cover
Contact Name
Mahardika Darmawan Kusuma Wardana
Contact Email
p3i@umsida.ac.id
Phone
+6285646424525
Journal Mail Official
p3i@umsida.ac.id
Editorial Address
Universitas Muhammadiyah Sidoarjo, Jl. Majapahit 666 B, Sidoarjo, East Java Indonesia
Location
Kab. sidoarjo,
Jawa timur
INDONESIA
PELS (Procedia of Engineering and Life Science)
ISSN : -     EISSN : 28072243     DOI : https://doi.org/10.21070/pels
PELS (Procedia of Engineering and Life Science) is an international journal published by Faculty of Science and Technology Universitas Muhammadiyah Sidoarjo. The research article submitted to this online journal will be double blind peer-reviewed (Both reviewer and author remain anonymous to each other). The accepted research articles will be available online following the journal peer-reviewing process. Language used in this journal is Bahasa (Indonesia) or English. Aims and Scope of this journal is science and technology.
Articles 887 Documents
Tayo Bus Modular Chair Factory Layout Design: Perancangan Tata Letak Pabrik Kursi Modular Bus Tayo Dwi Maulana; M. Arya Adi Pratama; Raihan Bagas Eka S.; Farichul Mukodam; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pbvw4547

Abstract

General Background: Facility layout design represents a critical operational mechanism in manufacturing industries to streamline internal workflows and optimize facility organization. Specific Background: Manufacturing facilities frequently encounter long material transfer distances and poorly structured production layouts that hinder productivity and inflate handling costs. Knowledge Gap: Traditional initial factory floor configurations often lack integrated qualitative and quantitative evaluations combining routing analyses with automated layout generation tools. Aims: This study designs an optimal production facility layout at the Tayo Modular Bus Seat Factory to enhance material flow efficiency and reduce material handling costs. Results: Utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), From-To Chart, and Blocplan algorithm, the analysis indicates a total initial material transfer volume of 2,310 units with costs reaching Rp2,342,937, successfully yielding an optimized layout alternative with a top adjusted adjacency score of 0.92. Novelty: This research establishes an integrated layout planning framework combining MPPC, ARC, ARD, From-To Chart, and Blocplan algorithms specifically tailored for modular wooden chair assembly lines. Implications: Implementing this optimized layout configuration enables industrial managers to significantly improve departmental proximity, shorten transfer distances, and elevate overall manufacturing productivity. Key Findings Highlights The initial From-To Chart evaluation reveals a total material transfer volume of 2,310 units resulting in cumulative material handling costs of Rp2,342,937. Blocplan algorithm simulation generates ten layout alternatives, identifying layout option number one as the optimal design with an adjusted evaluation score of 0.92. The proposed facility redesign successfully improves interdepartmental proximity and shortens material transport distances to ensure smooth modular chair production workflows. Keywords Modular Chair, Material Handling, Arc, From to Chart, Blocplan
Work Productivity Analysis Using the Work Sampling Method on Crane Operators at Sugar Factory: Analisis Produktivitas Kerja Menggunakan Metode Work Sampling pada Operator Crane Pabrik Gula Fadillah; Hana Catur Wahyuni
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/6c6z9a49

Abstract

General Background: Sugar manufacturing serves as a strategic industrial sector in national food security, where production continuity depends heavily on material handling efficiency. Specific Background: Crane operators play a vital role in maintaining material flows across sugar factory workstations, yet performance variations often introduce operational delays and productivity losses. Knowledge Gap: Prior facility assessments frequently lack structured work measurement frameworks to quantify productive proportions, idle time, and operator workload disparities under actual factory operating conditions. Aims: This research evaluates the productivity performance of crane operators at a sugar factory using the work sampling method. Results: Periodic observations over a twelve-day period indicate that the first operator achieved a productivity level of 59%, while the second operator recorded 72%, with differences attributed to workload distribution, waiting duration, and equipment operation efficiency. Novelty: This study establishes an empirical work sampling and standard time evaluation model specifically designed for heavy material handling operations in sugar manufacturing plants. Implications: Implementing workflow improvements and workload balancing based on these findings enables industrial management to elevate crane operational effectiveness and overall production efficiency. Key Findings Highlights Work sampling observations over 12 days reveal that crane operators achieve productivity levels ranging between 59% and 73% during material handling operations. Statistical control limit evaluations confirm that operational productivity data remain within acceptable control bounds despite variations in worker idle time. Standard time and work allowance calculations demonstrate that higher operator productivity directly correlates with more efficient task execution and reduced operational downtime. Keywords Productivity Analysis, Work Sampling, Standard Time, Sugar Industry
Elephant Modular Chair Factory Layout: Layout Pabrik Kursi Modular Gajah Akbar El Sapta; Aji Damar Pamungkas; Mochammad Gilang Romadlon; Rendi Wili Wijaksono; Bilqis Sabrina Anggrayni; Athika Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/shjb5g59

Abstract

General Background: Facility layout optimization represents a critical operational requirement for modern manufacturing industries aiming to streamline material flow and minimize unnecessary internal movements. Specific Background: Manufacturing facilities frequently encounter inefficient departmental proximities and long material transfer distances that hinder overall productivity and inflate operational expenditures. Knowledge Gap: Traditional initial factory arrangements often fail to integrate comprehensive qualitative relationship evaluations with quantitative movement and machine requirement analyses, leading to sub-optimal workflow configurations. Aims: This study evaluates and redesigns the production facility layout of the Gajah Modular Chair factory to optimize material movement efficiency and minimize internal transfer costs. Results: Utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), From To Chart, and Blocplan methods, the proposed layout successfully achieves superior departmental proximity and shorter transfer distances compared to the initial configuration, culminating in an optimized layout with an adjusted score of 0.93. Novelty: This research establishes a hybrid analytical framework integrating MPPC, ARC, and Blocplan algorithms specifically tailored for modular wooden furniture assembly lines. Implications: Implementing the redesigned layout configuration enables industrial managers to significantly enhance production throughput, eliminate back-tracking delays, and reduce material handling expenses. Key Findings Highlights Integration of MPPC, ARC, and From To Chart methodologies successfully identifies structural bottlenecks and excessive material transfer distances in the initial factory layout. Blocplan alternative generation yields ten distinct layout configurations, identifying layout alternative number two as the optimal design with an adjusted score of 0.93. The proposed facility redesign significantly improves interdepartmental proximity and streamlines material handling operations to elevate overall manufacturing productivity. Keywords Facility Layout, Material Handling, Arc, From To Chart, Blocplan  
Design and Installation of a 16-Channel CCTV System to Improve Security in an Industrial Environment: Perancangan dan Instalasi Sistem CCTV 16 Channel untuk Meningkatkan Keamanan di Lingkungan Pabrik Recky Fernanda Dwi Raditya; Uce Indahyanti
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/2029kw53

Abstract

General Background Security monitoring in industrial settings requires continuous observation to protect operational assets and maintain workplace safety. Specific Background Manufacturing plants with sustained production lines, workforce movement, and material distribution rely on closed-circuit television (CCTV) and multi-channel digital video recorders (DVRs) for centralized visual supervision. Knowledge Gap Practical field documentation detailing end-to-end hardware selection, physical installation, and DVR configuration within an active footwear manufacturing facility during technical internship work remains limited. Aims This study documents the design, deployment, and functional testing of a 16-channel CCTV system in a footwear manufacturing plant and evaluates its operational monitoring performance. Results All deployed cameras operated reliably across strategic factory zones, providing real-time live viewing, stable time-indexed video playback, and streamlined camera status management through the DVR interface. Novelty The work presents a direct field-based implementation workflow from IT Support practice covering coaxial and power cabling, BNC and RJ45 terminations, server-room DVR integration, and channel/recording configuration in a shoe manufacturing environment. Implications The deployment offers a practical reference for technicians and industrial operators seeking centralized visual oversight, with future potential for cloud storage, higher video quality, and broader security system integration. Key Findings Highlights All deployed cameras monitor strategic factory areas and display live video streams through the central DVR interface. Video recording functions stably and supports time- and channel-based playback retrieval without notable disruptions. Device management features verify camera connectivity and channel settings to support routine maintenance. Keywords Surveillance Monitoring, Factory Safety, Digital Video Recorder, Coaxial Cabling, Video Playback
The Backend of the Prospective Student Indent System for PPDB SD Muhammadiyah 1 Candi: Sistem Backend Indentasi Calon Siswa PPDB SD Muhammadiyah 1 Candi Novan Indwiarsono; Mochamad Alfan Rosid
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/fyjsqw98

Abstract

General Background: Digital transformation has become a strategic necessity in educational administration, particularly for elementary school student enrollment workflows. Specific Background: New Student Admissions (PPDB) represents a critical administrative phase, yet preliminary prospective student indent processes are frequently handled through manual paper forms and messaging applications. Knowledge Gap: Existing literature and implementations often overlook systematic indent management, leading to data irregularities, duplication, and recapitulation barriers. Aims: This article discusses the frontend and backend web development of a prospective student indent system for PPDB at SD Muhammadiyah 1 Candi. Results: The developed web system successfully streamlines operations using HTML, CSS, Bootstrap, and JavaScript for the frontend and PHP with MySQL for the backend, eliminating manual data entry, improving data accuracy, and providing automated registration receipts and administrative listings. Novelty: This study introduces an integrated web-based architecture combining a responsive user interface with robust backend validation specifically tailored for preliminary student indent tracking in elementary schools. Implications: Implementing this digital solution significantly elevates administrative efficiency, data integrity, and overall service quality for educational institutions. Key Findings Highlights Web-based software engineering successfully replaces manual paper forms and messaging apps with an integrated database system. The combination of HTML, Bootstrap, PHP, and MySQL delivers a responsive interface and reliable data storage for administrative workflows. Automated indent features and real-time latest registrant tracking eliminate administrative data duplication and reduce processing time. Keywords Ppdb System, Indent System, Frontend, Backend, Educational Technology
Comparative Analysis of Construction Cost Estimates Using SNI and AHSP Methods for the Elevator Shaft Project at RSUD Pindad Turen, Malang Regency: Perbandingan Rencana Anggaran Biaya Metode SNI dan AHSP pada Proyek Ruang Luncur Elevator RSUD Pindad Turen, Kabupaten Malang Salsabila Bintang Kirana; Budwi Harsono
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/taezj579

Abstract

General Background: Construction cost estimation serves as a fundamental instrument in project budgeting and financial planning for building infrastructure. Specific Background: Preparing a reliable Cost Budget Plan (Rencana Anggaran Biaya) requires accurate unit price analyses derived from material, labor, and equipment coefficients, primarily governed in Indonesia by the Indonesian National Standard (SNI) and the Unit Price Analysis (AHSP) frameworks. Knowledge Gap: Variations in labor and material index coefficients across regulatory standards frequently yield substantial discrepancies in total project valuation, necessitating direct empirical evaluation on specific structural typologies such as multi-story hospital elevator shafts. Aims: This study compares construction cost estimates calculated using the SNI 2008 and AHSP 2023 methods for the three-story elevator shaft substructure project at RSUD Pindad Turen, Malang Regency. Results: Quantitative calculations based on working drawings, work volumes, and 2025 Malang Regency wage and material rates reveal that the AHSP 2023 method generates a total physical construction cost of IDR 356,370,000, whereas the SNI 2008 method yields IDR 552,075,000, demonstrating a cost difference of IDR 195,705,000 or 35% due to lower labor and material coefficients in AHSP 2023. Novelty: This research provides a direct comparative benchmark applying updated SE Menteri PUPR 2023 coefficients against SNI 7394:2008 specifically for reinforced concrete hospital elevator shaft substructures. Implications: Selecting the AHSP 2023 framework enables project owners and contractors to establish more economical, realistic, and accountable budget allocations for vertical transportation infrastructure. Key Findings Highlights Unit price analysis using AHSP 2023 produces an economical budget of IDR 356,370,000 compared to IDR 552,075,000 under SNI 2008. Variations in labor and material index coefficients generate a total budget discrepancy of IDR 195,705,000 or 35% between the two calculation standards. Reinforced concrete structural work dominates expenditure in both budgeting standards, with lower worker and material indices in AHSP 2023 driving overall cost efficiency. Keywords Construction Cost Estimation, Unit Price Analysis, Reinforced Concrete Structure, Budget Plan Comparison, Vertical Transportation Infrastructure  
Study on the Evaluation of Construction Work Implementation at the De Garden Bojonegoro – Kapas Housing Project, Bojonegoro Regency: Studi Evaluasi Pelaksanaan Pekerjaan Konstruksi Bangunan pada Proyek Perumahan De Garden Bojonegoro – Kapas, Kabupaten Bojonegoro Lutfi Icbal Maulana; Budwi Harsono
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/vefs7170

Abstract

General Background: Information technology development encourages business owners to transition from manual cash register systems toward efficient digital platforms. Specific Background: Conventional cashier workflows frequently trigger service delays, recording errors, and monitoring difficulties for retail businesses. Knowledge Gap: Prior studies often lack an integrated web architecture combining structured Laravel frameworks with dynamic QR code scanning for order verification. Aims: This research aims to develop a Laravel-based cashier web application equipped with a QR code scanning feature for order identification and digital receipts. Results: Testing confirms that all primary functions execute correctly, automatically generating QR codes, enabling cashier scanning, updating order statuses in real time, and producing consistent sales reports. Novelty: This work establishes a structured point-of-sale framework integrating modified Waterfall methodologies with dynamic QR-code-driven digital receipt verification. Implications: Implementing this cashier application eliminates manual recording bottlenecks, reduces customer queue times, and optimizes financial reporting for retail stores. Key Findings Highlights Demonstrating that integrating Laravel frameworks with dynamic QR code generation successfully automates order identification and digital receipt verification, Establishing a structured web-based cashier workflow that updates order statuses in real time and eliminates traditional manual recording bottlenecks, Providing retail businesses with reliable daily, monthly, and yearly sales reporting features to optimize financial evaluation and operational management. Keywords Web-based cashier, Laravel, QR Code, QR scanning, Order identification
Development of a Web-Based Cashier Application with QR Code Scanning Features Using the Waterfall Method as a Transaction Identification Medium: Pengembangan Aplikasi Kasir Berbasis Web dengan Fitur Pemindaian QR Code Menggunakan Metode Waterfall sebagai Media Identifikasi Transaksi Ramadhan Maulana; Muhammad Rafly Rayhan Maulana; Muhammad Eka Febrian; Yunianita Rahmawati
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/5mnhrr40

Abstract

General Background: Information technology advancement drives business owners to transition from manual cash register systems toward digital platforms that ensure higher operational efficiency and data accuracy. Specific Background: Conventional cashier mechanisms frequently suffer from service delays, transaction recording errors, and monitoring difficulties for retail businesses such as Kedai 7 Boelan. Knowledge Gap: Existing approaches often lack an integrated web-based architecture combining dynamic Laravel frameworks with real-time QR code scanning for order identification. Aims: This research aims to develop a Laravel-based cashier web application equipped with a QR code scanning feature for order identification and digital receipts. Results: Testing confirms that all primary system functions execute correctly, automatically generating QR codes during menu ordering, allowing seamless cashier scanning, updating order statuses in real time, and maintaining consistent sales reports. Novelty: This work establishes a structured web-based point-of-sale architecture integrating modified Waterfall methodologies with dynamic QR-code-driven digital receipt verification. Implications: Implementing this digital cashier application eliminates manual recording bottlenecks, reduces customer queue times, and optimizes financial report monitoring for retail establishments. Key Findings Highlights Demonstrating that integrating Laravel frameworks with dynamic QR code generation successfully automates order identification and digital receipt verification, Establishing a structured web-based cashier workflow that updates order statuses in real time and eliminates traditional manual recording bottlenecks, Providing retail businesses with reliable daily, monthly, and yearly sales reporting features to optimize financial evaluation and operational management. Keywords Web-based cashier, Laravel, QR Code, QR scanning, Order identification
Implementation Of Intelligent Chatbots Using Webhook Methods And Google Gemini ApiFor Virtual Customer Assistants: Implementasi Chatbot Cerdas Menggunakan Metode Webhook Dan Api Google Gemini Untuk Asisten Virtual Pelanggan Arya Kusuma Dewa
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/sgcdzp19

Abstract

General Background: The rapid advancement of artificial intelligence creates new opportunities for automating customer service within the e-commerce sector. Specific Background: Businesses frequently encounter difficulties providing fast and consistent responses to repetitive inquiries, highlighting the limitations of manual services at laptop stores like Odega. Knowledge Gap: Prior implementations often lack seamless integration between large language models and external product databases to retrieve domain-specific data accurately. Aims: This study aims to design and develop an intelligent virtual assistant integrated with WhatsApp to improve customer service efficiency. Results: Evaluations demonstrate that the developed chatbot successfully delivers real-time, relevant responses based on product stock data while achieving high user satisfaction. Novelty: This work establishes an integrated architecture connecting webhook mechanisms, the n8n platform, and the Google Gemini API with retrieval-augmented generation. Implications: Implementing this intelligent system optimizes customer service workflows, reduces manual workloads, and accelerates transaction closing processes for e-commerce businesses. Key Findings Highlights Demonstrating that integrating retrieval-augmented generation with large language models successfully overcomes domain-specific data retrieval limitations, Establishing a reliable webhook and n8n platform architecture that connects WhatsApp with automated product databases for real-time customer interactions, Achieving high user satisfaction and strong answer accuracy in managing laptop inventory inquiries and automated ordering processes. Keywords Chatbot, Retrieval augmented generation, Webhook, Artificial intelligence, E-commerce
Hollow Bar Manufacturing Process Using a Conventional Lathe: Proses Pembuatan Hollow bar Menggunakan Mesin Bubut Konvensional Daffa Adhi Sunata; Iswanto Iswanto
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/s5pwhq56

Abstract

General Background: The turning process represents a fundamental machining operation widely applied in the manufacturing industry to produce cylindrical components. Specific Background: Hollow bar manufacturing using conventional lathe machines requires precise sequential steps ranging from material preparation to internal boring and final inspection. Knowledge Gap: Existing industrial reports frequently lack detailed operational parameter analyses and structured documentation regarding dimensional tolerances during conventional hollow bar production. Aims: This study aims to identify and understand the production stages involved in manufacturing a hollow bar using a conventional lathe machine. Results: The applied turning procedures successfully fabricated hollow bars within the specified dimensional tolerances of plus or minus zero point one millimeters while maintaining proper surface finish. Novelty: This work provides an exhaustive practical breakdown of sequential conventional lathe operations specifically tailored for low-carbon steel hollow component fabrication. Implications: Implementing standardized turning procedures, proper tool selection, and safety protocols optimizes manufacturing efficiency and provides practical training insights for industrial engineering students. Key Findings Highlights Demonstrating that conventional lathe machines can effectively manufacture low-carbon steel hollow bars within strict dimensional tolerances of plus or minus zero point one millimeters, Establishing a systematic sequential workflow covering facing, outer diameter turning, drilling, boring, chamfering, and finishing operations, Identifying and overcoming machining challenges such as internal boring vibrations and concentricity maintenance through gradual cutting depths and precise tool adjustments. Keywords Conventional lathe machine, Hollow bar, Turning, Boring, Manufacturing process