a total score of 229 and an average of 4.58, the most dominant factor causing repair work at PT Lubuk Minturun Konstruksi Persada (PT LMKP) Padang, Design and Scheduling and finding ways to minimize the occurrence of repair work.
GERAKAN PEDULI LINGKUNGAN DALAM KONSEP JAGA ALAM BERSAMA KPS PELANGI ALIRAN SUNGAI BATANG JIRAK MELALUI KEGIATAN PENANAMAN POHON Sari, Kharisma Permata; Sari, Afrilda; Arman, Utami Dewi; Arsyad, Nadra; Nasmirayanti, Rita; Leilany, Lili; Desfita, Mediana; Yetrina, Mutiara; Susriyati, Susriyati; Sepriana, Rina
Community Development Journal : Jurnal Pengabdian Masyarakat Vol. 6 No. 3 (2025): Volume 6 No 3 Tahun 2025
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/cdj.v6i3.47467

Abstract

Pentingnya peran masyarakat dalam menciptakan dan menjaga kelestarian sungai sangat berpengaruh baik terhadap lingkungan alam maupun pada kehidupan masyarakat. Diperlukan adanya kesadaran dari masyarakat terhadap masalah pencemaran sungai, menciptakan perilaku dan gerakan dari dalam diri masyarakat untuk berupaya sedemikian rupa melakukan konservasi sungai. Dalam upayanya melakukan konservasi sungai, masyarakat di wilayah bantaran aliran sungai Batang Jirak di Kecamatan Lubuk Begalung  yang tergabung dalam Komunitas Masyarakat Peduli Sungai Pelangi (KSP Pelangi) membentuk sebuah gerakan yang bertujuan untuk melakukan konservasi sungai dan menjaga kelestarian sungai, namun di sisi lain juga dapat dimanfaatkan sumber daya yang ada di sungai tersebut untuk kebutuhan masyarakat sekitar. Pada pelaksanaan kegiatan pengabdian kepada masyarakat tim dosen fakultas teknik UPI’YPTK’ Padang  ini digunakan metode pendekatan partisipatif Masyarakat melalui komunitas KSP Pelangi untuk melalukan diskusi proaktif dalam upaya peningkatan kesadaran penuh masyarakat terhadap lingkungan dan menganalisis potensi ekonomi dan juga pemanfaatan lainnya terhadap impact positif dari kegiatan peduli lingkungan.Dimulai dengan mensosialisasikan kepada masyarakat dan dan melakukan upaya konservasi sungai seperti pemanfaatan, perlindungan, dan pemeliharaan sungai secara berkala supaya sungai mampu sustainable di masa mendatang.
The Causal Factors of Building Construction Defects Arman, Utami Dewi; Melasari, Jihan; Sari, Afrilda; Sari, Kharisma Permata
CIVED Vol. 11 No. 1 (2024): March 2024
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/cived.v11i1.543

Abstract

Defects are something that must be identified in the implementation of quality management. Defects can potentially lead to construction failures and injury. This study aims to identify and analyse the causal factors of building construction defects based on the perspective’s project stakeholders. This research is quantitative-descriptive research conducted through questionnaires distributed to the purposive respondents. Then, conduct statistical analysis and evaluate the causal factors of construction defect using Failure Mode and Effect Analysis (FMEA). Based on the results, the critical causal factors of building construction defects are lack of communication within the project environment with a value of 33.6; poor performance of the project management team with a value of 30.3; improper design and specification with a value of 27.88; lack of supervision in the site with the value of 24.60 and lack of competency of the construction labour with the value of 23.04. Project stakeholders are expected to pay more attention to critical causal factors as preventive measures to prevent structural failure and injury.
PENGAPLIKASIAN STANDAR PEMASANGAN BAJA RINGAN UNTUK PEMBUATAN GUDANG Sari, Kharisma Permata; Sari, Afrilda; Arman, Utami Dewi; Arsyad, Nadra; Nasmirayanti, Rita; Asrianur, Arita; Leilany, Lili; Desfita, Mediana
Community Development Journal : Jurnal Pengabdian Masyarakat Vol. 5 No. 3 (2024): Volume 5 No. 3 Tahun 2024
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/cdj.v5i3.29880

Abstract

Pengaplikasian Baja ringan sekarang ini sudah seperti kayu, yang tidak hanya digunakan untuk pembuatan Rangka Atap saja. Penggunaan baja ringan kini telah menjadi sebuah tren tersendiri. Banyak produsen baja ringan yang tersedia. Namun terkadang akibat banyaknya produsen baja ringan, persaingan di pasar tidak seimbang. Misalnya, beberapa produsen yang menyediakan baja ringan dengan harga yang lebih murah, namun mutu bajanya dikurangi. Penyimpangan yang terjadi di industri baja ringan tidak sedikit mengakibatkan runtuhnya konstruksi yang menggunakan baja ringan. Kegagalan tersebut disebabkan oleh kegagalan sambungan, kegagalan elemen, dan kesalahan pengerjaan. Salah satu penyebab terjadinya kegagalan tersebut adalah karena belum adanya standar maupun prosedur khusus untuk baja ringan di Indonesia.