cover
Contact Name
Purwanto
Contact Email
garuda@apji.org
Phone
+5289682151476
Journal Mail Official
info@aritekin.or.id
Editorial Address
Perum Cluster G11 Nomor 17 Jl. Plamongan Indah, Kadungwringin, Pedurungan, Semarang, Provinsi Jawa Tengah, 50195
Location
Kota semarang,
Jawa tengah
INDONESIA
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil
ISSN : 30315069     EISSN : 30314089     DOI : 10.61132
research journal of the Engineering Science Clump. The fields of study in this journal include the sub-groups of Civil Engineering and Spatial Planning, Industrial Engineering, Electrical and Computer Engineering, Earth and Marine Engineering
Articles 183 Documents
Analisis Perencanaan dan Pengendalian Proyek Kapal X di PT XYZ dengan Menggunakan Metode Earn Value Management Fredika Aura K.A; Rizqi Novitasari
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.46

Abstract

XYZ is a shipyard company in Indonesia. The company PT. However, the shipbuilding process experienced a delay in the project completion target due to the Covid-19 pandemic. In this research, it is devoted to monitoring ship projects for 30 months, so the EVM earnings value management method is needed to calculate CPI and SPI in order to get results of late calculations for the project and so that it can be re-evaluated using the EVM method, in the results of the EVM CPI and SPI method calculations occur. The delay was due to the impact of Covid-19, while for the SPI in the first 10 months the budget realization was small so it didn't require a lot of costs because the SPI result was greater than 1. However, for the CPI value of the Ship.
Analisis Ergonomi Produk Meja Rias di PT XYZ Menggunakan Pendekatan Antropometri Ghaly Atha Maulana; Tranggono Tranggono
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.47

Abstract

This research analyzes the dressing table products of PT XYZ using anthropometric methods, taking into consideration body measurements such as hip width, thigh length, seated body height, and elbow length. The primary objective is to assess the suitability of product dimensions with human body structure from an anthropometric perspective. The process of testing data uniformity involves calculating the average of observation results, standard deviation, and establishing upper and lower control limits with the coefficient value of k. Adequacy testing of data is conducted to evaluate the quantity of collected data. Subsequently, ideal dimensions for the dressing table product will be determined. The analysis results indicate significant differences between the initial dimensions and the ideal dimensions, concluding that adjustments to product dimensions are necessary. Therefore, it is recommended that PT XYZ make adjustments to the dimensions of the dressing table product based on anthropometric principles to enhance user comfort and customer confidence in the product.
Revitalisasi Mobilitas: Pengoptimalan Sistem Penyeberangan Jalan Terintegrasi dengan Metode Hazard Identification Risk Assesment and Determining Control Pada Terminal Petikemas XYZ Ayyub Ihza Gutawa; Tranggono Tranggono
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.48

Abstract

The low effectiveness of the road crossing system causes frequent accidents and minor incidents that are detrimental to employees and drivers. The large number of accidents that occur can be caused by many factors, including human error, the environment and integrated systems. To be able to measure the possibility and determine a solution to this, XYZ Port applies the HIRADC method which is integrated with the road crossing system. The HIRADC method is an abbreviation for Hazard Identification Risk Assessment and Determining Control. HIRADC is a method in K3 that is used to carry out hazard identification activities, assess the risks posed and determine the form of control for the risks. To achieve superior mobility revitalization, there needs to be an appropriate method for measuring and managing risks in the existing road crossing system. Therefore, the HIRADC method is used to measure all forms of danger and risk in several factors related to optimizing the road crossing system. From the risk analysis, the results obtained were that activities that had a high risk of crossing accidents were crossing traffic management activities. In this activity, there are two dangers that pose a medium risk, namely the danger of vehicles crossing and trailers passing, each at level 9. So it requires more comprehensive risk control efforts to resolve these two dangers.
Implementasi Csr Pt. Chandra Asri Dalam Pengelolaan Sampah Rumah Tangga Melalui Bank Sandi Di Kota Cilegon : ( Kelurahan Tegal Bunder, Kecamatan Purwakarta) Revi Afriza Putri
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.50

Abstract

Increasing the volume of waste is still a crucial issue in various regions, considering that the dense activity of people outside the home makes it difficult to manage waste. Factors that often occur are people's habits and mindset regarding the existence of waste, namely that the product cannot be reused. For this reason, there is a need for waste activities or programs through Corporate Social Responsibility (CSR) within the community such as a waste bank (Bank Sandi) which is the formation of cooperation with stakeholders which aims to manage organic and inorganic waste, provide income to the community, form independence and community empowerment in processing waste. This research aims to find out the stages in implementing CSR, find out the supporting and inhibiting factors in implementing CSR and find out the obstacles in implementing CSR for the residents of Tegal Bunder Village. The method used is qualitative with a case study approach. The research results explain that the stages of CSR implementation are planning, implementation, evaluation and reporting. The supporting factors are company commitment and the inhibiting factors are technical issues, infrastructure for collection and sorting, changing behavior, and no continuous implementation (regulations already exist). And the obstacles in implementing CSR that occur in Tegal Bunder Subdistrict are time segregation, selling to collectors, no involvement of residents, and place. The Corporate Social Responsibility (CSR) program through Bank Sandi has been running well in accordance with the laws and regulations regarding the Company in the form of a commitment carried out by the company on an ongoing basis with the involvement of industry, universities, government and the community.
Analisis Model Sistem Dinamis pada Penjualan Olahan Buah Alpukat di PT XYZ Menggunakan Software Vensim Mukhammad Rivaldi Ghani; Joumil Aidil Saifuddin
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.55

Abstract

The rapid development of the industry has driven the emergence of various technologies that can support the industry, especially in production activities. Production activities are the actions performed by humans to generate a product, be it goods or services, which are then utilized by consumers. These activities operate around the clock to produce products that meet market demand. For smooth production activities, manufacturing industries need to provide raw materials that meet targets and create plans before operating, with inventory levels set to ensure that needs are met in terms of quality, quantity, time, and low cost as planned. PT XYZ is a fruit juice manufacturer with avocado juice being its most popular product. The production of avocado juice was analyzed over the period of 2015-2020 using Vensim software with four scenarios to assess the availability of raw materials. The research findings reveal that the total availability of flour raw materials in 2020 was 10,000 tons; 9,450 tons; 9,500 tons; 10,150 tons; 11,400 tons; 13,250 tons. To address the issue, PT XYZ can monitor fruit stocks and periodically estimate fruit seasons.
Analisis Kepuasan Subkontraktor Terhadap Pelayanan Dan Fasilitas Pengadaan Jasa Divisi Supply Chain PT X Naomi R. Sidabutar; Hafid Syaifullah
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.66

Abstract

PT X is a company engaged in producing ships. PT In the research, a validity test was carried out to determine whether the questions given did not produce deviant (valid) data as measured by the Pearson correlation. Then, this research also carried out a reliability test to determine whether the measuring instrument remained consistent if the measurement was carried out twice or more using the Cronbach's Alpha (a) formula. From the research data, valid variables were obtained, including; Friendliness, Good communication, Willingness and readiness, Efforts to establish good relationships, Easy to contact, Cleanliness of the room, The room is not noisy, Quick service, Bright room light, Does not discriminate between subcontractors, Quick approval of offers, Fast issuance of contracts, Comfortable room, and Accuracy Employee. In this research, all variables were found to be valid, so the next step that must be taken is to carry out reliability calculations because the variables in the questionnaire are valid. From the results of reliability calculations, the Cronbach's Alpha value > significance level value is 0.770 > 0.6, so the instrument is said to be reliable. From the research obtained with IBM SPSS software, it is useful for carrying out validity and reliability tests in analyzing the level of subcontractor satisfaction with facilities and services in the Procurement Services Division of PT X's Supply Chain clearly and optimally.
Analisis Sistem Antrian Jasa Pengujian di Laboratorium XYZ Dengan Menggunakan Software Arena Fajrina R. Izzati; Hafid Syaifullah
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.67

Abstract

The problem in the industrial sector that is often encountered is the problem of queuing. Queues occur when there is an imbalance between services and services offered, causing consumers to wait to get service. Laboratory queue simulation using Arena software. This research was carried out with the aim of analyzing the queuing conditions that occurred during the material A testing process at the XYZ Laboratory through simulation using Arena software. After carrying out a simulation with the Arena software, it was discovered that there were no queues for the material A testing queue activity at the XYZ Laboratory. From the results of the simulation data processing for material A testing queues in the XYZ laboratory, there are no queues and service times are optimal, so there is no need for corrective solutions. Based on the results of verification and validation, H0 is accepted because the value 0 is in the range μ1 – μ2 so it can be said to be valid. This states that the total time in the real situation (real system) is not significantly different from the output results in the Arena simulation that has been created.
Optimalisasi Proses Administrasi Dan Pengelolaan Fasilitas Serta Permintaan Barang PT XYZ Dengan Metode WBS (Work Breakdown Structure) Muhammad Sandi Kurniawan; Joumil Aidil SZS
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.71

Abstract

Administrative process optimization is a systematic effort to improve efficiency, productivity, and quality in the execution of administrative tasks within the company, while facilities management and demand for goods and logistics focus on improving operational efficiency and effectiveness, which will apply the WBS method to decompose complex tasks into more manageable components. This analysis is expected to increase visibility, engagement, and understanding of each stage in the administrative, facilities management, and logistics management processes, enabling more targeted and impactful change implementation. Overall, this research is geared towards achieving improved performance and efficiency at PT XYZ through the application of WBS methodology in the context of the company's administration and logistics.
Optimalisasi Produksi: Berkelanjutan, Efisien, dan Ramah Lingkungan dengan Penerapan Total Productive Maintenance (TPM) menuju Era Green Building (Studi Kasus: Perusahaan Daur Ulang Plastik PT XYZ) Mohammad Shodiq Wahyu Riamto; Rusindiyanto Rusindiyanto
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.111

Abstract

The industrial revolution today is not only oriented towards quality results and cutting-edge technology such as the industrial revolution 4.0. Today's industry is developing by implementing the concept of green building or green industry. Green industry is a concept and idea that an industry no longer only takes into account the advantages and benefits for its company, but also needs to pay attention to the level of efficient use of natural resources and energy sources and minimize the impact of the production process which is felt by the surrounding community and has a negative impact on the environment. , PT XYZ is one of the companies engaged in integrated plastic recycling in the world which processes plastic waste into quality and environmentally friendly products. In order to move towards a green building era that applies efficiency and effectiveness standards for a work system, PT XYZ will plan to determine the effectiveness value of a sustainable production line using the Total Productive Maintenance (TPM) theory. To measure the effectiveness value of a sustainable production process in TPM, the OLE (Overall Line Effectiveness) measurement method can be used. OLE is a tool for measuring the effectiveness of the production process, a modification of the OEE tool which is specifically for determining the value of process effectiveness in sustainable production. From the TPM measurement results, a production line effectiveness value using the OLE method was obtained of 91.7% during September 2023.
Kritik Desain Bangunan Dalam Novel Born From A Wish Karya Mertha Sanjaya Riris Saniyati; Wastari Latifah Tyas R.; Eva Dwi Kurniawan
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 2 No. 1 (2024): Januari: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik S
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v2i1.113

Abstract

This research examines the architectural side of the novel Born From A Wish by Mertha Sanjaya. The aim of this research is to present the results of criticism of the building designs contained in the novel. The method used is a qualitative method with a descriptive approach. From this research, conclusions were drawn in the form of aesthetic aspects, lighting and furniture arrangement in a building as contained in the excerpt from the novel Born From A Wish by Mertha Sanjaya.

Page 2 of 19 | Total Record : 183