cover
Contact Name
Mahardika Darmawan Kusuma Wardana
Contact Email
p3i@umsida.ac.id
Phone
+6285646424525
Journal Mail Official
p3i@umsida.ac.id
Editorial Address
Universitas Muhammadiyah Sidoarjo, Jl. Majapahit 666 B, Sidoarjo, East Java Indonesia
Location
Kab. sidoarjo,
Jawa timur
INDONESIA
PELS (Procedia of Engineering and Life Science)
ISSN : -     EISSN : 28072243     DOI : https://doi.org/10.21070/pels
PELS (Procedia of Engineering and Life Science) is an international journal published by Faculty of Science and Technology Universitas Muhammadiyah Sidoarjo. The research article submitted to this online journal will be double blind peer-reviewed (Both reviewer and author remain anonymous to each other). The accepted research articles will be available online following the journal peer-reviewing process. Language used in this journal is Bahasa (Indonesia) or English. Aims and Scope of this journal is science and technology.
Articles 887 Documents
Analysis of Daily Progress Reports as a Schedule Control Tool for the Revitalization Project of Playground Construction: Analisis Laporan Progres Harian sebagai Alat Kontrol Jadwal Proyek Revitalisasi Pembangunan Area Bermain Sherly Oktavia; Muhammad Alvan Rizki
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/7jzx5w11

Abstract

General Background Timely completion remains a fundamental parameter for construction project success, particularly for educational facilities closely tied to academic calendars, such as the playground revitalization project at TK Dharma Wanita Kwatu. Specific Background Construction progress often encounters technical and non-technical obstacles that risk scheduling delays, primarily due to execution within active school environments. Knowledge Gap Although daily logs are frequently perceived as mere administrative formalities, utilizing detailed monitoring instruments is essential to systematically detect and mitigate schedule deviations. Aims This study aims to analyze the effectiveness of Daily Progress Reports (DPR) as a schedule control instrument implemented by CV Gapura Agung. Results Consistent utilization of daily reports allows management to identify delays early, adjust resource allocation, and successfully maintain cumulative progress targets despite weather constraints. Novelty The integration of daily progress tabular tracking with S-Curve scheduling provides a robust framework for schedule control in educational construction projects. Implications These administrative and field controls guarantee transparency, efficiency, and the timely completion of construction projects adhering to established quality standards. Key Findings Highlights Daily progress logs function effectively as an early warning system to detect schedule deviations caused by external factors such as rain. S-Curve analysis reveals a normal project progression pattern, characterized by steady initial phases, accelerated main construction, and a tapering finish. Integrating daily reports with master scheduling significantly enhances proactive decision-making and overall project time control. Keywords Daily Report, Schedule Control, Construction, Revitalization, CV Gapura Agung
Design of a Company Profile Website for PT Baba Rafi Enterprise Based on WordPress as a Digital Promotion Medium : Perancangan Website Company Profile PT Baba Rafi Enterprise Berbasis WordPress sebagai Media Promosi Digital Kautsar Nafis Kuncoro
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/y6qqcz30

Abstract

General Background Digital transformation pushes companies to utilize internet potential as an effective promotional media, where a professional company profile website acts as an essential digital storefront to boost credibility and market reach. Specific Background PT Baba Rafi Enterprise, a prominent international culinary franchise originating from Indonesia, requires a comprehensive digital presence to maintain its high market competitiveness. Knowledge Gap Many culinary enterprises face challenges in establishing adaptive, responsive, and SEO-optimized web interfaces that effectively reflect business identity without complex programming. Aims This study focuses on the design and implementation of a company profile website for PT Baba Rafi Enterprise using WordPress and the Agile Development methodology to elevate digital competitiveness in the MSME sector. Results The implemented system successfully presents professional corporate information, responsive navigation, integrated contact forms, and improved search engine visibility. Novelty The integration of WordPress CMS, Elementor visual page builder, and Yoast SEO optimization within an Agile framework provides a streamlined web development model for franchise business profiles. Implications These digital enhancements strengthen brand image, expand market outreach, and sustain long-term marketing strategies for PT Baba Rafi Enterprise. Key Findings Highlights Agile development methodology enables flexible and adaptive requirement analysis and iterative web layout implementation for corporate profiles. WordPress platform integration supported by Elementor page builder creates a responsive, highly accessible interface without complex coding barriers. Search Engine Optimization strategies successfully increase visitor traffic and brand visibility through enhanced Google search rankings. Keywords Website, WordPress, Elementor, Seo, Digital Competitiveness
Utilization of Google Maps as a Basis for Creating Site Plans Using AutoCAD for Repair Work on Lombok Road and Sumbawa Road, Cakung Area, East Jakarta: Pemanfaatan Google Maps sebagai Dasar Pembuatan Denah Lokasi Menggunakan AutoCAD untuk Pekerjaan Perbaikan di Jalan Lombok dan Jalan Sumbawa, Kawasan Cakung, Jakarta Timur Kevin Rahmaddian Mardiyanto; Hendri Hermawan
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/4ascz737

Abstract

General Background In road improvement projects, site plan preparation serves as a critical foundation for technical planning and field implementation. Specific Background Conventional site plan creation through direct field surveys demands substantial time, labor, and financial resources, particularly in congested urban environments. Knowledge Gap The reliability and efficiency of utilizing digital mapping technologies like Google Maps as preliminary data sources for detailed AutoCAD drafting require comprehensive evaluation. Aims This study aims to examine the utilization of Google Maps as a basis for site plan preparation using AutoCAD in road repair works along Lombok Road and Sumbawa Road in the Cakung area. Results The integration of Google Maps and AutoCAD successfully represents existing road geometries, widths, and surroundings, thereby optimizing preliminary planning efficiency. Novelty The systematic workflow merging open-access satellite imagery with computer-aided drafting provides an accelerated pre-design framework for urban road infrastructure. Implications While this method reduces preliminary survey dependence, direct field measurements remain indispensable for high-accuracy construction detailing. Key Findings Highlights Google Maps efficiently provides preliminary spatial data for representing existing road alignments, layouts, and urban environments. Integrating satellite imagery with AutoCAD drafting significantly accelerates preliminary project planning and reduces initial survey requirements. Direct field measurements are still essential for final construction stages due to spatial resolution limitations in digital maps. Keywords Google Maps, Site Plan, Autocad, Road Improvement, Road Planning
Analysis Problem Analysis During Sewing Machine Production: Analisis Permasalahan Saat Mesin Jahit Berproduksi di PT Aggio Multimex Bagus Dwi Anggoro
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/w9sb7552

Abstract

General Background Modern engineering and academic research heavily rely on systematic data analysis, structured methodologies, and interdisciplinary technological integration to solve complex operational challenges. Specific Background In many technical disciplines, inadequate procedural frameworks and lack of structured evaluation tools often lead to inefficiencies, recurring errors, and suboptimal performance. Knowledge Gap Existing literature lacks comprehensive synthesis regarding the integration of advanced diagnostic frameworks, digital tools, and standardized performance metrics within practical engineering environments. Aims This study aims to evaluate methodological frameworks, analyze operational variables, and propose structured optimization strategies to enhance overall system reliability and performance. Results Findings demonstrate that systematic monitoring, rigorous data analysis, and standardized procedural controls significantly reduce operational errors, improve workflow efficiency, and ensure higher quality standards. Novelty The integration of multidisciplinary analytical models with empirical field verification establishes a robust, reproducible framework for technical problem-solving. Implications These insights provide actionable guidelines for researchers and practitioners to optimize operational workflows and enhance long-term asset reliability across industrial and academic sectors. Key Findings Highlights Systematic procedural controls effectively identify and mitigate operational inefficiencies in complex engineering environments. Integrating quantitative data analysis with structured methodological frameworks significantly improves system reliability and accuracy. Standardized evaluation protocols ensure consistent performance outcomes and facilitate continuous operational improvement. Keywords Methodological Framework, Performance Optimization, System Reliability, Operational Efficiency, Technical Evaluation  
Analysis of Problems in Basic Sewing Machine Settings: A Case Study on Needle Shaft and V-Belt Adjustment Errors: Analisis Permasalahan pada Setting Dasar Mesin Jahit: Studi Kasus pada Kesalahan Setting As Jarum dan Vanbelt Ananda Ari Yudhistira; Prantasi Harmi Tjahjanti
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/qs571h36

Abstract

General Background Basic setting errors in sewing machines represent major factors affecting stitch quality and production efficiency in garment manufacturing. Specific Background The Mitsubishi Electric LY2-3300-B0B heavy-duty single-needle lockstitch machine operates under high-load conditions where component alignment and maintenance are critical. Knowledge Gap Detailed troubleshooting protocols regarding needle shaft alignment and v-belt adjustments require systematic evaluation to prevent common mechanical failures. Aims This study analyzes common problems occurring in the basic setting process of industrial sewing machines, focusing specifically on needle shaft and v-belt adjustments. Results Improper needle shaft alignment causes needles to deviate from rotary hooks resulting in thread breakage, while misaligned v-belts lead to unstable operations. Novelty The integration of direct daily maintenance observations with structured component troubleshooting frameworks for heavy-duty industrial sewing machines. Implications These technical findings serve as practical reference guidelines for technicians and garment industry practitioners to maintain machine reliability. Key Findings Highlights Improper needle shaft alignment frequently causes needle deviation from the rotary hook, resulting in frequent thread breakage. Loose or misaligned v-belts directly cause unstable machine operation during heavy-duty sewing processes. Standardized resetting procedures and regular component tension checks effectively restore optimal machine performance. Keywords Sewing Machine, Basic Setting, Needle Shaft, V-Belt, Maintenance
A Review of Excavation and Foundation Work Implementation in the Construction Project of TK Dharma Wanita Kwatu, Mojoanyar District, Mojokerto Regency: Tinjauan Pelaksanaan Pekerjaan Galian dan Pondasi pada Proyek Pembangunan TK Dharma Wanita Kwatu, Kecamatan Mojoanyar, Kabupaten Mojokerto Kusuma Dwi Nugroho; Hendri Hermawan
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pyjjx394

Abstract

General Background Excavation and foundation works represent crucial initial stages that guarantee the structural stability of buildings, particularly in school construction projects requiring high levels of safety and long-term durability. Specific Background The construction project of TK Dharma Wanita Kwatu in Mojoanyar District, Mojokerto Regency executed by CV Gapura Agung demands strict compliance with technical specifications and structural drawings. KnowledgeGap Comprehensive technical reviews evaluating excavation dimensions, foundation elevations, reinforcement placement, and concrete quality against architectural specifications remain necessary for educational facility developments. Aims This study aims to review the technical implementation of excavation and foundation works in the school construction project of TK Dharma Wanita Kwatu. Results Field evaluations indicate that excavation dimensions, foundation elevations, and concrete slump test results successfully meet technical standards and structural planning requirements. Novelty The systematic synthesis of direct field observations, structural working drawings, and RKS specification evaluations for school sub-structure implementations. Implications These findings ensure that sub-structure execution fulfills technical, quality, and occupational safety requirements, thereby supporting overall building stability. Key Findings Highlights Excavation dimensions, foundation elevations, and reinforcement installations comply fully with structural working drawings and designs. Concrete quality testing utilizing slump tests successfully satisfies required technical standards and specifications. Effective field supervision successfully addresses local site constraints and soil condition adjustments during execution. Keywords Excavation Works, Foundation, School Construction, Structural Quality, Field Supervision
Renovation Work of Roof and Ceiling Structures at SMPN 1 Tulangan and SDN Masangan Wetan, Sidoarjo Regency: Laporan Magang Pekerjaan Renovasi Atap dan Plafon di SMPN 1 Tulangan dan SDN Masangan Wetan di Kabupaten Sidoarjo Yan Syahrial Tyas Ekarosa
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/75rehk08

Abstract

General Background Roof and ceiling systems serve vital functions in ensuring the safety, comfort, and structural durability of educational buildings. Specific Background Several school buildings in Sidoarjo Regency experience structural deterioration and leakages due to aging materials, harsh weather exposure, and insufficient maintenance. Knowledge Gap Comprehensive empirical assessments regarding the comparative performance and maintenance efficiency of lightweight steel framing combined with polyvinyl chloride ceiling installations in school renovations require further documentation. Aims This article aims to describe the implementation of roof and ceiling renovation works at SMPN 1 Tulangan and SDN Masangan Wetan in Sidoarjo Regency executed under CV. Rifat Putra Jaya. Results The renovation activities successfully replaced damaged wooden frameworks and leaking ceilings with lightweight steel structures and moisture-resistant polyvinyl chloride panels. Novelty The systematic field integration of modern polyvinyl chloride ceiling applications within municipal educational facility structural rehabilitation. Implications These renovation techniques significantly improve building durability, visual comfort, and long-term maintenance efficiency for public educational infrastructure. Key Findings Highlights Lightweight steel roof framing effectively replaces deteriorated wooden structures to restore structural integrity and weather resistance. Polyvinyl chloride ceiling panels provide superior moisture resistance, durability, and reduced maintenance requirements compared to conventional materials. Rigorous site supervision and structured planning ensure successful project delivery despite environmental and logistical constraints. Keywords Roof Renovation, Pvc Ceiling, School Building, Internship Report, Construction Work
Analysis Of Measurement Erors In Turning Process: Analisis Kesalahan Pengukuran Pada Proses Pembubutan Much Rafli Firjatulloh; Prantasi Harmi Tjahjanti
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/0zddx396

Abstract

General Background Precise dimensional measurement during turning operations remains vital for product quality and manufacturing efficiency. Specific Background In accurate component fabrication, physical measurement deviations and technical media reporting errors frequently lead to rejected parts, material waste, and miscommunicated operational guidelines. Knowledge Gap Although technical causes of dimensional variations are widely studied, comprehensive evaluations integrating industrial measurement deviations with linguistic spelling errors in manufacturing news reports are rarely reported together. Aims This study analyzes the specific factors causing dimensional measurement errors in turning processes while evaluating spelling inaccuracies found in online manufacturing industry news. Results Categorical analysis indicates that dimensional errors predominantly stem from uncalibrated instruments, unstandardized measurement techniques, operator scale-reading errors, and environmental shifts in temperature or vibration, while textual evaluation reveals frequent non-standard technical terms, incorrect capitalization, and morphological spelling errors. Novelty A dual-analytical approach is established by systematically combining physical machining error factors with linguistic accuracy assessments in technical reporting. Implications Improving production quality requires simultaneous adoption of strict metrological standards, regular instrument calibration, operator training, and rigorous linguistic accuracy in industrial technical communications. Key Findings Highlights Dimensional deviations in turning stem from combined instrument, operator, environmental, and methodological errors. Online technical media frequent spelling mistakes that risk confusing standard machining and measurement procedures. Manufacturing quality control demands strict calibration alongside clear, accurate linguistic reporting standards. Keywords Turning Process, Dimensional Measurement, Measurement Error, Industrial Metrology, Technical Communication
Pikachu Modular Chair Factory Layout: Layout Pabrik Kursi Modular Pikachu Muhammad Rangga Eka Mukti; Mohammad Nabil Makarim; David Aditya Pratama; Satriya Surya Nugraha; Muhammad Angga Yudhistira; Athika Shidi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/rzynvb30

Abstract

General Background The optimal layout design of a production facility remains crucial to ensuring smooth manufacturing operations and maintaining operational efficiency. Specific Background In the practical design of facilities for manufacturing a Pikachu-themed modular chair, integrating ergonomics, smooth material flow, and interdepartmental activity interactions is essential. Knowledge Gap Although traditional layout planning addresses material transport, comprehensive integration combining multi-product process charts, activity relationship analysis, from-to charts, and computerized heuristic algorithms like Blocplan requires systematic evaluation. Aims This study aims to design and optimize the production facility layout for manufacturing a modular chair by utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), From-To Chart (FTC), and Blocplan algorithm. Results The results indicate that the proposed layout significantly improves material flow, optimizes interdepartmental relationships, and minimizes material handling distances and costs by strategically positioning raw material warehouses near measurement, cutting, and assembly areas. Novelty A structured framework is established by synthesizing MPPC, ARC, FTC, and Blocplan computer-aided heuristics specifically for modular furniture manufacturing layouts. Implications Implementing this optimized layout effectively supports manufacturing efficiency, operational productivity, and workflow continuity in industrial facility design. Key Findings Highlights Integrating multi-product process mapping with activity relationship charts successfully reorganizes modular furniture production workflows. Computer-aided Blocplan optimization identifies superior layout alternatives that drastically reduce material handling costs and distances. Placing raw material warehouses adjacent to measurement and assembly departments eliminates unnecessary transportation bottlenecks. Keywords Facility layout design, Modular chair, Material handling, Blocplan, Ergonomics
Repair of Mechanical Trouble on Tilter Machine: Perbaikan Trouble Mekanis pada Mesin Tilter Angger Seta Pandega; Mulyadi
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/yt8b3z19

Abstract

General Background The pallet tilter machine serves as a critical support device in the manufacturing industry for tilting or inverting pallets to optimize material handling efficiency and operational ergonomics. Specific Background An electronic manufacturing company utilizes a pallet tilter machine in its final assembly area, yet frequent mechanical jams during operation lead to elevated downtime and diminished production efficiency. Knowledge Gap Although mechanical troubles frequently disrupt tilter operations, comprehensive investigations integrating direct diagnostic observations, bearing replacement, and guide plate fabrication are rarely documented together. Aims This study aims to identify the root causes of mechanical troubles in the pallet tilter machine and to design appropriate corrective solutions for performance optimization. Results Findings indicate that operational jamming stems primarily from worn bearings, debris accumulation, inadequate lubrication, and guide plate misalignment that disrupts smooth pallet entry into the bearing path. Novelty A targeted mechanical restoration approach is established by combining bearing replacement and guide plate reconfiguration with structured preventive maintenance routines. Implications Implementing these corrective solutions successfully restores smooth pallet movement, reduces mechanical failures, and enhances the operational stability of industrial tilter equipment. Key Findings Highlights Worn bearings and misaligned guide plates are the primary triggers for mechanical jamming in production line pallet tilters. Replacing damaged components and integrating custom guide plates effectively restores seamless and stable pallet transfers. Establishing routine preventive maintenance procedures prevents recurring component degradation and maximizes operational efficiency. Keywords Tilter machine, Pallet tilter, Bearing, Preventive maintenance, Production efficiency