cover
Contact Name
Jurnal Mineral
Contact Email
mineral.ubb@ubb.ac.id
Phone
+6281373020110
Journal Mail Official
mineral.ubb@ubb.ac.id
Editorial Address
Gedung Dharma Pengabdian, Fakultas Teknik Universitas Bangka Belitung, Kampus Terpadu UBB, Balunijuk Provinsi Kepulauan Bangka Belitung
Location
Kab. bangka,
Kepulauan bangka belitung
INDONESIA
MINERAL
ISSN : 25407708     EISSN : 2620729X     DOI : https://doi.org/10.33019/mineral.v6i2
The scientific journal called MINERAL is a scientific periodical publication of Mining Engineering Department , Bangka Belitung University, which is published every April and October in a year which the scope of Exploration (Geology and Geophysics), Geotechnical / Geomechanics, Minerba Processing, Minerba Management and Economics, Mining Environment, Reclamation and Post-Mining. This journal collaborates with Association of Indonesian Mining Professionals (PERHAPI) Center and Forum Komunikasi Program Studi Teknik Pertambangan se-Indonesia.
Articles 6 Documents
Search results for , issue "Vol 6 No 1 (2021): MINERAL" : 6 Documents clear
Perhitungan Cadangan Batupasir di Derah Perencanaan Tambang Desa Pegongsoran, Kecamatan Pemalang, Kabupaten Pemalang, Jawa Tengah Narulita Santi; Wahju K Hidajat; Nur Adillah; Devina Trisnawati; Nurakhmi Qadaryati
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (369.221 KB) | DOI: 10.33019/mineral.v6i1.3078

Abstract

Indonesia has large number of sandstone reserves throughout the region. One of the potential reserves of Sandstones located in Pegongsoran, Pemalang. The purpose of the study is to know subsurface rock distribution so amount of Sandstones reserves can be determined for mining. The method used is Schlumberger arrays configuration geoelectrical method. Geoelectric measurements carried out at four points, geological mapping also conducted to know geological conditions and surface geomorphology.. From data processing in the field lithology found in the field are volcanic breccia, sandstones, and tuff. To figure out the subsurface conditions and rock layer distribution is performed correlation with three sections A-A’ section consist of GL-04, GL-03, GL-01. The B-B’ section consist of GL-04, GL-02, GL-01 C-C’ section consisting of the geoelectrical points GL-03 and GL-02. Based on volumetric calculation result with model block method using Rockworks software sandstones volume is 2,030,000 m3 while Calculation results using Cross-section method is 1,788,845m3
Perencanaan Sistem Pemompaan pada Penambangan Timah Primer Shaft Lacat 4 Pt Menara Cipta Mulia Kelapa Kampit Belitung Timur Aryuni Yusra Hamid; Delita Ega Andini; Haslen Oktarianty
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (497.111 KB) | DOI: 10.33019/mineral.v6i1.3079

Abstract

This research was conducted to redesign the pumping system in the air drying process within a maximum of 25 days. The method used is descriptive and quantitative methods with actual data in the form of pressure and suction pipe elevation, pipe length and diameter, catchment area, actual discharge and pump head, location coordinates.The runoff discharge is 1.89 m3 / s, is prevented from entering the mine area by creating a channel with discharge flow of 2.12 m3 / s. The total volume on Shaft Lacat 4 is 34,591.7 m3 . The pump at a depth of 20 m has a discharge of 229.37 m 3 / hour, while a depth of 28 m has a discharge of 210.73 m3 / hour. Assuming the ground water is 200.64 m3 / hour, the addition of one pump with a discharge of 36 m3 / hour so that the drying time for 24 days is 11.8 hours. Production is stacking the sump of 1 x 1 x 1.5 m, making a channel with dimensions of 10 cm x 10 cm.
Kajian Teknis dan Biaya Kegiatan Rehandling Batubara PT Bukit Asam Tbk Tanjung Enim Sumatera Selatan Rahmad Tanjung; Janiar Pitulima; Delita Ega Andini
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (649.221 KB) | DOI: 10.33019/mineral.v6i1.3080

Abstract

The East Block Muara Tiga Besar Utara mining system uses Shovel and Trucks where the digging stage uses excavators and bulldozers and the transport stage uses a dump truck. Coal production target of Muara Tiga Besar Utara Block Timur in July is 300,000 tons and August is 294,000 tons. The method used in this research is quantitative data analysis method by calculating the productivity of digging and transporting tools, analyzing the technical implementation of coal rehandling activities and analyzing the cost of coal production and rehandling activities. The results of this study obtained the productivity of PC 400 Lc excavator304.35 tons/hour, bulldozer D 375A of 674.61 tons/hour and Hino FM 320FI dump truck equipment of 37.06 tons/hour, the cost of coal production in July is IDR 13,772,009,648.00, in August IDR 13,495,592,315.10 and the cost of coal rehandling activities is IDR 160,685,158.30/month. Based on the cost of coal production and the cost of coal rehandling activities, it can be analyzed that there was a decrease in production costs between July and August due to a decrease in mining production targets in anticipation of coal rehandling activities.
Evaluasi Sistem Penirisan Tambang di PT Vitrama Properti Desa Air Mesu Kabupaten Bangka Tengah Riztia Ramadhanti; Delita Ega Andini; Haslen Oktarianty
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (486.326 KB) | DOI: 10.33019/mineral.v6i1.3081

Abstract

PT Vitrama Properti applies mine dewatering system by making open channel. The open channel got silting because many solid particles have deposited causing the mine road become flooded. The method used is quantitative method by evaluating and analyzing dewatering system. The data taken is in the form of coordinate data, actual discharge, channel dimensions and the time for sediment deposition on settling pond. Catchment area is 42.4 ha. Based on the calculation of rainfall data and rainfall analysis with the gumbell method, the maximum planned rainfall value is 183.9 mm/day with a rain intensity is 63.75 mm/day, the maximum total discharge is 156,193.92 m3 /day or 1.8078 m3 /day. The surface width of the new channel is 1.7 m, the bottom width is 0.5 m and height is 1 m. The new settling pond dimension have total design volume of 3,292.5 m3 . The time for dredging the sediment material in the settling pond is every one or two years when the sediment material in compartment one has deposited as much as 60% of settling pond volume
Kajian Efektifitas Kerja Operator dan Kondisi Alat pada Front Penambangan Tambang Besar Pemali PT Timah Tbk Rajesta F. Wardana; E.P.S.B. Taman Tono; Delita Ega Andini
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (622.063 KB) | DOI: 10.33019/mineral.v6i1.3082

Abstract

The work efficiency value on the TB Pemali mining front in 2018 is relatively low (57.16%), This condition means it required the improvement of the work efficiency in accordance with the good mining practice. Method used in this research including preparation, collecting data and field orientation, which is then processed as follows: counting work efficiency of the dig tools for load and hauling tools in mining area front, analyzing operator performance and equipments conditions in mining area front, and analyzing work efficiency improvements. The result showing that score of current work efficiency of the dig tools for load in the amount of 62.74%, and for hauling tools in the amount of 57.68%. This result shows that low score of work efficiency in mining area front caused by large breakdown time of the hauling tools and low performance of the operator, then improvement of work efficiency is carried out by reducing the operator's variable trouble limit by 35% and reducing indent time of broke sparepart, the final score of work efficiency of the dig tools for load in mining area front is in the amount of 66.27% and for hauling tools in the amount of 66.44%
EVALUASI HASIL PENCUCIAN RAW MATERIAL KAOLIN TERHADAP KEBUTUHAN PRODUKSI UNIT PENGOLAHAN PT ANEKA KAOLINE UTAMA BELITUNG Mukram Belto Pratama; Irvani Irvani; Mardiah Mardiah
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (527.46 KB) | DOI: 10.33019/mineral.v6i1.3083

Abstract

PT Aneka Kaoline Utama produces kaoline powder through two processes which are washing are washing unit and processing unit. Washing unit does the separation between tailing and kaoline with the extract as the result. The extract contains water and kaoline, then the water reduction will be processed in processing unit. Based on the information, writer evaluates the extract production in washing unit for fulfilling the needs of processing unit in PT Aneka Kaoline Utama using evaluation method and action research method. The steps are sampling raw material (feed), calculating the sediment pond’s dimention and the volume of full pond, sampling tailing in washing unit’s tools, observing the production’s process, and evaluating the needs off kaoline extract. The result of this research shows that raw material in washing unit were 3,847.4 ton in April, 3,606.2 ton in May, 2,594.9 ton June, and 3,890 in July which showed the amound of extract did not reach the target in processing unit. 69.2% of loose material and 21% loosing kaolin in average caused the recovery value in washing unit just reached 30.8%. Because of loose kaoline’s presence in washing unit, writer suggests the increasing of raw material and working hour as big as 27,056.3 ton per hour with 30.8% washing unit’s recovery so the company can produce 8.34 ton kaoline per hour and 4,000 ton kaoline per month.

Page 1 of 1 | Total Record : 6