cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Mahasiswa TEUB
Published by Universitas Brawijaya
ISSN : -     EISSN : -     DOI : -
Core Subject : Education,
Arjuna Subject : -
Articles 23 Documents
Search results for , issue "Vol. 12 No. 3 (2024)" : 23 Documents clear
PERANCANGAN SISTEM DIGESTER BIOGAS PADA SKALA RUMAH TANGGA Mauludi, Mohammad Zidan; Dhofir, Moch.; Yudaningtyas, Erni
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The main focus of this journal is the design of a household-scale biogas digester system. The research method begins with a literature study, followed by a survey of the research location, data collection of biomass weight, analysis of biomass weightdata at the household scale, analysis of biomass weight data at the village scale, and finally drawing conclusions and providingrecommendations. The results of this thesis include, firstly, on a household scale, the maximum biomass weight obtained includescow manure weighing 47.4 kg per day and goat manure weighing 11.648 kg per day, a C/N ratio of biomass of 19.93, a volume ofwater mixed with biomass of 123,920 cm³ per day, a potential biogas energy production of 2,478,400 cm³ per day, potential electricity that can be generated is 15.118 kWh per day, material requirements for building the biogas digester system include a total need for 2,266 bricks, 619.15 kg of cement, 2.18 m³ of sand, 133.64 L of water, 0.0916 m³ of fine aggregate, 0.11 m³ of coarse aggregate, 6” PVC pipe measuring 2.9572 m, 6” PVC sockets of 2 pieces, 1/2" galvanized steel pipe measuring 0.3154 m, 1/2" galvanized sockets of 1 piece, and 1/2" gas taps with 3/8” output of 1 piece with a construction cost of Rp. 5,445,973.43, a difference in potential electricity energy compared to electricity consumption of 7.9425 kWh per day, and the implementation of a combined scheme of PLN electricity installation with a biogas generator requires additional components such as a biogas generator, a 4A Miniature Circuit Breaker (MCB), an Auto Transfer Switch (ATS), and NYY cables 2 x 1.5 mm². Secondly, on a village scale, the maximum biomass weight obtained includes cow manure weighing 679.4 kg per day and goat manure weighing 294.112 kg per day, a C/N ratio of biomass of 20.52, a volume of water mixed with biomass of 2,094,080 cm³ per day, a potential biogas energy production of 41,881,600 cm³ per day, potential electricity that can be generated is 255.48 kWh per day, the number of biogas digester systems that can be built is 16 units with a construction cost of Rp. 87,135,571.84, and the cost difference of full PLN electricity compared to a combination of PLN and biogas is Rp. 10,362,268.80 or 79%. Keywords— biomass, biogas, conversion, biogas digester system.
ANALISA PERBAIKAN SUSUT ENERGI 20 kV PADA PENYULANG PRIORITAS JARINGAN DISTRIBUSI TEGANGAN MENENGAH DI PT. PLN (PERSERO) ULP SAMPANG Sydney, Agnes Amadea Rullynda; Dhofir, Moch.; Utomo, Teguh
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Population growth and economic activity in Sampang Regency have increased the demand for electricity, creating the need for an adequate power distribution system. Data from UID East Java shows that ULP Sampang had losses of 26.82% in August and 26.05% in September, consisting of technical and non-technical losses. To improve the efficiency of the distribution system in ULP Sampang, it is necessary to analyze and plan the addition of capacitor banks. This analysis will use the Newton-Raphson method in ETAP power flow analysis software. Meanwhile, to determine the location of addition of capacitor banks based on loss sensitivity and reactive power comparison. Among the 9 reinforcements connected to the Sampang substation, the Kedungdungreinforcement has the highest voltage drop value reaching 9.59%, based on the data analysis, condition 7 is the most optimal condition to install capacitors with the following capacity: 1.0914 MVAR at Bus-3, 1.0048 MVAR at Bus-4, 0.9436 MVAR at Bus-6, 0.8564 MVAR at Bus-8, 0.3572 MVAR at Bus-29, and 1.0944 MVAR at Bus-2. The addition of capacitors successfully reduced the voltage drop and power dissipation values up to Condition 7. However, in condition 8, there was an increase in active and reactive power because the capacitor banks were installed without using the loss sensitivity method, focusing only on the bus with the largest power loss. Index Terms— Voltage Drop, Active Power Loss, Capacitor Bank, Sensitivity Analysis, Norm, ETAP
KAJIAN TEKNIS INTEGRASI PHOTOVOLTAIC PADA PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO (PLTMH) KALI JARI UNTUK MENGATASI KEBUTUHAN DAYA PELANGGAN Siagian, Alfandri; Utomo, Teguh; Hasanah, Rini Nur
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Currently, the Kali Jari MHPP located in Gandusari district of Blitar has supplied as many as 28 customers with a maximum power on an installed load of 6.16 kVA. As time goes by, the number of residents in this village will increase. It is estimated that by 2050, there will be 58 customers that will be supplied by the PLTMH Kali Jari with a maximum power at installed load of 12.76 kVA. Therefore, it is necessary to carry out studies to make power additions to the installed capacity. Using a renewable energy source, the intensity of abundant solar radiation, the addition of power to the installed capacity can be achieved by using the hybrid Kali Jari MHPP system with a photovoltaic system. To meet the power shortage, the photovoltaic system is designed with other supporting components. The design of this photovoltaic system uses a module with a capacity of 300 Wp of 15 pieces, 48 V 100 Ah batteries of 4 pieces, Battery Control Regulator (BCR) with a maximum current of 70 A of 1 pieces, and a 3 phase inverter of 8 kW of 1 piece. Keywoards: Renewable Energy, MHPP, Photovoltaic, Hybrid System.
DESAIN DAN SIMULASI PENGENDALI BEBAN ELEKTRONIK UNTUK PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) KALI JARI Bernadine, Muhammad Zaidan; Utomo, Teguh; Nurwati, Tri
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pengendali Beban Elektronik atau Electronic Load Controller merupakan perangkat elektronik yang menggunakan komponen semikonduktor, dirancang untuk mengatur beban utama generator agar daya yang dihasilkan oleh generator sesuai dengan kapasitasnya sehingga nilai tegangan dan frekuensi sistem tetap terjaga. Desain dan simulasi dilakukan menggunakan perangkat lunak MATLAB Simulink. Hasil penelitian menunjukkan bahwa desain ELC yang dipilih meliputi tiga bagian, yaitu penyearah tiga fasa gelombang penuh, kontrol, dan beban komplemen. Penyearah tiga fasa gelombang penuh digunakan untuk mengatur arus yang mengalir ke beban komplemen dengan menggunakan komponen MOSFET berjumlah enam untuk mengatasi tiga siklus VRN, VSN, dan VTN. Kontrol ELC menggunakan metode yang mengacu pada teori p-q dan pengendalian modulasi arus (PWM). Beban komplemen digunakan untuk mengalirkan arus sisa yang tidak digunakan oleh beban utama yang pada penelitian inimenggunakan beban resistif 20,6 ohm. Simulasi dilakukan dengan membandingkan sistem jika menggunakan ELC dan tidak pada tiga kondisi, yaitu saat perubahan beban, beban nonlinier, dan beban tidak seimbang. Pada kondisi tidak menggunakan ELC dan dilakukan perubahan beban, semakin kecil beban konsumen yang terhubung generator maka semakin tidak stabil nilai daya, tegangan, dan frekuensi sistem. Namun, dengan penggunaan ELC maka nilai daya, tegangan, dan frekuensi dapat dipertahankan mendekati 1 pu. Pada kondisi beban non-linier, ELC berhasil memperbaiki nilai daya dari 0,52 pu menjadi 1,05 pu, tegangan dari 1,06 pu menjadi 1 pu, dan frekuensi dari 1,56 pu menjadi 1,009 pu. Pada kondisi beban tidak seimbang, ELC berhasil memperbaiki nilai daya dari 0,89 pu menjadi 1,05 pu, tegangan dari 1,06 pu menjadi 1 pu dan frekuensi dari 1,23 pu menjadi 1,009 pu. Kata kunci — Electronic Load Controller, Teori P-Q, Beban Komplemen, Penyearah Tiga Fasa Gelombang Penuh.
PENERAPAN METODE OVERMODULASI UNTUK MENAMBAH JANGKAUAN KECEPATAN PERMANENT MAGNET SYNCHRONOUS MOTOR (PMSM) Amiruddin, M. Fero; Djuriatno, Waru; Nurwati, Tri
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Permanent Magnet Synchronous Motor (PMSM) is a type of electric motor frequently used in electric vehicles due to its reliability and efficiency. However, electric vehicles have a maximum speed limit caused by the Back Electromotive Force (BEMF), which prevents further torque generation. The Overmodulation method is chosen to enhance the maximum speed of PMSMs. Byemploying overmodulation, the inverter output voltage will be higher than using ordinary SVPWM. This voltage increase allows the current to flow for a longer duration, generating torque and thus extending the speed range of the PMSM. This study utilized the PLECS software for simulation. The results revealed a 13.7% increase in RMS voltage, a 40.7% increase in current, higher power output, a 1.08% increase in speed range, and a 1007% increase in electrical torque. Overmodulation enhances voltage, current, power, and speed range without altering the components. Keywords: SVPWM, Overmodulation, BEMF, Motor Speed, PLECS
ANALISIS EFISIENSI TRANSFORMATOR DISTRIBUSI DI PT. SADHANA Pratama, Muhammad Arkan Restu; Dhofir, Moch.; Nurwati, Tri
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Currently, electrical energy is one of the main needs in everyday life, so the quality of electrical energy that reaches consumers’ needs to be considered. This is related to the efficiency of the distribution transformer. The analysis methods that can be used to determine the efficiency of the distribution transformer are the transformer loading percentage analysis method, load imbalance analysis, transformer total loss analysis, and transformer efficiency analysis. In this study, the authors collected current data and total power data on 2 distribution transformers at PT Sadhana, Indonesia. The result of this study is that the highest totaltransformer loss value occurs in transformer 1 with a value of 9,62 kW and a load current of 1704,29 A. While the lowest total loss value occurs in transformer 2 with a value of 5,74 kW and a load current of 1151,43 A. The highest transformer efficiency occurs in transformer 2 which is 99,23% with a transformer load percentage of 39,89%. While the lowest transformer efficiency occurs in transformer 1 with a value of 99,12% and a transformer load percentage of 59,14%. From all the analysis results, it is known that the load current is directly proportional to the total loss of the transformer, and the transformer efficiency is at its nominal value when the transformer loading is in the range of 40%-80%. Keywords: Distributing Transformer, Percentage of Loading, Load Imbalance, Transformer Total Losses, Transformer Efficiency.
DESAIN SISTEM KONTROL SUHU MENGGUNAKAN PID CASCADE DAN SAFETY PADA COLD STORAGE MENGGUNAKAN REFRIGERAN HIDROKARBON Hariyanto, Arya Dwijaya; Rusli, Moch.; Yudaningtyas, Erni
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cold storage is a room for storing a product with a temperature that can be adjusted to suit the needs of the product. Properstorage is recommended to maintain product quality in the hands of consumers. The freshness of the product on delivery depends on temperature being less than 25oC. This study was conducted with the aim of observing the effect of storage temperature on the quality of products during shipment from the manufacturer to the hands of the consumer. Analysis of product storage on cold storage can maintain freshness and good quality of product. To condition the room temperature in the required batas, cold storage uses a steam compression refrigeration system to cool it down. Refrigeration can also be said to be a process of transferring heat from a material or room to another material or room (Ilyas, 1993). Hydrocarbon refrigerants are a sustainable solution as an environmentally friendly alternative, but have flammable properties. In order to overcome the risk of potential fire, advanced safety technologies such as PLC (Programmable Logic Controller) are required. The system is designed to be able to control temperature using the Ziegler-Nichols PID tuning method. To control it, a secondary controller (control valve) and a primary controller (temperature) are needed, where in this research the first Ziegler-Nichols method was used.The PLC programming method in this research is used for security purposes. The system is designed to be able to automaticallystop in cases of leaks. The test results show that the system can run according to the limits set with high pressure values of 161-249, low pressure 17-29, current <50, and voltage <380. Thus, PLC technology not only increases operational efficiency, but also ensures that the use of hydrocarbon refrigerants is carried out with the maximum level of safety. Keywords: refrigeran, cold storage, safety, temperature, cascade
ANALISIS PENGARUH FLUKTUASI BEBAN TERHADAP EFISIENSI GENERATOR PT PLN NUSANTARA POWER PEMBANGKIT PAITON UNIT 1 DAN 2 Himam, Fanisha Laila; Utomo, Teguh; Hasanah, Rini Nur
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT PLN Nusantara Power Pembangkit Paiton Unit 1 dan 2 adalah salah satu pembangkit listrik tenaga uap terbesar di Indonesia. Pembangkit ini memiliki peran penting dalam menyediakan pasokan daya dan menyalurkannya untuk konsumen wilayah Jawa Timur dan Bali. Dengan cakupan konsumen yang sangat luas di kedua wilayah ini, permintaan akan daya listrik sangat bervariasi tergantung pada aktivitas mereka. Akibat dari variasi permintaan ini, beban pada pembangkit listrik tidak pernah tetap, melainkan selalu berubah dari waktu ke waktu. Namun, karena energi listrik tidak dapat disimpan dalam jumlah besar maka pembangkit harus menghasilkan daya sesuai dengan permintaan konsumen. Generator memainkan peran penting dalam menyediakan pasokan daya tersebut, tetapi adanya fluktuasi beban yang berubah-ubah dari waktu ke waktu dapat memengaruhi efisiensi generator. Penelitian ini difokuskan untuk menganalisis bagaimana fluktuasi beban yang dialami oleh generator unit 1dan 2 PT PLN Nusantara Power Pembangkit Paiton berdampak terhadap efisiensi generator tersebut. Metode regresi akandigunakan untuk mengidentifikasi hubungan antara fluktuasi beban dan efisiensi generator. Hasil dari penelitian ini adalahfluktuasi beban memiliki pengaruh terhadap efisiensi generator. Berdasarkan analisis hubungan antara efisiensi terhadap perubahan beban pada generator unit 1 dan 2 PT PLN Nusantara Power Pembangkit Paiton, ketika beban generator fluktuatif pada rentang 50% hingga 90% dari beban nominal generator, ditemukan bahwa efisiensi generator relatif konstan sekitar 98%.Efisiensi tertinggi yang dicapai oleh generator unit 1 mencapai 98,27%, yang terjadi pada saat beban 319,061 MVA pada tanggal11 April 2023 pukul 06.00, dan efisiensi terendah sebesar 98,09%, yang terjadi saat beban 235,805 MVA pada tanggal 16 April 2023 pukul 22.00. Sedangkan, efisiensi tertinggi yang dicapai oleh generator unit 2 mencapai 98,3%, yang terjadi pada saat beban 341,458 MVA pada tanggal 14 April 2023 pukul 14.00, dan efisiensi terendah sebesar 98,09%, yang terjadi saat beban 231,864 MVA pada tanggal 15 April 2023 pukul 14.00. Kata Kunci: PT PLN Nusantara Power Pembangkit Paiton Unit 1 dan 2, generator, fluktuasi beban, efisiensi, metode regresi.
REKONFIGURASI JARINGAN LISTRIK TEGANGAN RENDAH PADA PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) KALI JARI Rahardjo, Muhammad Farid; Utomo, Teguh; Hasanah, Rini Nur
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Kali Jari berlokasi di Desa Gadungan, Kecamatan Gandusari, Kabupaten Blitar. Distribusi beban masing-masing fasa pada jaringan listrik tegangan rendah pada PLTMH Kali Jari masih belum merata, dimana beban berlebih pada fasa R sedangkan beban fasa T hanya dimanfaatkan untuk penerangan rumah pembangkit saja. Jatuhtegangan pada jaringan PLTMH Kali Jari mendekati batas toleransi yang diizinkan oleh PLN . Maka dari itu diperlukan rekonfigurasi atau penataan ulang jaringan dan usaha penyetimbangan beban tiap fasa untuk memperkecil nilai rugi daya dan jatuh tegangan pada jaringan PLMTH Kali Jari. Analisis aliran daya dengan metode Gauss Seidel dan simulasi dengan ETAP19.0.1 dilakukan untuk mengetahui nilai rugi daya dan jatuh tegangan pada jaringan. Berdasarkan hasil perhitungan dan simulasi didapatkan total rugi daya pada jaringan lama yaitu 119.19 W atau 5.96%, lalu jatuh tegangan pada masingmasing fasa yaitu, fasa R 13.07 V, fasa S 10.28 V, dan fasa T 0.01 V atau dalam bentuk persen yaitu, fasa R 5.94 %, fasa S 4.67%, dan fasa T 0.01%. Sedangkan total rugi daya pada jaringan baru yaitu 86.68 W atau 4.41%, lalu jatuh tegangan pada masing-masing fasa yaitu, fasa R 8.00 V, fasa S 8.35 V, dan fasa T 7.84 V atau dalam bentuk persen yaitu, fasa R 3.64 %, fasa S 3.80%, dan fasa T 3.56%. Setelah penyetimbangan beban, terjadi peningkatan kualitas listrik pada jaringan baru PLTMH Kali Jari, dimana terdapat penurunan totalrugi daya sebesar 32.5107 W dan terdapat penurunan nilai jatuh tegangan pada fasa R dan S, namun terdapat kenaikan nilai jatuhtegangan pada fasa T. Jatuh tegangan fasa R pada jaringan lama masih lebih tinggi dibanding fasa S dan fasa T, sedangkan jatuhtegangan masing-masing fasa pada jaringan baru sudah merata di 4%. Ketidakseimbangan beban pada jaringan lama masih sangat besar, yaitu 54.52%, sedangkan pada jaringan baru sudah kecil, yaitu 0.62%. Kata Kunci: PLTMH, Rekonfigurasi, Jaringan Radial, Metode Gauss Seidel, ETAP 19.0.1, Rugi Daya, Jatuh Tegangan.
ANALISIS PERHITUNGAN SUSUT ENERGI TEKNIS PADA SISTEM JARINGAN DISTRIBUSI TEGANGAN MENENGAH PENYULANG NOVOTEL GARDU INDUK KUTA Assariy, Muhammad Faiz; Utomo, Teguh; Hasanah, Rini Nur
Jurnal Mahasiswa TEUB Vol. 12 No. 3 (2024)
Publisher : Jurnal Mahasiswa TEUB

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Susut energi merupakan salah satu ukuran efisien atau tidaknya suatu pengoperasian suatu jaringan sistem distribusi. Susut energi adalah kerugian energi akibat masalah teknis dan non teknis pada penyaluran energi listrik. Biasanya perhitungan susut energi pada sistem jaringan distribusi dilakukan dengan menggunakan selisih energi terjual dengan yang diterima pada setiappenyulang. Pada penelitian ini dilakukan perhitungan susut energi teknis yang lebih rinci, yaitu dengan menghitung susuttransformator distribusi dan susut konduktor pada penyulang dan juga susut non teknis yang dihitung melalui selisih antara susut energi total penyulang dan total susut energi teknis. Penelitian ini dilakukan di Penyulang Novotel Gardu Induk Kuta PLN UP3 Mataram. Dari hasil perhitungan didapatkan susut energi teknis pada Penyulang Novotel adalah sebesar 34.896,22 kWh dansusut energi non teknis sebesar 1.396,778 kWh, sehingga susut energi total dari Penyulang novotel sebesar 36.293 kWh atausebesar 7,3 %. Susut energi pada Penyulang Novotel masih berada pada standar PLN dimana menurut Standar PLN (SPLN)D3.002-2 2008 yang menyatakan bahwa susut energi boleh terjadi dengan nilai maksimal 5% s.d 10%.Susut energi PenyulangNovotel dalam jangka waktu satu tahun diperkirakan sebesar 441.557,83 kWh. Kata kunci - Energi Lsitrik, Susut Energi, Susut Teknis, Susut Transformator, Susut Konduktor

Page 1 of 3 | Total Record : 23


Filter by Year

2024 2024


Filter By Issues
All Issue Vol. 14 No. 1 (2026) Vol. 13 No. 7 (2025) Vol. 13 No. 6 (2025) Vol. 13 No. 5 (2025) Vol. 13 No. 4 (2025) Vol. 13 No. 3 (2025) Vol. 13 No. 2 (2025) Vol. 13 No. 1 (2025) Vol. 12 No. 6 (2024) Vol. 12 No. 5 (2024) Vol. 12 No. 4 (2024) Vol. 12 No. 3 (2024) Vol. 12 No. 2 (2024) Vol. 12 No. 1 (2024) Vol. 11 No. 6 (2023) Vol. 11 No. 5 (2023) Vol. 11 No. 4 (2023) Vol. 11 No. 3 (2023) Vol. 11 No. 2 (2023) Vol. 11 No. 1 (2023) Vol. 10 No. 6 (2022) Vol. 10 No. 5 (2022) Vol. 10 No. 4 (2022) Vol. 10 No. 3 (2022) Vol. 10 No. 3 (2022): Vol. 10 No. 2 (2022) Vol 10, No 2 (2022) Vol 10, No 1 (2022) Vol 9, No 8 (2021) Vol 9, No 7 (2021) Vol 9, No 6 (2021) Vol 9, No 5 (2021) Vol 9, No 4 (2021) Vol 9, No 3 (2021) Vol 9, No 2 (2021) Vol 9, No 1 (2021) Vol 8, No 5 (2020) Vol 8, No 4 (2020) Vol 8, No 3 (2020) Vol 8, No 2 (2020) Vol 8, No 1 (2020) Vol 7, No 7 (2019) Vol 7, No 6 (2019) Vol 7, No 5 (2019) Vol 7, No 4 (2019) Vol 7, No 3 (2019) Vol 7, No 2 (2019) Vol 7, No 1 (2019) Vol 6, No 7 (2018) Vol 6, No 6 (2018) Vol 6, No 5 (2018) Vol 6, No 4 (2018) Vol 6, No 3 (2018) Vol 6, No 2 (2018) Vol 6, No 1 (2018) Vol 5, No 6 (2017) Vol 5, No 5 (2017) Vol 5, No 4 (2017) Vol 5, No 3 (2017) Vol 5, No 2 (2017) Vol 5, No 1 (2017) Vol 4, No 8 (2016) Vol 4, No 7 (2016) Vol 4, No 6 (2016) Vol 4, No 5 (2016) Vol 4, No 4 (2016) Vol 4, No 3 (2016) Vol 4, No 2 (2016) Vol 4, No 1 (2016) Vol 3, No 7 (2015) Vol 3, No 6 (2015) Vol 3, No 5 (2015) Vol 3, No 5 (2015) Vol 3, No 4 (2015) Vol 3, No 3 (2015) Vol 3, No 2 (2015) Vol 3, No 1 (2015) Vol 2, No 7 (2014) Vol 2, No 6 (2014) Vol 2, No 5 (2014) Vol 2, No 4 (2014) Vol 2, No 3 (2014) Vol 2, No 3 (2014) Vol 2, No 2 (2014) Vol 2, No 2 (2014) Vol 2, No 1 (2014) Vol 1, No 5 (2013) Vol 1, No 4 (2013) Vol 1, No 3 (2013) Vol 1, No 2 (2013) Vol 1, No 1 (2013) Vol 1, No 1 (2013) More Issue