MINERAL
ISSN : 25407708     EISSN : 2620729X     DOI : https://doi.org/10.33019/mineral.v6i2
The scientific journal called MINERAL is a scientific periodical publication of Mining Engineering Department , Bangka Belitung University, which is published every April and October in a year which the scope of Exploration (Geology and Geophysics), Geotechnical / Geomechanics, Minerba Processing, Minerba Management and Economics, Mining Environment, Reclamation and Post-Mining. This journal collaborates with Association of Indonesian Mining Professionals (PERHAPI) Center and Forum Komunikasi Program Studi Teknik Pertambangan se-Indonesia.
Articles 22 Documents
Search results for , issue "Vol 3 No 1 (2018): MINERAL" : 22 Documents clear
KajianTeknis Pengaruh Panjang Pukulan Terhadap Recovery Pencucian Bijih Timah Menggunakan Alat Pan American Jig Skala Laboratorium Jurusan Teknik Pertambangan Universitas Bangka Belitung Adiyatma Adiyatma; Janiar Pitulima; Irvani Irvani
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (335.11 KB) | DOI: 10.33019/mineral.v3i1.1568

Abstract

Washing stage of tin ore is done the separation process valuable minerals of tin ore with mineral impurities. This process can be done using jig such as Pan American Jig. The length of stroke is one of the parameters that affect the performance of the jig with high recovery of tin ore leaching. The experiment was carried out by washing experiment using Pan American Jig scale laboratory on 6 times including variation of stroke length 15 mm, 12 mm, 10 mm, 8 mm, 6 mm, and 5 mm with 19 washing sample. The collection and processing of data includes the weight and grade in each of the feed, concentrates and tailings. Determination of recovery value of each experiment is done through calculation between the grade and weight produced by each sample from washing process. Minerals with a high CC value will be very easily separated by the method of Gravity Concentration for example mineral cassiterite with quartz. The highest recovery was obtained in experiment 1 of 68.848% with a stroke length of 15 mm and the lowest recovery was in experiment 6 of 45.801%. However, the highest grade gain was in experiment 6 of 1.3246% and the lowest grade in experiment 1 was 1.2438%. The higher stroke length made greater recovery value produced, the greater recovery made the lower grade obtained.
Optimalisasi Unit Peremukan Dalam Pencapaian Target Produksi 60.000 Ton/Bulan Batu Granit pada Pt Vitrama Properti di Desa Air Mesu Kabupaten Bangka Tengah Ahmad Reza Setiawan; E.P.S.B Taman Tono; Anisa Indriawati
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (298.609 KB) | DOI: 10.33019/mineral.v3i1.1569

Abstract

Granite crushing plant in PT Vitrama Properti is divided into two units, namely primary crusher and secondary crusher with production targets at 60,000 tons/month, but production target had not been reached. Therefore, to achieve the production target, it was necessary to analyze the optimalization of the crushing process starting from the assessment of the availability, the working efficiency of the operator, the feed rate and production capacity of crushing plant by using statistical and mathematical methods. In September 2016, the actual working efficiency of primary crusher unit and secondary crusher unit were very low at 15,75 % and 24,75 % with production only amounted to 16771.49 tons/month and 16,135,59 tons/month. The efforts undertaken in order to achieve production targets are: 1) Increase the actual working efficiency in the primary crusher previously 15,75 to 83.14%, while the secondary crusher previously 24,75 % to 83.27 % 2) Increase the feed rate to the secondary crusher previously 283,44 tons/hour to 320 tons/hour.
KajianEkonomis Perencanaan Pengeboran Dan Peledakan Antara Kemitraan Dengan PT Bukit Asam (Persero) Tbk Pada Wilayah Pit II Banko Barat Di Tanjung Enim Sumatera Selatan Amri Tampubolon; E.P.S.B Taman Tono; Anisa Indriawati
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (312.708 KB) | DOI: 10.33019/mineral.v3i1.1570

Abstract

In 2017 PTBA plans to open pit mining in Banko Barat Pit II uses a system of drilling and blasting. Drilling and blasting activities aimed memberai hard material to support the process of making material by excavator-unloading With limited human resources drilling and blasting is currently assisted by partners. To get the maximum benefit with minimum cost necessary to study the cost of drilling and blasting between using the cost of services partners or self-management tool by PTBA.Planning of drilling and blasting costs PTBA version used by the method of self-management tools while the costs of drilling and blasting use the services of the partnership using the mail service offering. Geometri blasting used method R.L Ash so that would be obtained comparative cost planning and drilling and blasting between PTBA and partner services.The cost of drilling obtained using a self-management tool values ​​obtained Rp 13.021.982.688/tahun, while using the services of the partnership obtained the value of Rp 26.472019.517/year. The cost of blasting using a self-management tool values ​​obtained Rp 44.767.919.566/year, while using the services of the partnership obtained the value of Rp 51.750.738.054/year. The total cost of drilling and blasting self-managed appliance obtained the value of Rp 57.789.902.254/year more economical compared with services partnership with a value of Rp 78.222.757.571/year, these results show the difference in cost of Rp 20.432.855.317/year.
Perbandingan Perhitungan Sisa Cadangan Batu Granit Menggunakan Metode Cross Section Terhadap Metode Contour Pada PT Aditya Buana Inter Di Kabupaten Bangka Andesta Granitio Irwan; Irvani Irvani; Guskarnali Guskarnali
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (340.123 KB) | DOI: 10.33019/mineral.v3i1.1573

Abstract

The calculation of the remaining reserves is one of the important things in the world of mining, especially in the mining business of granite. The importance of the calculation of reserves is used to determine the potential of granite stone resources in determining the amount of production of the company and the age of the company. For that many methods of calculating the reserves that can be used according to the type of minerals to be calculated the remaining reserves one of them using Cross Section Method and Contour Method. Field measurement used theodolith which further processing done by making contour map using Software Surpac 6.6.2. Processing using Minescape 4.119 Software for Cross Section Method with contour map iterval 1, 5, and 10 m and in division section with interval section 10, 15, and 20 m so as to obtain the width of field section, while Contour Method used contour elevation map that is 1, 5, and 10 m so as to obtain the area of ​​the field between the same elevation. After obtaining the area of ​​each method, use the frustum equation and mean area to determine the volume of surface reserves and from the volume results can be known the length of the mine life. The results obtained from the processing is the method of Cross Section largest reserve calculation value is at contour 1 m with the interval section 10 m that is equal to 5.662.168,28 m3 or 14.721.637,53 tons, while the Contour Method of the largest reserve value is at a contour interval of 1 m ie 4,871,332,59 m3 or 12,665,464,73 tons and for the age of the mine obtained using the highest reserve value in the Cross Section Method has a longer mine life of 42 years, while in Contour Method is 41 years.
nalisis Penimbunan Overburden pada Pit 3 Timur Tambang Banko Barat di PT Bukit Asam Persero (Tbk) Ben Paulus Manurung1,; E.P.S.B Taman Tono
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (410.395 KB) | DOI: 10.33019/mineral.v3i1.1574

Abstract

PT Bukit Asam (Persero) Tbk is one of the BUMN which is engaged in coal mining. This research was conducted in Pit 3 East West Banko operated by the contractor. The process of stripping overburden the difference in volume measurement survey overburden calculations progress ritation conveyance of overburden in one period, this can cause losses, therefore analysis overburden dumps.The study was conducted through a survey progress overburden, by measuring the elevation of each stage disposal area using Global Positioning System (GPS), then processed using Software Minescape to get volume of the preliminary draft and volume accumulation from February to October 2016 and then compared with the volume of every ritation to get a correction of cargo carrying means of each ritation. Testing of native soil specific gravity and material of disposal area to get a percentage compaction ofmaterial.The results showed the initial draft disposal volume amounted to 2,508,449.9 m3, the actual volume of hoarding February - October 2016 amounted to 2,130,080.3 m3, the total volume of production of means of conveyance before the compaction of 2,353,206 BCM. Value shrinkage percentage the disposal’ material of 9,3%, so that volume production of means of conveyance after compaction into 2,134,357.84 CCM, then it can be seen that the correction charge each ritasi his conveyance of 23,744 BCM.
Analisa Kestabilan Lereng Menggunakan Metode Fellenius Secara Manual dan Software Slide Rocscience 6.0 (Studi Kasus : TB 1.42 Pemali PT Timah (Persero) Tbk Damos Tiambunan; Irvani Irvani; Ferra Fahraini
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (703.043 KB) | DOI: 10.33019/mineral.v3i1.1575

Abstract

A hill slope is a part of a mining, especially mining by Open Pit Method. The TB 1.42 Pemali PT Timah (Persero)Tbk, which is often referred as the TB 1.42 applies the open it method in its mining, hence the condition of the hill slope greatly influences the mining Safety because hill slope instability can cause avalance. Hance, the hill slope stability has to be calculated.The calculation is performed to get the value of the safety factor (FK) and to understand the slope’s condition. This calculation can be done using yheFelleniusMethod, either manually or using,SoftwareSlideRocscience 6.0. The FelleniusMethod requires the shear strength parameter in the calculation, therefore a laboratory testing is performed using direct shear test ASTM D-3064-04. This test generates the value of cohesion (c),the angle of internal friction (ɸ) and the soil density (γ) of a soil sample taken from the field.Basedon the research the front south slope TB 1.42 Pemali have sandy loam lithology (Slope LT01), clay (Slope LT02 dan LT03), and gravelly clay (slope LT04). Based on the Fellenius Method, the value of FK for the slope is affected by the slope’s angle and shear strength parameter ( c and ɸ). The analysis conducted in this study showed that of the four slopes that are observed, there are two unstable slopes, which are slope LT02 with FK amounted to 0,809 (manual) and 0,877 (slide), which is unstable ; and the slope LT03 with FK amounted to 1,056 (manual) and 1,070 (slide), which is in critical condition. In order to solve the instability of the slope, PT Timah (Persero) Tbk. Can alter the slope’s geometry and install a grouted tieback anchors at unstable slopes.
Analisis Kestabilan Lereng Tunggal Menggunakan Metode Fellenius dan Slide v.6.0 serta Lereng Keseluruhan dengan GeoStudio 2012 pada Pit I Banko Barat PT Bukit Asam (Persero) Tbk Tanjung Enim – Sumatera Selatan Devito Wirasto Simanjuntak; Ferra Fahraini; Anisa Indriawati
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (520.839 KB) | DOI: 10.33019/mineral.v3i1.1576

Abstract

Slopes are a topography that is often found in opened pit mine that had been made by humans with the purpose of exploiting minerals that exist. Landslides can occur on any slopes that is formed due to the increase of shear stress, shear strength declining in the field of landslides or both simultaneously. Slope stability analysis performed to obtain the value of the safety factor of the field of potential landslides. The study conducted at a coal mine Pit 1 Banko Barat PT Bukit Asam (Persero) Tbk by comparing the value of a single slope safety factor Fellenius with manual method to Slide v.6.0 software and the overall slope safety factor with software GeoStudio 2012 From the analysis performed on a single slope 1 to 9, safety factor values ​​obtained below 1.25 for single slopes 1 and single slope 2 to 9 above 1.25. Of the value of the safety factor is obtained, a single slope 1 in critical condition and the single slopes 2 to 9 in stable condition. While the overall slope stability analysis using GeoStudio 2012 program obtained average value of the safety factor - average is 4.57 so the slope can be declared in a stable condition. Then there are effforts to increase the safety factor (FK) of single slopes by changing a single slope geometry previously at an angle of 55 ° to 47 ° in order to obtain the condition of the slopes in a stable condition.
Evaluasi Realiasi Bijih Timah TB 1.42 PT Timah (Persero) Tbk Di Pemali Kabupaten Bangka Epi Epi; Mardiah Mardiah; Irvani Irvani
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (418.999 KB) | DOI: 10.33019/mineral.v3i1.1577

Abstract

TB 1.42 Pemaliwas managed PT Timah (Persero) Tbk. The mining system applied at TB 1.42 Pemali is a mechanical mining system where the mining system activities are conducted by transferring the excavation result of kaksa from work front to stockpile to be wasted using a jig. In terms of mining productivity, the realization of tin ore production was only 80% from the total production that has been planned by the company on November and Desember. Therefore, an evaluation of factors effecting prodution target is essential to do in order to meet unachieved production target. The research was conducted based on the performance coefficient value of load-haluage and transport equipment productivity in November and December assessed from the productivity of the excavators, loaders, and transforting vehicles in March, which is assumed to have the same condition as that in November adn December. An evaluation was conducted to examine the values of mine, effective usage of working time, and the number of bucket loading. The data is then processed using mechanical eatrhmoving formula.The value of performance coefficientin November and December were 0.9 and 0.8, while the performance coefficient of the company are 1.1 – 1.2. After conducting an evaluation, it is found that the factors that lead to failure in achieving the target of production are the long cycle time of the load-haulage equipment, low efficiency of labor, and low match factors. The efforts that should be taken to increase the realization of target achievement are decreasing the cycle time of the load-haulage, increasing the effective usage of working time, and addin in match factor. The cycle time is shortened to 1.159,5 seconds from the initial cycle time of 1.267,8 seconds. The effective usage of working time is increased to 0.75% from 0.727% and the number of load-haulage is increased to 6 from 4 units. After the changes have been done, the production realization in November and December increasing to 156.21 tons of Sn and 128.59 tons of Sn with performance coefficient value of 1.2, thus the production target of the company is achieved.
Kajian Teknis Alat Gali-Muat dan Alat Angkut Pada Pencapaian Pengupasan Overburden 1.120.000 BCM di Pit Taman Tambang Air Laya Bulan September 2016 PT Bukit Asam (Persero) Tbk Irwan Edel Frudis; Mardiah Mardiah; Janiar Pitulima
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (415.203 KB) | DOI: 10.33019/mineral.v3i1.1578

Abstract

In the layer of overburden stripping activities in Pit Taman attainment production amounted about 82% of the production target set in the amount of 925,187.2 BCM of production target of 1,120,000 BCM. This is due to the high resistance factor affecting work efficiency so that production is produced by means of unloading and transportation have not been able to achieve the production target. The data obtained in the field in the form of a data cycle time tools obtained from the calculation of the time distribution of each trencher-fit to perform the excavation, swing content, swing empty and loading and conveyance maneuvering, loading, road to disposal, dumping and back to front as well as the calculation of effective working hours will do the calculation of the amount of productivity. After calculating the theoretically obtained by 1,656,454.08 BCM of overburden production for excavator-unloading and BCM 1,405,890.9 for conveyance. To get productivity achieve production targets then do the optimization tools work plan is to optimize. Optimizing plan working hours adjustment tools and repair equipment capacity are obtained overburden production amounted to 1,914,890.2 BCM. As for after the technical review of the excavator-unloading and conveyance in stripping overburden at Pit Taman in September 2016 on the calculation of production trencher-load transports that have been implemented should only use 3 units of excavator-unloading is 3 units of PC Komatsu 2000 for with the use of 3 units with improvements and performance optimization tools as well as the factors that influence has reached its production target of 1,670,167.71 BCM and for the use of conveyances using Komatsu HD 785 20 units with a production target of 1,615,712.8 BCM.
Perencanaan Kebutuhan Alat Gali-Muat dan Angkut dengan Kapasitas Ore Getting 200 m3/jam pada Rencana Penambangan PT Timah (Persero) Tbk Rajandra Nurhadi; Guskarnali Guskarnali; Irvani Irvani
MINERAL Vol 3 No 1 (2018): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.681 KB) | DOI: 10.33019/mineral.v3i1.1579

Abstract

PT Timah (Persero) Tbk is a company engaged in mining especially tin. Tin is one of the most important deposits in the development of world technology. PT Timah (Persero) Tbk has an important role in the procurement of tin in the world. In mining, the mine planning stage is very important before the exploitation stage. At the planning stage of a mine will be planned in such a way as to obtain optimal results. One of the stages of mine planning is the planning of the required load equipment and haul equipment. PT Timah (Persero) Tbk plans to open a mine with open pit system that is using mechanical equipment in Mining Permit Area of West Bangka Regency, Bangka Belitung Islands Province. The mine plan has an ore-gain capacity of 200 m3/hour, requiring the planning of load and haul equipment to meet the ore getting capacity and stripping of overburden and haul geometry in general. Based on the factors that exist in the mine, the load equipment used is the excavator and haul equipment used is Articulared Dumpt Truck. By taking the cycle time as a reference and then converted by the distance of overburden stripping and ore getting activity every year, then can be known the productivity of equipment and the amount of equipment required each activity every year. The number of equipment required is at least 1 load equipment and 4 haul equipment, while the most are 4 load equipment and 13 haul equipment. The geometry of the haul road based on the specification of the haul equipment at the location of the plan has the width of the haul road on a 12 meter straight road, the haul road width at 21 meters, and the 9,1 meter bend radius

Page 1 of 3 | Total Record : 22