cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 5 Documents
Search results for , issue "Vol 5, No 1 (2003): Juni 2003" : 5 Documents clear
SURVEI POTENSI PARTISIPASI MASYARAKAT TERHADAP RENCANA PEMBANGUNAN PLTN MURIA Yarianto Sugeng Budi Susilo; Sri Hariani Sjarief; Heni Susiati; Imam Hamzah; Fepriadi Fepriadi
Jurnal Pengembangan Energi Nuklir Vol 5, No 1 (2003): Juni 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.1.1919

Abstract

ABSTRAK SURVEI POTENSI PARTISIPASI MASYARAKAT TERHADAP RENCANA PEMBANGUNAN PLTN MURIA. Salah satu kelayakan program pembangunan PLTN adalah kelayakan sosial budaya. Semakin terbukanya masyarakat dalam kerangka negara demokrasi telah membawa perubahan dalam paradigma pembangunan. Masyarakat menjadi bagian penting dalam pengambilan keputusan setiap proyek di daerahnya. Bahkan faktor sosial-budaya seperti “social riot dapat menjadi "exclusion factor" seperti yang terjadi pada PT Inti Indorayon beberapa tahun yang lalu. Oleh karena itu faktor sosial budaya harus mendapat pertimbangan yang matang dalam perencanaan pembangunan PLTN. Salah satunya adalah membuat peta potensi partisipasi masyarakat terhadap rencana pembangunan PLTN. Metode penelitian yang digunakan adalah pendekatan kuantitatif dengan melakukan survei yang dipandu dengan kuesioner, tanpa memberi perlakuan apapun pada obyek yang diteliti (ekspose fakto). Selain itu juga dilakukan pendekatan kualitatif dengan uindepth interview untuk menggali informasi secara mendalam. Sampel yang diambil adalah masyarakat umum di sekitar tapak PLTN, sampai radius 10 km. Teknik sampling yang digunakan adalah acak sempurna. Hasil survei menunjukkan bahwa sebagian besar masyarakat di sekitar tapak cukup berpotensi untuk berpartisipasi menghadapi pembangunan PLTN. Suasana yang cukup kondusif ini perlu dibina secara terus menerus agar tidak kehilangan momen, dengan melakukan social setting.   ABSTRACT SURVEY OF PUBLIC PARTICIPATION POTENTIAL REGARDING THE MURIA NPP PROGRAM. Socio-culture aspect is a part of site feasibility evaluation of Nuclear Power Plant (NPP) program. Indonesia is undergoing democratization, therefore the paradigm of development has also been changed where the people have freedom or liberty and they can express their opinion independently. The people are significant factor that involving in the decision making of regional development. Even the socio-culture, such as social riot, can reject the site. Therefore socio-culture aspect should be considered in the NPP site evaluation. The first step of the study, mapping of public participation potential should be conducted by field survey. The method used in the research is quantitative approach with field survey guided by questioner without any treatment of object sampled. Qualitative approach was also conducted by indepth interview technique to collect more detailed information. Information were collected from general public without any stratification in the 10 km radius from NPP site. Sampling method used was full random sampling technique. The results of survey show that the most of the people have significant potential for participating in the NPP Program. Conducive atmosphere should be maintained by social setting, therefore the present good momentum will not be lost.
PERKIRAAN DESAIN BASIS CURAH HUJAN DI SEMENANJUNG MURIA Sunarko Sunarko; Sri Hariani Sjarief; Eddy Murdjito; Imam Hamzah
Jurnal Pengembangan Energi Nuklir Vol 5, No 1 (2003): Juni 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.1.1915

Abstract

ABSTRAK PERKIRAAN DESAIN BASIS CURAH HUJAN DI SEMENANJUNG MURIA. Nilai desain basis diperlukan dalam memperhitungkan aspek kesalamatan PLTN. Perhitungan telah dilakukan terhadap parameter meteorologi curah hujan. Data curah hujan diperoleh dari stasiun pemantauan milik Departemen Permukiman dan Prasarana Wilayah dan PTPN IX untuk daerah Bangsri, Beji, Jatisari, keling dan Jepara. Data curah hujan maksimum dalam periode 24 jam memiliki unit mm/hari. Pada studi terdahulu, konsultan Newjec menggunakan data dari stasiun Ujung Watu dengan periode pemantauan selama kurang dari 2 tahun. Pada perhitungan ini digunakan paling sedikit data selama 19 tahun. Data diolah menggunakan dua pendekatan: statistik dan numerik, menggunakan persamaan Gumbel (Generalized Extreme Value distrbutions-GEV Type I). Dari data diperoleh rerata curah hujan sebesar 248 mm/hari (metode numerik) dan 258 mm/hari (metode statistik) perioda pengulangan (return period) 50 tahun. ABSTRACT PRECIPITATION DESIGN BASIS CALCULATION FOR MURIA PENINSULA. Design basis value is required as a requirement in the nuclear power plant safety analysis. Calculation was done for precipitation. Data was gathered from location close to the area e.g. in Bangsri, Beji, Jatisari, Keling, and Jepara, all within Muria peninsula, from the Department of Settlement and Region Infrastructure and PTPN IX, a state owned plantation. Maximum 24 hour precipitation data was gathered in the unit of mm/day. In previous study by Newjec consultant, data was obtained from Ujung Watu station covering less than 2 year period of observation. In this paper, the data includes at least 19 years of data. Analysis was done using two approaches: statistic and numeric, using Gumbel distribution function (Generalized Extreme Value distribution - GEV Type I). Average precipitation for 50 years of return period are 248 mm/day and 258 mm/day using the numeric and statistic approach respectively.
PERHITUNGAN BIAYA EKSTERNALITAS PLTGU GAS MUARA KARANG Masdin Masdin; Scorpio Sri Herdinie
Jurnal Pengembangan Energi Nuklir Vol 5, No 1 (2003): Juni 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.1.1916

Abstract

ABSTRAK PERHITUNGAN BIAYA EKSTERNALITAS PLTGU GAS MUARA KARANG. Salah satu sasaran dari studi "Comprehensive Assessment of Different Energy Sources for Electricity Generation in Indonesia" adalah perhitungan biaya eksternalitas dengan menggunakan program Simpacts. Sasaran studi ini adalah mendukung perencanaan dan proses pengambilan keputusan energi dan listrik nasional dengan mempertimbangkan tekno-ekonomi, sosial, bijaksanaan, dan lingkungan. Salah satu pembangkit yang menjadi perhatian adalah PLTGU Muara Karang berbahan bakar gas dengan daya keluaran 500 MWe, yang berada di wilayah bagian utara Jakarta. Secara geografis wilayah ini sangat padat dengan penduduk dan di sekitarnya merupakan salah satu pusat bisnis dan industri di Indonesia. Hasil perhitungan menunjukkan besar dampak kesehatan yang terjadi sebanyak 51.400 kasus tiap tahun dengan 86,05% kasus yang terjadi adalah gangguan pernapasan tingkat rendah baik orang dewasa maupun anak- anak oleh polutan nitrat dan biaya kesehatan total yang dibebankan sebesar 1.830.000 US.S dengan 78,85% dari polutan nitrat dan 21,15% dari polutan N02. Biaya Eksternalitas yang diakibatkan oleh PLTGU Gas Muara karang selama tahun 2000 diperoleh sebesar 0,11 cent per kWh per tahun (berdasarkan data pada tahun 2000).   ABSTRACT CALCULATION OF EXTERNALITY COST FOR MUARA KARANG GAS COMBINED-CYCLE. One of study objectives on "Comprehensive Assessment of Different Energy Sources for Electricity Generation in Indonesia" is to calculate externality cost by using Simpacts Program. The goal of this study is to support planning and decision making for energy and electricity development by taking into account the techno-economic, social, policy and environment. Muara Karang Gas Combined-Cycle Plant with 500 MWe capacity. It is one of power plants in Jawa-Bali System, which lies in a highly populated area of northern Jakarta and close to the central area of bussiness and industrial activities. The result of calculation indicated that the health impact reaches 51.400 cases per year with 86.05 % of which is asthma for adults and children due to nitrate and total damage cost expended is around 1.830.000 US.$ with 78.85% of Nitrate and 21.15% of N02. The externality cost of Muara Karang Gas Combined-Cycle is 0.11 cent per kWh per year (based on data in year 2000).
IDENTIFIKASI KUALITAS UDARA AMBIEN DI WILAYAH CALON TAPAK PLTN MURIA Heni Susiati; Yarianto Sugeng Budi Susilo; Sri Hariani Sjarief; Imam Hamzah; Suprijadi Suprijadi
Jurnal Pengembangan Energi Nuklir Vol 5, No 1 (2003): Juni 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.1.1917

Abstract

ABSTRAK IDENTIFIKASI KUALITAS UDARA AMBIEN DI WILAYAH CALON TAPAK PLTN MURIA. Kualitas udara ambien di wilayah tapak PLTN perlu diketahui untuk menghindari kesalahpahaman masyarakat terhadap pencemaran udara dari sumber lain terutama dengan akan beroperasinya PLTU Tanjung Jati. Analisis kualitas udara telah dilakukan di wilayah calon tapak PLTN Muria untuk mengidentifikasi baseline data kualitas udara. Pengukuran mencakup 8 titik lokasi pengamatan yang telah mempertimbangkan aspek meteorologis dan lokasi PLTU Tanjung Jati. Parameter yang diukur meliputi S02l N02, CO, H2S, Ox, Hidro Karbon, TSP, PM-10, Pb, Cd, dan kebisingan. Metode pengukuran yang dilakukan sesuai dengan parameter yang diukur. Hasil pemantauan kualitas udara di lokasi PTPN IX Ujung Lemahabang, Pantai Bayuran, PLTU Tanjungjati, Margokerto, Krajan, Jenggotan, Beji Barat, dan Kedung Penjalin tidak melampaui batas kadar maksimum yang ditetapkan dalam kriteria kualitas udara ambien untuk wilayah di Propinsi Jawa Tengah dan berada dalam kategori baik sampai sedang.   ABSTRACT IDENTIFICATION OF AMBIENT AIR QUALITY IN THE REGION OF MURIA NPP SITE. Air quality in the region of NPP site was needed to avoid public misunderstanding of air pollution coming from other sources, in addition, Tanjung Jati coal fired plant will be operated. Analysis of air quality have been conducted in the region of Muria NPP site to obtain baseline data on air quality. The investigation cover 8 location points taking into account the meteorological aspect and their location to Tanjung Jati coal fired plant. Parameters measured are the concentration of S02, N02, CO, H2S, Ox, Hydro Carbon, TSP, PM-10, Pb, Cd, and noise. Measurement method used are properly corresponding with the parameter measured. The result of measurement shows air quality in PTPN IX Ujung Lemahabang, Bayuran Beach, Tanjungjati coal fired plant, Margokerto, Krajan, Jenggotan, Beji Barat, and Kedung Penjalin still lower than maximum limit of ambient air quality as stipulated by the Government of Central Java Province. Air quality in the region are categorized as aither good and moderate.
THE ROLE OF NUCLEAR POWER AND OTHER ENERGY OPTIONS IN COMPETITIVE ELECTRICITY MARKET STUDY USING MESSAGE MODEL Scorpio Sri Herdinie; Edi Sartono
Jurnal Pengembangan Energi Nuklir Vol 5, No 1 (2003): Juni 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.1.1918

Abstract

ABSTRACT THE ROLE OF NUCLEAR POWER AND OTHER ENERGY OPTIONS IN COMPETITIVE ELECTRICITY MARKET STUDY USING MESSAGE MODEL. The electricity demand in Indonesia is very high due to the National Economic Development based on industrialization and supported by a strong agriculture base. It can be noted that in the last five years, the annual electricity growth rate has been reaching around 15% per annum. Though during the economic crisis the electricity demand have time to reduction. Start early 2000s the economic growth in Indonesia will gradually increase. As a consequence, the electricity growth rate also increase in the next coming decades. MESSAGE (Model for Energy Supply Strategy Alternatives and their General Environmental Impacts) is a model designed for the optimization of energy system (i.e. energy supplies and utilization). The goal of this study is to support the national planning and decision making process in the energy and electricity sector in Indonesia with regard to the economic, health, environmental and safety aspects. The objective of this study is to analyse the role of Nuclear Power Plant in the whole energy systems by introducing the new electricity regulation and structure in the market. Seen that Nuclear Power Plant will be enter the Java Bali system in the period between 2015-2020. and will dominate the addition of capacities by the end period of study (year 2020-2025). Nuclear energy has very important long term roles in the energy scenario and it is possible to do the market competitiive when the Multi buyer Multi Seller (MBMS) will be done in the system electricity in Indonesia (the government has changed the target of MBMS realization into 2007).   ABSTRAK STUDI PERAN PEMBANGKIT TENAGA NUKLIR DAN ENERGI LAIN DI DALAM KOMPETISI PASAR LISTRIK DENGAN MENGGUNAKAN PROGRAM MESSAGE. Tuntutan akan kebutuhan listrik Indonesia sangat tinggi dalam kaitan dengan Pengembangan Ekonomi Nasional berdasar pada Industrialisasi yang didukung oleh pertanian kuat. Hal ini dapat dilihat bahwa pada lima tahun terakhir, laju pertumbuhan listrik telah mencapai sekitar 15% tiap tahun. Meskipun selama krisis ekonomi, permintaan listrik sempat mengalami suatu pengurangan. Mulai awal 2000-an pertumbuhan ekonomi Indonesia secara berangsur-angsur meningkat. Sebagai konsekwensi, laju pertumbuhan listrik akan juga meningkat pada dekade yang akan datang. MESSAGE (Model for Energy Supply Strategy Alternatives and their General Environmental Impacts) adalah suatu model optimalisasi sistem energi (yaitu, penyediaan energi dan pemanfaatan). Tujuan dari studi ini adalah untuk mendukung proses pengambilan keputusan dan perencanaan energi nasional dan sektor listrik di Indonesia yang mempertimbangkan nilai ekonomi, kesehatan, lingkungan dan aspek keselamatan. Sasaran studi ini adalah untuk meneliti peran Pembangkit Energi Nuklir pada keseluruhan sistem energi dalam kaitannya dengan peraturan sistem pasar listrik yang baru. Hasil dari studi ini dapat disimpulkan bahwa pembangkit Listrik tenaga Nuklir akan masuk ke dalam Sistem Jawa-Bali pada periode tahun 2015-2020, dan akan mendominasi penambahan kapasitas pada periode akhir studi (tahun 2020-2025). Peran energi nuklir jangka panjang sangat penting di dalam skenario penyediaan energi khususnya listrik dan memungkinkan untuk berkompetitif dengan energi yang lain dalam menghadapi sistem pasar yang Multi Buyer Multi Seller (MBMS), jika sistem tersebut diberlakukan di Indonesia (pemerintah telah mentargetkan perwujudan sistem pasar MBMS pada tahun 2007).

Page 1 of 1 | Total Record : 5


Filter by Year

2003 2003


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue