cover
Contact Name
Yulizar Widiatama
Contact Email
yulizar.w@upnvj.ac.id
Phone
+6281218362823
Journal Mail Official
joseon@upnvj.ac.id
Editorial Address
Fakultas Teknik UPN Veteran Jakarta Gedung Fakultas Teknik Kampus Limo Jl. Raya Limo Kecamatan Limo, Kota Depok Jawa Barat 16515 Indonesia
Location
Kota depok,
Jawa barat
INDONESIA
Journal of Optimization System and Ergonomy Implementation
ISSN : -     EISSN : 30467934     DOI : https://doi.org/10.54378/joseon.v1i1
Journal of Optimization System and Ergonomy Implementation (JOSEON) merupakan publikasi ilmiah berkala yang diperuntukkan bagi peneliti yang hendak mempublikasikan hasil penelitiannya dalam bentuk studi literatur, penelitian, dan pengembangan teknologi sebagai bentuk penerapan metode, algoritma, maupun kerangka kerja. Jurnal ini pertama kali terbit pada Oktober 2023, dimana setiap JOSEON saat ini sedang menguruskan ISSN dan e-ISSN Bagi para pengarang atau author dari luar UPN Veteran Jakarta, silahkan untuk melakukan registrasi pada OJS ini JOSEON menyambut hangat para peneliti, dosen, lembaga penelitian, pemerintah lembaga, atau industri untuk berkolaborasi dalam rangka menghasilkan makalah penelitian, ulasan artikel atau kasus studi mengenai Fokus dan Ruang Lingkup sebagai berikut: Sistem Produksi Sistem kerja dan Ergonomi Pengembangan Produk Manajemen Logistik dan Rantai Pasok Pengendalian Kualitas Manajemen Rekayasa dan Optimalisasi Industri Seluruh artikel yang masuk akan dilakukan proses Blind Review, dan akan dilakukan oleh dua mitra bestari kami sesuai dengan kompetensinya. JOSEON Dipublikasikan secara berkala sebanyak 2 Terbitan setahun. Manuskrip dapat disiapkan dalam bahasa Indonesia maupun Inggris. Makalah yang disubmit harus memiliki paling sedikit 6 halaman hingga paling banyak 8 halaman
Articles 6 Documents
Search results for , issue "Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation" : 6 Documents clear
OPTIMALISASI EFEKTIVITAS DAN EFISIENSI DALAM MANAJEMEN RANTAI PASOK AGROINDUSTRI BUAH: TINJAU LITERATUR DAN ARAH RISET MENDATANG Dimas Hardiansyah, Dimas Hardiansyah
Journal of Optimization System and Ergonomy Implementation Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Agroindustry supply chain management involves several integrated supply chain members from upstream to downstream in a sustainable. The main aspects that need to be considered are performance, added value, risk, improving effectiveness and efficiency in the supply chain management. The purpose of this study was to analyze the supply chain performance, added value, and risk used to effectiveness and efficiency improvement of fruit agroindustry supply chain management. A search for scientific articles published from 2005 to 2020 was conducted. There were 94 scientific articles reviewed into five classifications, i.e. apple supply chain management, supply chain performance, added value, supply chain risk, effectiveness and efficiency. So far, there has been little discussion about increasing the effectiveness and efficiency of supply chain management in the fruit agorindustry and has not been carried out comprehensively. The scientific articles obtained were examined into several analyzes of approaches and methods so that models could be developed to improve effectiveness and efficiency of supply chain management. In the future, a combination of several methods and implementations of information technology can be used to effectiveness and efficiency improvement of fruit agroindustry supply chain management.
Analisis Risiko Kecelakaan Kerja Program Zero Steam Leak Unit Hydrotreating Industri Pengolahan Minyak dan Gas dengan Metode HIRADC Fathurohman, Dimas
Journal of Optimization System and Ergonomy Implementation Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Perusahaan pengolahan minyak dan gas dalam praktek kerja lapangan tidak lepas dengan adanya potensi kecelakaan kerja. Penelitian ini bertujuan untuk menganalisis risiko kesehatan dan keselamatan kerja (K3) di unit hydrotreating.  Melalui pendekatan analisis HIRADC, ini mengidentifikasi faktor-faktor yang memengaruhi kecelakaan kerja serta dampaknya terhadap karyawan dan operasional perusahaan. Penelitian ini dilakukan pada pekerjaan perbaikan pipa steam atau yang dikenal dengan Program Zero Steam Leak, penggunaan analisis HIRADC pada pekerjaan tersebut maka akan diteliti risiko apa saja yang dapat terjadi dan bagaimana kemungkinan (Probability) serta Tingkat Keparahan (Severity). Metode penelitian berupa analisis kualitatif, pengumpulan data dengan wawancara dan observasi. Hasilnya didapatkan 28 jenis pekerjaan teridentifikasi. Terdapat 10 pekerjaan dengan tingkat risiko kategori ringan, 8 kategori sedang dan 8 pekerjaan dengan risiko kategori tinggi dan 2 dengan kategori risiko ekstrim yaitu penggerindaan dan terjatuh dari ketinggian. Kemudian setelah dianalisis dapat dihasilkan kesimpulan yang dapat digunakan oleh perusahaan agar dapat dilakukan perbaikan atau tindak lanjut. Untuk mencegah kecelakaan, divisi K3 atau HSE harus melakukan pengawasan dan disiplin yang ketat terhadap pengawasan keselamatan dan kesehatan kerja untuk menghindari risiko yang mungkin terjadi pada proyek yang akan dilaksanakan. Selain itu, pemantauan dan evaluasi pengendalian risiko di lapangan selalu dilakukan karena sangat penting untuk memastikan bahwa pekerja mengetahui dan memahami prosedur pengendalian risiko kerja. Dan akan membantu mengurangi risiko yang mungkin terjadi selama proyek berlangsung.
Analysis of Supplier Selection of Steel Plate Raw Materials on Railways using Analytical Hierarchy Process (AHP) and Additive Ratio Assessment (ARAS) Methods at PT XYZ -, Dira Ernawati; Tranggono; Yekti Condro Winursito
Journal of Optimization System and Ergonomy Implementation Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Companies need to develop a good business strategy in order to compete, including in choosing quality raw materials from the best suppliers. This research aims to select the best steel plate raw material supplier at company XYZ by using the Analytical Hierarchy Process (AHP) and Additive Ratio Assessment (ARAS) methods. This research involves the process of primary and secondary data collection which includes identifying supplier selection criteria, collecting data for each criterion, and collecting performance data from suppliers. The results showed that the order of the best steel plate raw material suppliers at company XYZ with the largest value was ranked 1st supplier company Steel Kras with a K value of 0,195207; ranked 2nd supplier company Jaraindo with a K value of 0,137696; ranked 3rd supplier company Capris with a K value of 0,135158; ranked 4th supplier company Kamaseta with a K value of 0,116481; ranked 5th supplier company Wima Indo with a K value of 0,106039 and ranked 6th supplier company Cenia Mandiri with a K value of 0,084586. Based on the AHP and ARAS methods, the relative weight of each criterion has been calculated, which helps in evaluating the best or potential suppliers to choose from. In addition, the ranking of suppliers is also determined based on the resulting priority value.
ANALISIS STRATEGI PEMASARAN LANTING MENGGUNAKAN METODE SWOT DAN QUANTITATIVE STRATEGIC PLANNING MATRIX (QSPM) DI UMKM LANTING AGUNG: ANALYSIS OF LANTING MARKETING STRATEGIES USING SWOT AND QUANTITATIVE STRATEGIC PLANNING MATRIX (QSPM) METHODS IN LANTING AGUNG indrianto, elsa
Journal of Optimization System and Ergonomy Implementation Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Competition between UMKM who produce similar products will become increasingly competitive, requiring business actors to always maintain and pay full attention to the quality of the products produced. This research aims to achieve the expected goals. With a management strategy, business activities will be more focused and adapt to increasingly complex business developments. The results of the QSPM analysis show that the strategy of maximizing location which is a strategy to attract potential market share has the highest TAS score of 3,62; the strategy of improving and maintaining product quality to maintain customer connections has a TAS score of 3,38; as well as the strategy of providing discounts and better service. good for maintaining customer loyalty has a TAS score of 2,80. The recommended strategy that should be implemented by the company is to maximize strategic locations to attract potential market share.
Tinjauan Penerapan TPM (Total Productive Maintenance) dengan mengukur nilai OEE (Overall Equipment Effectiveness): Berbagai Sektor Industri Supriyati
Journal of Optimization System and Ergonomy Implementation Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Total Productive Maintenance (TPM) was introduced by Seiichi Nakajima in Japan in the 1950s, inspired by the concept of Preventive Maintenance by George Smith from the United States. The initial implementation of TPM was carried out by Nippondenso, a Toyota supplier, in the 1960s, with the result of increased productivity and reduced equipment downtime. TPM evolved into a global management system that focuses on eight pillars to achieve production efficiency, reduced maintenance costs, and improved product quality. TPM has been adopted by various industries, especially Manufacturing. One of the key indicators in TPM is Overall Equipment Effectiveness (OEE), which measures availability, performance, and quality. The OEE value is influenced by six main factors (Six Big Losses), but it is not yet known more specifically the biggest problem of six big losses. For this reason, it is necessary to analyse various industrial sectors. The research shows that downtime due to machine failure is the biggest problem in 35 or 83.3% of industrial sectors. Further analysis is needed to improve the effectiveness of machinery and equipment, especially in the automotive sector which is often the focus of research. The results of the review process also have not found research related to equipment effectiveness through OEE measurements in the field of services.
Analisis Total Productive Maintenance Menggunakan Metode Overall Equipment Effectivenes (OEE) dan Six Big Losses Pada Mesin Curing Tire Press di PT.XYZ Siti Rahayu
Journal of Optimization System and Ergonomy Implementation Vol 3 No 01 (2025): Journal of Optimization System and Ergonomy Implementation
Publisher : Program Studi Teknik Industri S-1, Fakultas Teknik UPN Veteran Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This research was conducted at PT XYZ, a tire manufacturing company established in 1988 in Indonesia. The study focuses on the curing tire press machine, which has experienced high downtime issues. The purpose of this research is to analyze Total Productive Maintenance (TPM) using the Overall Equipment Effectiveness (OEE) method and calculate the Six Big Losses on the machine during the period of January to June 2023. Data was collected through observation, interviews, and literature review. The findings show that high breakdown frequency significantly impacted downtime and reduced production effectiveness. The OEE value of the curing tire press machine was 78.22%, which is below the global OEE standard of 85%. The largest factor hindering OEE achievement was Idling and Minor Stoppages, with a value of 21%. The proposed recommendations are expected to reduce downtime and improve machine performance, allowing PT XYZ to meet its production targets.

Page 1 of 1 | Total Record : 6