Claim Missing Document
Check
Articles

Found 31 Documents
Search

PERSEPSI MASYARAKAT TERHADAP PROGRAM REVEGETASI EKS LAHAN TAMBANG PT TIMAH (Persero) Tbk DI WILAYAH DESA RIDING PANJANG KECAMATAN MERAWANG-KABUPATEN BANGKA1 (PUBLIC PERCEPTION OF USED LAND MINES REVEGETATION PROGRAM’S PT TIMAH (Persero) Tbk IN RIDING PANJ Tono, E.P.S.B. Taman; Ibrahim, Eddy; Yustian, Indra
PROMINE Vol 2, No 2 (2014): PROMINE
Publisher : Jurusan Teknik Pertambangan FT UBB

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (5.687 KB)

Abstract

Reclamation of former mining areas is the end of mining activities (mine closure), aims torestore the function of the land according to the function and designation. The failure of former mining land revegetation program PT Timah (Persero), Tbk was influenced also by the behavior of the people around the former mining areas. Based on the theory of the environment, and human behavior that can affect the continuity of lives and welfare of the environment, so that the necessary research regarding public perceptions of the revegetation program.This study was conducted to analyze the public perception of the success of revegetation programs and the relationship revegetation program on the role of the community around the area of the former mining areas. Research conducted including descriptive qualitative research method and quote purpose sample through questionnaires, direct observations and interviews. The number of respondents was 88 people, that is: 10% of the number of families in the village of Long Riding totaling 878 households. Processing Stage data through a validation test, reliability test, then performed a correlation analysis using Spearman Rank correlation coefficient.The results showed a very strong correlation (0.771 **), the direction and the significance level of 0.01 to the statement PT Timah (Persero) Tbk has been invited and continue to exclude public participation in the implementation of all the ex-mining land reclamation with respondents not amounted to 51.14% agreed with the statement PT Timah (Persero) Tbk, always doing training, coaching and guidance for achieving succession hoarding activities, leveling and replanting former mining land to executors of the community around the former mining areas by the number of respondents 60.23 % disagree.It can be concluded that the tendency of the public perception of PT Timah (Persero), Tbk to include community participation in the implementation of all revegetation programs and training activities, coaching and direction to the achievement by implementing revegetation succession of communities around the former mining areas are still considered less and can not meet the expectations. Suggestions of this study should be of PT Timah (Persero), Tbk to improve and enhance community development methods in revegetation programs and training activities, coaching and direction to the community around the former mining areas.Key words: reclamation, revegetation, perception, participation, used land mine
PEMETAAN POTENSI BENCANA ALAM (GEO-DISASTER) AKIBAT PENAMBANGAN BIJIH TIMAH DI KECAMATAN JEBUS DAN PARIT TIGA, KABUPATEN BANGKA BARAT S.T., M.Eng., Irvani,; Tono, S.T., E.P.S.B. Taman
PROMINE Vol 2, No 1 (2014): PROMINE
Publisher : Jurusan Teknik Pertambangan FT UBB

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (5.687 KB)

Abstract

The study area is a tin mining region in hundred years, located in Jebus and Parit Tiga District, West Bangka Regency, Bangka Belitung Archipelago Province. Identifying some geo-disaster potential, in order that the geo-disaster mapping caused by tin mining activity is done.    The research is done by observing geological, geomorphological, erosion dan sedimentation conditions, mass movement, abrasion, dan floods. Geo-disaster potential is ilustratrated in map as result of work using geographic information system (GIS) software.    Geo-disasters that come from tin mining at study area are erosion, sedimentation, mass movement, floods and abrasion on the beach, which is about 67% area.Keywords: Geo-disaster, Mapping, Mining, Potential.
KONSERVASI AIR TANAH MELALUI PEMBUATAN BIOPORI SEBAGAI UPAYA MENGATASI KEKERINGAN DI DESA JADA BAHRIN KECAMATAN MERAWANG Anisa Indriawati; Irvani Irvani; Dini Wulansari; Taman Tono; Monika P Handayani
Jurnal Pengabdian Kepada Masyarakat Universitas Bangka Belitung Vol 2 No 1 (2015): Jurnal Pengabdian Kepada Masyarakat Universitas Bangka Belitung
Publisher : Lembaga Penelitian dan Pengabdian kepada Masyarakat Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/jpu.v2i1.123

Abstract

Water plays a very important role for humans and the surrounding environment. The amount of water in a particular area can be analyzed through the geology and geohydrology of the area. The lack of water resources in Jada Bahrain Village requires a conservation effort. The conservation efforts made are by making biopores. Making biopores aims to store water reserves so as to overcome drought. The amount of stored water volume can be predicted through the biopore infiltration rate. From the infiltration data obtained, 50 biopore holes in Jada Bahrain Village are estimated to be able to infiltrate water as much as 6286.23 mL/second.
PELATIHAN DAN SOSIALISASI TEKNOLOGI PEMETAAN DALAM MITIGASI BENCANA BANJIR KOTA PANGKALPINANG irvani Fachruddin; EPSB Taman Tono; Janiar Pitulima
LOGISTA - Jurnal Ilmiah Pengabdian kepada Masyarakat Vol 4 No 1 (2020)
Publisher : Department of Agricultural Product Technology, Faculty of Agricultural Technology, Universitas Andalas Kampus Limau Manis - Padang, Sumatera Barat Indonesia-25163

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1296.488 KB) | DOI: 10.25077/logista.4.1.39-48.2020

Abstract

Kota Pangkalpinang memiliki topografi relatif rendah dan berbatasan dengan laut di bagian timur. Pendangkalan aliran sungai, serta alih fungsi lahan menyebabkan bencana banjir pada musim hujan. Berdasarkan permasalahan dibutuhkan peningkatan penguasaan teknologi pemetaan bagi aparatur kecamatan dan kelurahan, pembuatan peta banjir, dan mensosialisasikannya kepada kalangan pelajar. Program dimulai dengan survey pengumpulan data koordinat banjir, diskusi kelompok terarah dan pelatihan pembuatan peta, dan sosialisasi hasil. Hasil program pengabdian telah meningkatkan kapasitas para aparatur kecamatan dan kelurahan dalam penguasaan teknologi pemetaan. Pada peta banjir dan genangan air Kota Pangkalpinang menunjukkan pola sebaran banjir terdapat pada morfologi dataran rendah disepanjang aliran Sungai Rangkui. Pelajar dan mahasiswa peserta sosialisasi mitigasi bencana banjir mampu memahami materi secara optimal. Keseluruhan hasil program pengabdian secara signifikan memberikan sumbangsih dalam implemetasi teknologi pemetaan untuk mitigasi bencana banjir. Kata Kunci: Banjir, Mitigasi, Pemetaan, Pelatihan, Sosialisasi ABSTRACT Pangkalpinang City has a relatively low topography and bordered by the sea in the east. the stream siltation and land-use change cause floods during the rainy season. Based on the problem, it is needed to improve the mastery of mapping technology for district and village apparatus, making flood maps, and disseminating them to students. The program starts with collecting flood coordinate data, focus group discussions and map-making training, and socialization the result. the program has increased the capacity of the district and village apparatus in the mastery of mapping technology. On the map of floods and puddles of Pangkalpinang City shows the flood pattern distribution found in the lowland morphology along the Rangkui River. Students and scholars participating in the flood disaster mitigation socialization understood the material optimally. The overall results of the community service program significantly contributed to the implementation of mapping technology in flood mitigation. Keywords: Flood, Mitigation, Mapping, Training, Socialization
PEMETAAN POTENSI BENCANA ALAM (GEO-DISASTER) AKIBAT PENAMBANGAN BIJIH TIMAH DI KECAMATAN JEBUS DAN PARIT TIGA, KABUPATEN BANGKA BARAT Irvani Irvani; Taman Tono
PROMINE Vol 2 No 1 (2014): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (316.366 KB) | DOI: 10.33019/promine.v2i1.71

Abstract

The study area is a tin mining region in hundred years, located in Jebus and Parit Tiga District, West Bangka Regency, Bangka Belitung Archipelago Province. Identifying some geo-disaster potential, in order that the geo-disaster mapping caused by tin mining activity is done. The research is done by observing geological, geomorphological, erosion dan sedimentation conditions, mass movement, abrasion, dan floods. Geo-disaster potential is ilustratrated in map as result of work using geographic information system (GIS) software. Geodisasters that come from tin mining at study area are erosion, sedimentation, mass movement, floods and abrasion on the beach, which is about 67% area.
PERSEPSI MASYARAKAT TERHADAP PROGRAM REVEGETASI EKS LAHAN TAMBANG PT TIMAH (Persero) Tbk DI WILAYAH DESA RIDING PANJANG KECAMATAN MERAWANG-KABUPATEN BANGKA Taman Tono; Eddy Ibrahim; Indra Yustian
PROMINE Vol 2 No 2 (2014): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (390.057 KB) | DOI: 10.33019/promine.v2i2.80

Abstract

Reclamation of former mining areas is the end of mining activities (mine closure), aims torestore the function of the land according to the function and designation. The failure of former mining land revegetation program PT Timah (Persero), Tbk was influenced also by the behavior of the people around the former mining areas. Based on the theory of the environment, and human behavior that can affect the continuity of lives and welfare of the environment, so that the necessary research regarding public perceptions of the revegetation program.This study was conducted to analyze the public perception of the success of revegetation programs and the relationship revegetation program on the role of the community around the area of the former mining areas. Research conducted including descriptive qualitative research method and quote purpose sample through questionnaires, direct observations and interviews. The number of respondents was 88 people, that is: 10% of the number of families in the village of Long Riding totaling 878 households. Processing Stage data through a validation test, reliability test, then performed a correlation analysis using Spearman Rank correlation coefficient.The results showed a very strong correlation (0.771 **), the direction and the significance level of 0.01 to the statement PT Timah (Persero) Tbk has been invited and continue to exclude public participation in the implementation of all the ex-mining land reclamation with respondents not amounted to 51.14% agreed with the statement PT Timah (Persero) Tbk, always doing training, coaching and guidance for achieving succession hoarding activities, leveling and replanting former mining land to executors of the community around the former mining areas by the number of respondents 60.23 % disagree.It can be concluded that the tendency of the public perception of PT Timah (Persero), Tbk to include community participation in the implementation of all revegetation programs and training activities, coaching and direction to the achievement by implementing revegetation succession of communities around the former mining areas are still considered less and can not meet the expectations. Suggestions of this study should be of PT Timah (Persero), Tbk to improve and enhance community development methods in revegetation programs and training activities, coaching and direction to the community around the former mining areas.
Rancang Alat Magnetic Separator Untuk Meningkatkan Kadar Bijih Timah Di Laboratorium Teknik Pertambangan Universitas Bangka Belitung Janiar Pitulima; E.P.S.B Tamantono E.P.S.B Tamantono; Haslen Oktarianty
PROMINE Vol 7 No 2 (2019): PROMINE
Publisher : Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/promine.v7i2.1642

Abstract

Magnetic separator testing uses two variables, namely the speed of the roller on the conveyor belt andthe feed speed. Due to the minimum number of variations that can be used in magnetic separatortesting, roller speed testing is used at 0.6 m / s and 0.7 m / s. the variation of figures at the feedingspeed of 0.21 kg / s and 0.35 kg / s so that 8 samples obtained from the processing of a magneticseparator with 4 magnetic samples and 4 non-magnetic samples. The feed samples used wereprepared by drying and sifting into 3 size fractions to be used in the grain counting analysis process sothat the percentage of minerals contained in the sample were found: 15.82% Cassiterite, 63.95%Ilmenite, 6.09% Monazite, 0.48% Pyrite / Marcasite, 1.61% Zircon, 1.44% Topaz, 0.65% Tourmalineand 9.96% Quartz. The effect of roller speed on the increase tin ore content is still common, this isbecause there are not many experiments carried out so that taking the trend of the influence of theroller speed is too fast. The effect of feed speed, the greater the feed speed on the magneticseparator, the smaller the tin ore content obtained.
PERENCANAAN TEKNIS OPERASI PRODUKSI BIJIH TIMAH DI BLOK 3 TAMBANG BESAR 2.1 MITRA PT TIMAH (PERSERO) TBK Awwab Hafizh; E.P.S.B Taman Tono; Anisa Indriawati
MINERAL Vol 2 No 1 (2017): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (538.406 KB) | DOI: 10.33019/mineral.v2i1.1540

Abstract

The process of tin ore mining in TB 2.1 is conducted by channeling slurry (the mixture of ore and water) from the stock pile into the washing unit by using slurry pump. Now, TB 2.1 is planning block 3 for the operation of tin ore production proceess. Thus, a good technical planning in accordance with the characteristic of tin ore in TB 2.1 and evaluation of operating system design in Block 1 are necessary. The sample of tin ore concentrate is taken as many as 250 gr from the washing unit to detect P80 of particle size distribution (PSD) of sample. The data of sucker and pressure pipe’s lenghth, store tank’s height, quantity of primary and secondary jig and tin ore monthly production are required to furthermore plan the mining design, washing plant and equipment needs in the drying unit. Based on the research findings, It is obtained the grain size distribution of tin ore is 1.001 mm, so that the amount of lifting velocity is 3.27 m/s. Slurry pump discharge with a pipe’s diameter of 10 inches is 54 m3/hour, while total head of mining design is 30.23 m. Width of launder required is 6.5 m and equipped with two Grizzlies. Washing plant requires three units of primary Jig (2 × 3 cell) and a unit of secondary jig (2 × 3 cell). Adding rotary vibrating screen, shaking table and rod mill are necessary for process optimization in the drying unit.
Optimalisasi dan Produktivitas Alat Gali-Muat dan Alat Angkut pada Tambang Batu Granit PT Vitrama Properti di Desa Air Mesu, Kecamatan Pangkalan Baru, Kabupaten Bangka Tengah Muhamad Nasuhi; E.P.S.B Taman Tono; Guskarnali Guskarnali
MINERAL Vol 2 No 1 (2017): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (392.49 KB) | DOI: 10.33019/mineral.v2i1.1541

Abstract

Granite mining activity of PT Vitrama Properti is done by blasting system followed by work combination of one unit Excavator serve four units Dump Truck with a production target of 60.000 tonnes/month. The method of this research is quantitative descriptive to know achieving optimization and productivity Excavator-Dump Truck and efforts are needed to achieve the production target. The results of this research that digging and transport activities not run optimally seen from the low efficiency of work, which only reached 46,57% for digging activity and 40,51% material transport activities of the actual productivity of 29503,44 tons / month for Exacavator and 20754,72 tons / month for Dump Truck. Efforts are needed to achieve the production target is to make improvements circulation time of Dump Truck, increase the work efficiency of digging-transport activity and adding charging frequency to vessel Dump Truck.
Evaluasi Produktivitas Crushing Plant Untuk Pencapaian Target produksi 30.000 Ton/Bulan Batu Granit PT Mandiri Karya Makmur Di Desa Tanjung Gunung Kabupaten Bangka Tengah Firmansyah Firmansyah; E.P.S.B Taman Tono; Janiar Pitulima
MINERAL Vol 2 No 1 (2017): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (329.04 KB) | DOI: 10.33019/mineral.v2i1.1542

Abstract

PT Mandiri Karya Makmur is one of private company that engaged in sector of mining and processing of granite rock located in Tanjung Gunung village, Central Bangka Regency with production target of 30.000 ton/year. PT MKM operates 1 unit of crushing plant as a place of granite rock crushing process in order to produce the size of granite rock product that suit to consumer demand. However, The production target of determined crushing plant had not been reached.The aim of this research was to assess the real productivity of crushing plant of PT MKM. The data used in in this research included work time data, the amount of obstructive production time, weight of rock sample and belt conveyor velocity. The Data had functions to assess the availability of equipment and the real productivity of crushing plant. It recommended to repair crushing plant in order to increase the productivity from the result of calculation data.The result of crushing plant analysis in field showed that installed production equipment was 56.250 ton/month, 18.738 ton/month of maximal production, and the real crushing production achieved of 8.848,5ton/month.The availability value of crushing unit, mechanical availability (MA) was 62.5 %, phisycal availability (PA) 71.66 %, use o availability (UA) 65.89 %, effective utilization (Eut) 47.22 %, effective work time 4.25 hour/day and work efficiency 47.22 %. From the condition, production target had not been achieved. The efforts can be conducted to repair crushing unit in order to meet production target such as : 1) To change production target to 15.000 ton/month, 2) To decrease delay time caused human errors (non technical) will raise effective work time from 4.25 hour/day to 6.45 hour/day and will raise productivity as big as 4.580,5 ton/month, from 8.848,5 ton/month to 13.429 ton/month, 3) To change crushing plant