cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Teknik Sipil
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 185 Documents
MODEL TARIKAN PERGERAKAN TRANSPORTASI PADA KOMPLEKS PASAR KASIH KOTA KUPANG Frans, John H.; Hunggurami, Elia; Johannis, Semuel A. D.
Jurnal Teknik Sipil Vol 9, No 1 (2020)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (749.228 KB)

Abstract

Pasar Tradisional memiliki intensitas kunjungan yang besar. Tarikan itu sendiri dipengaruhi banyak variabel. Untuk itu, penelitian ini dilakukan guna membuat model dari tarikan pergerakan tata guna lahan dan tarikan pergerakan bebasis rumah pada Kompleks Pasar Kasih di Kota Kupang. Pemodelan dilakukan dengan menggunakan analisis regresi linear berganda. Pengumpulan data untuk tarikan pergerakan tata guna lahan akan diperoleh dengan teknik survey kendaraan dan pengumpulan data untuk tarikan pergerakan berbasis rumah akan menggunakan teknik kuisioner. Hasil analisis regresi linear pada penelitian ini adalah Y1 = 2,379X1b + 21,079X1c – 11,649 dan Y2 = 1,407X2b + 0,601X2d + 0,495X2n – 2,200, dengan Y1 adalah tarikan pergerakan kendaraan dalam satuan mobil penumpang, Y2 adalah intensitas kunjungan ke Pasar, X1b adalah jumlah pedagang sayur dan buah, X1c adalah jumlah pedagang daging dan ikan, X2b adalah jenis kelamin pengunjung, X2d adalah penghasilan perbulan, dan X2n adalah kelengkapan barang di pasar.Traditional market have huge intensity of visits. The attraction itself have influenced by many variables. Therefore, the purpose of this research is to make a model from the trip attraction of the land use and the movement attraction with home-based on Pasar Kasih housing in Kupang city. This modelling have done by use the multiple linear regression analysis. The data gathering for the movement attraction of the land use have done by using the vehicle survey method and the data gathering for the movement attraction with home-based have done by using the questionnaire method. The result of this research is Y1 = 2,379X1b + 21,079X1c – 11,649 and Y2 = 1,407X2b + 0,601X2d + 0,495X2n – 2,200, with Y1 is the transportation trip attraction in passenger car unit, Y2 is the intensity of visits in market, X1b is the number of vegetable and fruit traders, X1c is the number of meat and fish traders, X2b is gender of visitors, X2d is the monthly income, and X2n is completeness of commodities on the market.
PENGARUH BAHAN TAMBAHAN TERHADAP KUAT TEKAN, BERAT, DAN SERAPAN AIR BATA RINGAN CLC Pah, Jusuf J. S.; Uly, Patrisia S. B. M.; Widodo, Theodorus
Jurnal Teknik Sipil Vol 9, No 1 (2020)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (725.133 KB)

Abstract

Tujuan yang ingin dicapai dalam penelitian ini adalah Untuk mengetahui nilai kuat tekan bata ringan CLC (Cellular Lightweight Concrete) dengan penambahan admixture dan Untuk mengetahui berat dan nilai serapan air bata ringan CLC (Cellular Lightweight Concrete) dengan penambahan admixture. Analisa yang dilakukan terhadap data-data yang diperoleh dalam penelitian ini adalah untuk mengetahui bagaimana pengaruh penambahan bahan tambahan (additive) pada bata ringan jenis CLC. Analisa dalam penelitian ini dilakukan dengan metode statik deskriptif yaitu dengan menganalisa hasil pengujian laboratorium yang dibuat dalam bentuk grafik pengujian kekuatan tekan bata ringan CLC dan serapan air bata ringan CLC. Selain itu akan dianalisis pula perbedaan kuat tekan dan serapan air bata ringan CLC setelah diberi tambahan bahan tambahan (additive).The objectives of this research was to obtain the value of compressive strenght, volume weight and water absorption of Cellular Lightweight Concrete (CLC) light brick concrete with addition of admixture. The analysis that had been conducted on the data obtained in this research showed that  effect of adding additive to light brick type CLC with addition of admixture. Research of this analysis done descriptive statistical method that is by analyzing result of laboratory test which made in graphical form of compressive strenght test and CLC light water absorption, Also analysed in this study were the difference of compressive strength and light water absorption of CLC with  additive.
ANALISIS GEOMETRIK JALAN DENGAN CIVIL 3D DAN SIG PADA UNIVERSITAS NUSA CENDANA Frans, John H.; Sir, Tri M. W.; Wanggur, Klaudius
Jurnal Teknik Sipil Vol 9, No 1 (2020)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1072.72 KB)

Abstract

Jalan merupakan sarana penunjang kegiatan akademik dalam kawasan kampus UNDANA. pertumbuhan jumlah mahasiswa meningkat tiap tahunnya yang berdampak pada volume kendaraan terus bertambah. Analisis geometrik  bermanfaat dalam memberikan lebar jalur jalan ideal sesuai dengan kriteria perencanaan geometrik jalan. Selisih elevasi pengukuran menggunakan total station dan menggunakan GPS adalah sebesar -2,283 m. Analisa kapasitas jalan nilai derajat kejenuhan dari segmen 1 sebesar 1.339, segmen 2 0.571, segmen 3 0,311, segmen 4 0.252. Analisa geometrik jalan segmen yang memenuhi standar perencanaan hanya pada segmen 2 dengan lebar jalan 7 m. Analisis alinyemen horisontal pada sebelas tikungan yang ada perlu adanya pelebaran perkerasan di tikungan. Tikungan PI 1 membutuhkan pelebaran perkerasan sebesar 1,390 m, tikungan PI 2 2,286 m, tikungan PI  2,270 m, tikungan PI 4 3,495 m, tikungan PI 5 3,495 m, tikungan PI 6 membutuhkan pelebaran perkerasan sebesar 3,000 m, tikungan PI 7 membuthkan pelebaran perkerasan 2,875, tikungan PI 8 2,838 m, tikungan PI 9 2,382 m, tikungan PI 10 2,920 m, tikungan PI 11 1,795 m. Dari ketiga cara analisis geometrik diberikan rekomendasi peningkatan geometrik jalan pada kawasan kampus UNDANA. Lebar jalan 7 m, lebar lajur 3,5 m, lebar trotoar 2,5 m.Road is a means of supporting academic activities within the UNDANA campus area. the growth in the number of students increases every year which impacts on the volume of vehicles continues to grow. Geometric analysis is useful in providing the width of the ideal road path according to the geometric planning criteria of the road. Measurement elevation difference using total station and using GPS is -2,283 m. Road capacity analysis the degree of saturation value of segment 1 is 1,339, segment 2 is 0.571, segment 3 is 0.311, segment 4 is 0.252. Segment road geometric analysis that meets the planning standard is only in segment 2 with a road width of 7 m. Horizontal alignment analysis of the eleven bends required widening of the pavement around the corner. Bend PI 1 requires pavement widening of 1,390 m, bend PI 2 2,286 m, bend PI 2,270 m, bend PI 4 3,495 m, bend PI 5 3,495 m, bend PI 6 requires widening of pavement by 3,000 m, bend PI 7 requires widening of pavement 2,875 , PI 8 curve 2,838 m, bend PI 9 2,382 m, bend PI 10 2,920 m, bend PI 11 1,795 m. Of the three methods of geometric analysis, recommendations were given for increasing the geometric path of the UNDANA campus area. The width of the road is 7 m, the width of the lane is 3.5 m, the width of the sidewalk is 2.5 m.
KOEFISIEN LIMPASAN PERMUKAAN PADA EMBUNG KECIL DI TTU, BELU, MALAKA DAN SABU-RAIJUA Krisnayanti, Denik S.; Hangge, Elsy E.; Sae, Yan C. D.
Jurnal Teknik Sipil Vol 9, No 1 (2020)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1901.612 KB)

Abstract

Provinsi Nusa Tenggara Timur terdiri dari pulau-pulau yang berukuran besar maupun kecil seperti Pulau Timor dan Pulau Sabu Raijua yang merupakan lingkupan daerah (semi-arid) atau daerah semi kering. Penelitian ini dilakukan pada 4 Kabupaten di Pulau Timor yaitu Kabupaten Timor Tengah Utara (TTU), Kabupaten Belu, Kabupaten Malaka, dan Kabupaten Sabu Raijua. Tujuan penelitian ini untuk mengetahui perbedaan nilai koefisien limpasan menggunakan analisis matematis, menggunakan grafik Puslitbang dan menggunakan aplikasi berbasis sistem informasi geografis. Cara analisis menggunakan perhitungan evapotranspirasi metode Penman dan perhitungan debit metode F. J. Mock. Cara perhitungan grafik menggunakan data curah hujan dan data kemiringan lahan. Berdasarkan hasil perhitungan untuk memperoleh nilai koefisien pengaliran limpasan pada Kabupaten Timor Tengah Utara (TTU) yaitu nilai matematis 0,71 - 0,86, grafik Puslitbang 0,62 dan SIG 0,29 – 0,55. Kabupaten Belu yaitu nilai matematis 0,44 - 0,71, grafik Puslitbang 0,62 dan SIG 0,31 – 0,60. Kabupaten Malaka yaitu nilai   matematis 0,44 - 0,70, grafik Puslitbang 0,44 dan SIG 0,30 – 0,57.  Kabupaten Sabu Raijua yaitu nilai matematis  0,00 - 0,06,  grafik   Puslitbang 0,62 dan SIG 0,12 – 0,48.East Nusa Tenggara province consists of large and small islands such as Timor island and SabuRaijua island which are semi-arid region. This research is done in 4 districts on Timor island namely Timor Tengah Utara (TTU) district, Belu district, Malaka district, and SabuRaijua district.The purpose of this research is to determine the difference of run off coefficient value using mathematical analysis, Puslitbangchart and geographic system information application. The method of analysis using the calculation of evapotranspiration  by Penman method and the calculation of discharge by F. J. Mock method. How to calculate the graph using rainfall data and slope data. Based on the results of calculations to obtain runoff flow coefficient values in Timor Tengah Utara District (TTU), namely the mathematical value of 0.71 - 0.86, Puslitbang graph 0.62 and GIS 0.29 - 0.55. Belu Regency is a mathematical value of 0.44 - 0.71, Puslitbang graph 0.62 and GIS 0.31 - 0.60. Malaka Regency is a mathematical value of 0.44 - 0.70, Puslitbang graph 0.44 and GIS 0.30 - 0.57. SabuRaijua Regency is a mathematical value of 0.00 - 0.06, Puslitbang graph 0.62 and GIS 0.12 - 0.48.
KAJIAN HUBUNGAN WASTE MATERIAL KONSTRUKSI DAN ORGANISASI PROYEK KONSTRUKSI Messah, Yunita A.
Jurnal Teknik Sipil Vol 1, No 1 (2011)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAKMaterial merupakan salah satu komponen penting yang harus diperhatikan karenasangat mempengaruhi nilai produktivitas dan biaya proyek. Material dalam pekerjaankonstruksi mempunyai kontribusi sebesar 40-60% dari biaya proyek, sehingga secaratidak langsung memegang peranan penting dalam menunjang keberhasilan proyekkhususnya dalam komponen biaya. Pada proses konstruksi, penggunaan material olehpekerja-pekerja di lapangan dapat menimbulkan sisa material yang cukup tinggi. (Intan,S.,dkk, 2005). Pihak-pihak yang terlibat dalam pekerjaan konstruksi mempunyai peranpenting dalam terjadinya waste material. Kajian ini dilakukan untuk mengetahui pihakyang paling berperan dalam waste material pada pekerjaan konstruksi dengan studikasus struktur organisasi proyek Kuningan City. Hasil analisa mean menunjukan bahwakontraktor pelaksana mempunyai peran paling penting dibandingkan dengan konsultanperencana dan owner, hal ini ditunjukan dengan hasil analisis kontraktor pelaksana79.17%, konsultan perencana, 16.67% dan owner 4.17%. Untuk pihak kontraktorpelaksana, koordinator engineering paling berperan dalam waste material konstruksidengan prosentase 29.17% dan diikuti oleh bagian logistik, 20.83%.