cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 717 Documents
PARENCANAAN KEBUTUHAN BAHAN BAKU SNPATU DENGAN METODE MATERIAL REQUIRI,MINT PLANNING (MRP) Dyah Retno Purwatiningsih
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.118-127

Abstract

IJD KartikaM agetanis a companyw hich produceo r assemblys hoesth at is activitiesdepend on the demand. This company doesn't have a good schedule in requirement andunschedulemd aterial.T his is becomesb y overloadm ateriacl apacitys o that increaseth e holdingcost a.ndr equirementc ost. To scheduleth e appropiatem aterial arriving we needt o plan materialavailabilityw ith Material RequiremenPt lanning( MRP). Firstly implementingt his methodforecast he dernandu, singl inier programmingm ethodt o makea gregata nd Masterp roductionSchedule (MPS). We need the data such as demand, product structure, component stock ,productionc apacitya, ndp roductionc ost.This methodg et the numbero f regulerw orkeri s about 13 personsH. oldingc ost afterimplemented MRP is about Rp 4.608.047,48 and before implemented MRp is aboutRp 6.455.677,08S. otherei s about P;,pl.847.629o,6t2 9% off afteru singM Rp method..
Penjadualan Produksi Melalui Sistem Produksi Just In Time dengan Kaban Guna Memenuhi Permintaan Eti Kristinawati
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.138-146

Abstract

JustI n Timep roductions ystemis a productions ystemw hichp roducea productw hent heyare neededa nd a fit numbero f productt o achievet he consument'sd emand.T o make theproductionp rocessru n well so it mustb e made a plana nd scheduleo f goodp roductionp rocessrangkingw hich is approachw ith the demandc ondition.CV. SugrhW arasi s a furniturec ompanyw hich has a demando f producti ncreaseT. hisproblemw ill maket he companyh ast roublet o achievei t. JIT productions ystemw ith using ascheduleo f productiona nd kanbanb ecomea problems olvinga lternetiveto solvet he customerdemandp roblemF. rom the analysisw e shownt hat usingJ IT problems ystemc anr educeth e backordero fproductr esult.T hep rofit canb e reachedb eforei mplemenJt IT is Rp 253.236.000,0a0n dafteri mplemenJt IT isRp 289.803.000,0s0o t hati ncreasea bout Rp 36.567.000,O0or1 4.44yo.
Quality By Design dengan Metode Taguchi, Konsep dan Perkembangannya Moh. Hartono
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.96-108

Abstract

Industriaml anufactued evelopingis dramaticallpy rogressinngo w followedb y dinamicenvironmentacl hangesT. o give this customerv oices,i ndustrialm anufactureh ave to alwaysincreaseth e quality.I n the otherh andt hereh aveb eenc hangeos f qualityp aradigmath, at's aboutproblems olvinga nd inspectionb, ecomeq ualitye ngineeringin processa nd productw ith Robustdesigna pproachingT. his concepti dea is getting quality processa nd optimump roduct withnoticingn oisef actors,s ot hatt he losso f customercsa nb e minimized.T he Rotrusdt esigni s basedby the needso fdesigni n processa ndp roducth avea strenghtto anu ncontrolledn oisef actors.
PERENCANAAN DAN PENJADWALAN PRODUKSI DENGAN MENGUNAKAN METODE TRANSPORTASI GUNA MENINGKATIFKAN PROFIT Ayudina Puji Estrimaz; Junaedi Iskandar
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.147-155

Abstract

The first step of implementing the planning and schedulling of production usingtransportation method is forecast the demand that oount the number of demand that depend on thetrendo fdata. Recordingto the aralysis,t he fix rnethodw hich appropiatew ith trendo f datai s rnovingaverages, inglee xponenthiaeln dd oublee xponentiaml ethod.T he next stepi s mix datab asedo n theforecastingr esult thet havec onvercedin to hours,a nd changec ost into hours.T he last stepu sing thosedatai nto 85 prcgramt o get a productionp lana ndc osto f planningr esult.F romt he final analysisc anfind decreasincgo sta fteri mplementintgr ansportatiomn ethoda boutR p.-l1.7 65.28Qo,-r 7,27o /oo ff ofthe overall cost.
Perencanaan Line Balaning Guna Meningkatkan Output Produksi Teguh Baroto
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.109-117

Abstract

Every companyw ill alwaysh avem aing oal in a maximumb ennefit.F or this, onef actorwhich support his is how to makea good productionp rocessT. his will be reachedif balancingline of productionfl oor hasa verages tressingo f work especiallyfo r assemblyc ompanyb ecausematerial handling in a work station will influence alother work station and cause production targetof companyw on't be available.For getting line balancing use Rank Positional Weighat (RPW), method which is aheuristicm ethodst hat is statemenot f trial and error approachingT.h is methodd ependso n thefunction value for each work operation based on the standard time for each work activitiesfollowingt hep roductionp rocessra nking( presedencdeia gram).From the analysis using RPW method can be found optimum balance delay to each typeof ARM producti s from 60,46% to 20,5488% with productiono utputl lom 113,50u nits/daybecome 116 unit/day, and also work efiiciency from 60,50 yo to 78,4511 o%, with workstationnumbera bout7 work stationsI.n otherh andf or type ofBED product1 5 hasb alanced elayf rom35,29o /oto 16,454w ith productiono utputi ncreaseft om 77,44m t/day become1 20u niVdaya ndalso hase fficiencya bout6 4,710 /ob ecome8 3,548% with work stationn umbera bout6 . Theni tcan be concludedt hat work stationd esignu sing RPW methodw ill increaseo utput produotespeciallfyo r assemblyc ompany.
Studi Penerapan Strategi Segmentasi Pasar, Target Pasar dan Penempatan Posisi Guna Peningkatan Jumlah Konsumen pada Hotel Kartika Wijaya Batu Wahyu Eni Maryati
Jurnal Teknik Industri Vol. 2 No. 2 (2001)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol2.No2.167-178

Abstract

Market segmentationh ave purpose to devide plural customersi nlo the same marketsegmentationF. rom this segment,m arket sharet hat will be served dependingt o the segmentt hat givemaximum profit for Kartika Wijaya Hotel Batu.The methodu sedi n this researchis usingc lustera nalysisw ith SPSSp rograma s a help.T hesecondm ethodt hat be usedi s caracteristiacn alysism ethodo f customeres achs egmenut singc rossT absanalysisa nd the third methodu singp references tructurea nalysism ethodo f segmenut sing Thurstone'scase analysis.In customers egmentatioann alysisu singc lastera nalysisc an got 5 segments4.. of 5 balancesegmentfso rmedc ustomer'sp rofile caracterislice very segmenbt asedo n demografvi ariatesb, ehaviors,and advantagesA. nd from customer'sp references truclure concludet hat the prize that have beend ecidedby companyim portanat spect/s a tributeso f customer.
Rencana Strategi Bersaing Dan Pemasaran Dengan Metode K-Means Cluster, Multidimensional Scaling, Dan Cross Classified Frequency B Budiono
Jurnal Teknik Industri Vol. 4 No. 2 (2003)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol4.No2.1-10

Abstract

Marketing represent method which used by a lot of side in development or extehsion of market compaxtnent.By defenitif Marketing is an sqcial process and manajerial making individual and group. obtaining what they require and wish, through reciprocal transfer and creation of product and value \Mith others. lndustrial engineedng of muhammadiyah malang university as an institution under shade of Private sector College that is university of muhammadiyah malang. of cours€ very pay aftention to marketing problem. because it caanot deni€d that marketing playing a part important in student improvement in amount. With data existence that is degradation tendency sum up student, of cowse required an effective marketing system to utilize the improvcment of sum up student. K_Means Cluster, Multidimensional Scaling and Cross Classified Frequency rcpresenting some of appliance of analysis used in determination of market segment of Induslrial engineering, by K_Means [is] Cluster, position of industrial engineering UMM compared to competitor with Multidimensional Scaling and also Cross Classified Frequency ( crosstab ) analysis which used in behavioral determination of Industrial engineering consumer of I-IMM. Applying frorn analysis expected to bring positive impact to marketing formulation of industrial engineering of UMM, that is marketing more emphasized at segment of certain ma.ket with paid attention to segment of analysis resul! for tlle competitor, hence the marketing more emphasized at competitor according to analyse result and for crosstab, marketing €mphasized at a consumer behavior in chosening Industrial engineering of UMM, that is by tipologi consumer behavior. so that th€re is imFovement quantitatively sum up Industrial engineering student of tMM after analysis conducted.
Analisa Keandalan Pada Cross Cut Giben D Daryono
Jurnal Teknik Industri Vol. 4 No. 2 (2003)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol4.No2.61-71

Abstract

Gatra Mapan Malang Company is a manufacture company that produce crack TV where is part of the production process is using automatic machine. Cross Cut Giben machine is the most important role machine in process of particle cutting that often out of order. So that it is necessary supported with production machine maintenance regularly ang planned.
Penerapan Rekayasa Nilai Pada Produk Spring Bed Tipe Romano Fery Yulianto
Jurnal Teknik Industri Vol. 4 No. 2 (2003)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol4.No2.20-29

Abstract

"UD.  Dominico", Pasuruan forms the enterprise of furniture sector.  But, the condition of design and facility of spring bed, type of romano cannot give satisfaction enough to the customer, especially the design and facility.  In  this case, there are some complaints  from the customer,  so volume of spring bed sale decreased. The problem took how to make a planning of design and facility of spring bed, especially type of"Romano".The application of Value Engineering  is the way to solve a problem above with terms that have determined or recomanded.
Penerapan Sistem Informasi Manajemen untuk Pembuatan Jadwal Induk Produksi dengan Metode Linier Programming Lailis Syafaah
Jurnal Teknik Industri Vol. 4 No. 2 (2003)
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/JTIUMM.Vol4.No2.11-19

Abstract

Generally, factories always want to give bidden to consumer, therefore ne€d the best production of plain and schedule by programming linier method in order that can be eff€ctive and efficient. Reality main problem flom PT. Serasa Puma Cipta Sidoarjo was pile up of sort ploduct and little others product to next times and to threaten to the first skipsi about difficulty of factories to make QS program for actuality production ofexcellent schedule. Therefore how to actuality management of information system in ordsr that process prepamtion data in tll€ factories was not difficultly for the actuality. The meaning for based on and experienc€ last time, the factories to do that program was difficultly to program operation so production of excellent schedule realize difiiculty. To that answer need actually Management of information system for production of excellent schedule to every group product to every period.

Filter by Year

2000 2024


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol. 20 No. 1 (2019): February Vol 20, No 1 (2019): February Vol 19, No 2 (2018): Agustus Vol. 19 No. 2 (2018): Agustus Vol. 19 No. 1 (2018): Februari Vol 19, No 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol. 17 No. 2 (2016): Agustus Vol 17, No 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol 16, No 2 (2015): Agustus Vol. 16 No. 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol 15, No 1 (2014): Februari Vol. 15 No. 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol. 12 No. 2 (2011): Agustus Vol 12, No 2 (2011): Agustus Vol 12, No 1 (2011): Februari Vol. 12 No. 1 (2011): Februari Vol. 11 No. 2 (2010): Agustus Vol 11, No 2 (2010): Agustus Vol. 11 No. 1 (2010): Februari Vol 11, No 1 (2010): Februari Vol 10, No 2 (2009): Agustus Vol. 10 No. 2 (2009): Agustus Vol. 10 No. 1 (2009): Februari Vol 10, No 1 (2009): Februari Vol 9, No 2 (2008): Agustus Vol. 9 No. 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol. 4 No. 2 (2003) Vol 4, No 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol. 3 No. 1 (2002) Vol 3, No 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol. 1 No. 2 (2000) Vol 1, No 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue