cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Otopro
ISSN : -     EISSN : -     DOI : -
Core Subject : Education,
Arjuna Subject : -
Articles 5 Documents
Search results for , issue " Vol 6, No 2 (2011)" : 5 Documents clear
PENGGUNAAN BEBAN TRANSIEN TERHADAP DAYA PROTON EXCHANGE MEMBRANE FUEL CELL (PEMFC) Aris Ansori,
Otopro Vol 6, No 2 (2011)
Publisher : Otopro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

           Tenaga penggerak kendaraan selalu mengalami kenaikan dan penurunan beban sesuai dengan kondisi jalan kendaraan. PEMFC dapat digunakan sebagai tenaga penggerak kendaraan. Perubahan beban pada PEMFC dapat mem pengaruhi performa PEMFC seperti daya PEMFC. Oleh sebab itu diperlukan penelitian untuk mengetahui daya yang dihasilkan PEMFC. Penelitian dilakukan dengan menggunakan stack PEMFC. Ukuran dimensi stack PEMFC 9 x 9 x 3 cm, area aktif (EcoFC) 14,5 cm2, temperatur kerja 800 C, daya maksimum 3,5 watt. Gas hidrogen dialirkan pada sisi anoda dengan flowrate 0,0066 mL/s, kelembaban 90 %, temperatur gas 220 C dan gas oksigen dialirkan pada sisi katoda dengan flowrate 0,075 mL/s, kelembaban 90 %, temperatur gas 220 C. Variabel resistor 250 ohm dipasang pada kutub anoda dan katoda. Variabel resistor digerakan naik turun secara mekanik sehingga mengalami perubahan resistansi dengan rentang waktu 300 sekon. Metode pengukuran data untuk mengetahui daya PEMFC dengan melakukan pengukuran arus listrik dan tegangan sel PEMFC. Pengukuran menggunakan data loger dengan kecepatan pengambilan data 50 data/sekon. Metode analisa data penelitian menggunakan analisa grafik dengan program microsoft office excel. Berdasarkan hasil penelitian menunjukkan bahwa penggunaan beban transien menyebabkan perubahan daya PEMFC.            A vehicle activator power has always increased according to the vehicle¡¯s road condition. PEMFC can be used as vehicle¡¯s activator power. The load alteration on PEMFC can influence the PEMFC performance such us PEMFC power. Therefore, a research to find out PEMFC power is necessary needed. The research was done by using stack PEMFC. The dimension of stack PEMFC 9 x 9 x 3 cm, active area (electrode) 14,5 cm2, work temperature 80¢ª C, maximum power 3,5 watt. Hydrogen flow anode with 0,0066 ml/s flow rate, 90 % humidity, gas temperature of 22¢ª C and oxygen flow cathode with 0,075 ml/s flow rate, 90% humidity, gas temperature of 22 ¢ªC. Resistor variable 250 ohm assembling to anode and cathode. Variable resistor was moved up and down mechanically that it underwent resistance value alteration within 300 second. The data measurement method of PEMFC power, by measuring electric current and PEMFC cell tension for 300 seconds use longer data that have data collection speed 50 data/second. The analysis by microsoft office Excel program. The result of the research points out that the use of transient load on PEMFC can influence the PEMFC power.
SISTEM PENDUKUNG KEPUTUSAN METODE LOT SIZING MATERIAL REQUIREMENT PLANNING DI P.T. "X" Iskandar, ; Ir. Purnomo Budi S, ; M.sc. Ph.d, ; Dra. Murti Astuti, ; M.sie,
Otopro Vol 6, No 2 (2011)
Publisher : Otopro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

           Kelemahan dalam menguasai dan mengontrol sistem Material Requirements Planning (MRP) menjadi kendala dalam implementasi sistem tersebut di perusahaan. Penggunaan program berbasis komputer yang didesign secara khusus dapat mengkompensasi kelemahan dalam menguasai MRP guna meningkatkan kinerja sistem tersebut disamping dukungan managemen untuk mengefektifkan sistem ini. Sistem Pendukung Keputusan (SPK) pada thesis ini didesign khusus untuk memperbaiki kinerja MRP dalam hal pemilihan lot sizing untuk menimalisasi biaya inventory yang timbul akibat pengadaan material bahan baku di pabrik kemasan plastik P.T. “X”. SPK ini akan melakukan proses perhitungan untuk mencari keputusan biaya inventory terbaik dengan cara menghitung dan membandingkan biaya inventory menggunakan 4 metode lot sizing diantaranya: Lot For Lot, Fix Order Quantity, Fix Periode Requirements dan Economic Order Quantity. Dari hasil perancangan dan pengujian aplikasi Sistem Pendukung Keputusan akan menghasilkan keputusan yang tepat dan fleksibel dengan aspek yang mempengaruhi keputusan tersebut, serta menghasilkan laporan agar user mengerti akan keputusan tersebut diambil            The lack of company expertise and less control in Material Requirements Planning (MRP) to be the major implementation obstacle. Lot sizing methods at PT. “X” considered has not been optimum in balancing between holding costs and ordering costs in raw material supplies. The Purpose of this research is to build Decision Support System (DSS) which can give lot sizing alternatives to find the lowest inventory cost. The research to build DSS starts with Intelligence Phase: to know organizational objectives, search and scanning procedures and data collection. Next phase is Design Phase: design database, formulate a model, set criteria for choice, search for alternatives and create user interface. And final phase is implementation and validation by showing 4 methods calculation of lot sizing i.e.: Lot for Lot, Fix Order Quantity, Fix Period Requirements and Economic Order Quantity. The research showed the DSS could give alternatives lot sizing methods in finding lowest inventory cost and give full report for user to understand the best option. Lot for lot as lot sizing method in company revealed as the worst practice between 3 other lot sizing method alternatives.
HUBUNGAN INTENSITAS KEBISINGAN Dewi Kurniasih,
Otopro Vol 6, No 2 (2011)
Publisher : Otopro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kebisingan memberikan dampak yang negative bagi pekerja yang bekerja di industri, yaitu memberikan dampak berupa gangguan auditory dan non auditory. Penelitian ini akan menganalisis hubungan antara intensitas kebisingan dengan hasil pengukuran tekanan darah, dan hubungan antara karakteristik individu dengan hasil pengukuran tekanan darah. Dimana hasilnya bahwa intensitas kebisingan tidak memberikan pengaruh yang signifikan pada peningkatan tekanan darah, hal ini karena dipengaruhi adanya ritme kerja di Pabrik Tekstil X. Karakteristik individu yang paling berhubungan adalah umur. Noise give negative impact to worker in industry, there are give impact in form of auditory and non auditory. This research have been analysis relationship between noise intensity with result of blood pressure measurement, and relationship between individual characteristic with result of blood pressure measurement. In which the result is noise intensity do not give significant influence to increase blood pressure, it is influence by work ritme in Textile  Factory X. Its mostly influence by age.
PEMODELAN DRAFT AND TRIM TRANVERSE LONGITUDINAL STABILITY PADA REGULATING THE STORAGE UNTUK MENGANALISA PENGARUH RIGHTING MOMENT Arief Subekti, ; Muhammad Shah,
Otopro Vol 6, No 2 (2011)
Publisher : Otopro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PERANCANGAN GROUNDING TANGKI Mohamad Hakam, ; Aditya Ayuningtyas, ; Wibowo Arnin,
Otopro Vol 6, No 2 (2011)
Publisher : Otopro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

           PT.Pertamina EP Field Cepu merupakan perusahaan yang menyelenggarakan kegiatan usaha di sektor hulu bidang minyak dan gas bumi, meliputi eksplorasi dan eksploitasi. Dalam operasinya PT.Pertamina EP Field Cepu mengumpulkan minyak bumi yang dihasilkan dari sumur – sumur pengeboran dalam tangki – tangki yang ada pada Stasiun Pengumpul (SP). Stasiun Pengumpul 3 distrik 2 merupakan Stasiun Pengumpul yang belum dilengkapi dengan sistem grounding tangki. Berdasarkan tingkat bahayanya perlu adanya perancangan grounding tangki yang baik sebagai upaya mengurangi resiko bahaya sambaran petir. Perancangan grounding dilakukan dengan menentukan jenis dan jumlah elektrode berdasarkan PUIL 2000. Dari hasil perancangan ini, diketahui bahwa untuk stasiun pengumpul 3 dengan luas 4039,32 m2 Jenis elektrode yang digunakan untuk grounding tangki adalah elektrode batang sejumlah 4 elektrode dengan masing – masing panjangnya 5 m.            PT.Pertamina EP Cepu Field is a company which carry on business in the upstream oil and gas, including exploration and exploitation. In operation PT.Pertamina EP Cepu Field collecting oil produced from wells drilling in the tanks that is at Station Collector (SP). District 2 Station Collector 3 is a station that has not been equipped with a tank grounding system. Based on the level of danger necessary to design a good grounding tank to reduce the hazards of lightning strikes. The design of the grounding is done by determining the type and number of electrodes based PUIL 2000. From the results of this design, it is known that for the station collector 3 with an area of ​​4039.32 m2 type of electrodes used for grounding tank is a 4 electrode rod electrode with each length of 5 m

Page 1 of 1 | Total Record : 5