cover
Contact Name
Ahmad Ashifuddin Aqham
Contact Email
ahmad.ashifuddin@gmail.com
Phone
+6285103445501
Journal Mail Official
annasuci@unimar-amni.ac.id
Editorial Address
Jl. Soekarno Hatta No.180, Palebon, Kec. Pedurungan, Kota Semarang, Jawa Tengah 50246
Location
Kota semarang,
Jawa tengah
INDONESIA
Ocean Engineering: Jurnal Ilmu Teknik dan Teknologi Maritim
ISSN : 29635012     EISSN : 29635454     DOI : 10.58192
Core Subject : Engineering,
Menyambut baik kiriman yang memberikan wawasan tentang masalah terkini dan utama yang berhubungan dengan ilmu Teknik dan Teknologi Maritim. Artikel bisa ditulis dalam bahasa Inggris atau bahasa Indonesia.
Articles 165 Documents
Analisis Percepatan Proyek Pembangunan Junior Staff Camp Thiess KBU dengan Metode Crash Program Menggunakan Primavera P6 Farhan Luthfi Andero; Ari Syaiful Rahman Arifin; Faisal Ashar
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 3 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i3.5460

Abstract

Construction projects consist of a series of interconnected activities; consequently, delays in specific activities can impact the project's overall completion time. The Junior Staff Camp construction project at the Thiess KBU site experienced delays relative to the planned schedule, necessitating an acceleration strategy to mitigate these delays. This study aims to analyze the implementation of a "Crash Program" method—specifically by increasing the workforce for critical path activities using Primavera P6—and to evaluate the resulting changes in project duration and labor requirements. A quantitative approach was employed, utilizing actual project data such as planned and actual schedules, work progress, work volumes, activity durations, activity dependencies, and workforce data. The analysis involved identifying delays, determining the critical path, selecting activities suitable for acceleration, calculating durations following workforce increases, and rescheduling using Primavera P6. The results indicate a planned project duration of 88 days, whereas the actual duration reached 122 days, representing a 34-day delay. Five critical activities—A7030, A7130, A7190, A7210, and A7520—were selected for acceleration through the addition of four workers. Rescheduling results showed a reduction in project duration to 109 days, achieving a 13-day (10.66%) acceleration, alongside an increase in peak manpower from 27 to 31 workers. Although the Crash Program scenario successfully reduced the delay, it was unable to restore the project duration to the original planned schedule.
Analisis Pengaruh Penambahan Solar Panel Pada Bangunan Warehouse terhadap Kinerja Pre Engineered Building Roguard Lubis; Rachmi Yanita
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 3 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i3.5541

Abstract

The integration of renewable energy systems, particularly rooftop solar panels, in industrial buildings has increased as part of efforts to improve energy efficiency and sustainability. However, the installation of solar panels on a Pre-Engineered Building (PEB) introduces additional permanent loads that may affect structural performance. This study aims to evaluate the effect of solar panel installation on the structural performance of a PEB warehouse in Medan. The analysis was conducted by comparing the existing structural condition with the condition after the addition of a solar panel load of 0.15 kN/m². A structural model was developed using structural analysis software, while the evaluation considered the utilization ratio (UR) of selected structural members, including the main column, rafter haunch, roof purlin, rafter mid span, and end wall column. The results indicate that solar panel installation increases the utilization ratio of all evaluated structural members. The roof purlin experienced the highest increase, from 0.74 to 0.91, corresponding to 22.97%, while the rafter haunch showed the lowest increase of 11.54%. The critical structural member also shifted from the main column in the existing condition (UR = 0.79) to the roof purlin after solar panel installation (UR = 0.91). Nevertheless, the maximum utilization ratio remains below 1.00, indicating that the evaluated structural members remain within their design capacity. The findings demonstrate that rooftop solar panel installation can be implemented on PEB structures with appropriate structural assessment and load evaluation.
Analisis Konsumsi Energi Listrik dan Identifikasi Peluang Penghematan pada Gedung Pusat Kebugaran Galih Tri Prawira Harja; I Wayan Suriana; I Wayan Sukadana; I Wayan Sugara Yasa
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 3 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i3.5438

Abstract

Electrical energy is essential for supporting the operational activities of commercial buildings. Fitness centers have relatively high electricity consumption due to the use of air conditioning (AC), lighting, sports equipment, and other electrical devices that operate for long hours. LPD GYM Pemogan was selected as the study object because it operates daily with extended hours and various electrical loads. This study aims to determine the Energy Consumption Intensity (ECI), evaluate electrical energy use by comparing the ECI with applicable standards, and identify Energy Saving Opportunities (ESO). The research uses a quantitative descriptive method with an initial energy audit approach, using primary and secondary data on building conditions, electrical equipment, installed power capacity, building area, operating hours, electricity consumption, and electricity bills over six months. The analysis was conducted by calculating electricity consumption and ECI and comparing the results with reference standards. The average electricity consumption was 14,850 kWh/month, with a building area of 764.62 m². The ECI was 19.42 kWh/m²/month or 233.06 kWh/m²/year. Based on the ECI standard for air-conditioned buildings, the value is categorized as inefficient (wasteful), while it remains below the ASEAN-USAID benchmark. Energy savings can be achieved by optimizing AC temperature set points, regulating AC operation, and adjusting schedules according to room usage.
Perancangan Sistem Pendukung Keputusan Pemilihan Vendor Berbasis Web menggunakan Metode Simple Additive Weighting Muhammad Rizq Ramadhan; Henri Septanto
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 3 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i3.5546

Abstract

Proses pengadaan barang pada perusahaan pelayaran memiliki peran penting dalam menjaga kelancaran operasional kapal. Namun, proses yang masih dilakukan secara konvensional melalui komunikasi tidak terstruktur menyebabkan kesulitan dalam pelacakan data, potensi duplikasi permintaan, keterlambatan persetujuan, serta proses pemilihan vendor yang kurang objektif. Penelitian ini bertujuan merancang dan membangun sistem e-procurement berbasis web yang mampu mengotomasi proses pengadaan barang mulai dari pengajuan permintaan, evaluasi penawaran vendor, hingga penerbitan Purchase Order. Metode pengembangan sistem yang digunakan adalah Waterfall dengan tahapan analisis kebutuhan, perancangan, implementasi, dan pengujian. Sistem dilengkapi metode Simple Additive Weighting (SAW) untuk mendukung proses pengambilan keputusan dalam pemilihan vendor berdasarkan kriteria harga, jumlah ketersediaan barang, garansi, dan diskon. Hasil penelitian menunjukkan bahwa sistem berhasil mengintegrasikan seluruh proses pengadaan dalam satu platform, menyediakan rekomendasi vendor secara otomatis berdasarkan hasil perhitungan SAW, serta meningkatkan efisiensi pengelolaan data dan transparansi proses pengadaan. Pengujian black box menunjukkan seluruh fungsi sistem berjalan sesuai kebutuhan, sedangkan verifikasi perhitungan SAW menghasilkan nilai yang konsisten dengan perhitungan manual.
Analisis Kesenjangan Produksi Penambangan Bauksit di Bukit 30 terhadap Target Bulan Mei Berdasarkan Efisiensi Kinerja Operasional pada PT ANTAM Tbk. UBPB Tayan, Kabupaten Sanggau Nurul Dwita Salsabila Tayani; M. Khalid Syafrianto; Redha Nagara Hanis
Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim Vol. 5 No. 3 (2026): Ocean Engineering : Jurnal Ilmu Teknik dan Teknologi Maritim
Publisher : Fakultas Teknik Universitas Maritim AMNI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58192/ocean.v5i3.5656

Abstract

PT ANTAM Tbk. Unit Bisnis Pertambangan Bauksit Tayan menetapkan target produksi Bauksit Cuci (WBx) sebagai patokan bulanan untuk setiap pabrik pencucian. Studi deskriptif kuantitatif ini menganalisis realisasi perolehan bijih dan hari operasi yang memenuhi target, kinerja teknis Pabrik Pencucian 6 (WP 6) Bukit 30, faktor-faktor yang mengurangi produktivitas, dan simulasi waktu kerja efektif untuk mencapai target Mei 2026 sebesar 40.195 ton WBx. Perolehan bijih dari garis depan pertambangan ke WP 6-8 hanya mencapai 75.556 ton, atau 58,72% dari rencana yang setara dengan 13 hari operasi. WP 6 beroperasi selama 13 dari 31 hari kalender dan menghasilkan 12.568,07 ton WBx (31,27% dari target; kekurangan sebesar 27.626,93 ton); hanya tanggal 21 Mei dan 29 Mei yang memenuhi target harian. Faktor konkresi tertimbang adalah 37,74%, efisiensi kerja 50,60%, Pemanfaatan Efektif 52,96%, dan laju umpan aktual 253,09 ton/jam. Kendala dominan adalah siaga normalisasi kolam pengendapan, aktivitas masyarakat, kolam yang terisi lumpur, perbaikan trommel dek ganda, dan perbaikan panel listrik. Simulasi 29 hari menunjukkan target dapat dicapai dengan waktu kerja efektif minimum 14,51 jam/hari (efisiensi 72,55%) pada laju umpan aktual, atau 15,86 jam/hari (79,31%) pada laju umpan minimum 231,53 ton/jam; pada laju umpan aktual dan efisiensi 79,31%, produksi mencapai sekitar 43.937 ton (109,31%). Pencapaian target lebih bergantung pada kontinuitas pasokan dan waktu kerja efektif daripada pada laju umpan yang lebih tinggi.