cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 949 Documents
Peningkatan Efisiensi Pendistribusian Barang Melalui Optimasi Pengalokasian Moda Transportasi Darat Pada PT. X Saputra, Felicia; Widyadana, I Gede Agus
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This research is originated from the current efficiency level of product distribution in PT. X which is considered low. This motivates the company to consider other transportation to distribute their products, which is train. PT. X sees train as a new opportunity as now there is double track in the system. On the other hand, train tends to have cheaper delivery costs than truck as the delivery distance increase. Method used to analyze the efficiency of both transportations is simulation. Observation has been made and the results shows that 50,55% of delivery route in Java and 77,97% of delivery route from Java to Sumatera can be replaced by train. Improvement and solution has also been proposed as a support for train distribution system so that the increase of overall efficiency can be achieved. The analyze of the system improvement shows result that the use of two point railway stations will reduce overall cost by 4,70%, while the use of three point railway stations will save overall costs by 5,02%. 
Perhitungan dan Upaya Peningkatan Output Rate di PT. X Soegiarto, Gary Limanto; Bendatu, Liem Yenny
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X hasn’t yet measured output rate in production process, so company would like to measure the actual output rate. The measurement and effort to increase the output rate is performed for Merbau, Bangkirai, and Torem wood species on Line Preparation that consists of Planer, Crosscut, and Ripsaw process. Actual output rate in Planer for each wood species are respectively 0,0676, 0,0510, dan 0,0565 m3/menit. Actual output rate in Crosscut for each wood species are respectively 0,0260, 0,0298, dan 0,0257 m3/menit. Actual output rate in Ripsaw for each wood species are respectively 0,0305, 0,0315, dan 0,0318 m3/menit. This actual output rate is not optimal yet, could be seen from the Availability Ratio on Line Preparation that’s below World Class Company’s Availability Ratio (90 %). Availability Ratio in Planer for each wood species are respectively 72.60%, 81.91%, and 82.96%. Availability Ratio in Crosscut for each wood species are respectively 62.89%, 67.93%, and 64.08%. Availability Ratio in Ripsaw for each wood species are respectively 73.99%, 74.34%, and 74.33%. The effort to increase the output rate is then compiled such as design of additional tools for production machines, Work Instruction arrangement, and layout change in Line Preparation.
Penurunan Tingkat Kecacatan di PT Bondi Syad Mulia Mbau, Ricky Leonardo; Yang Aysia, Debora Anne
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Abstract: Bondi Syad Mulia is a company which offer the hot dip galvanizing services. Data of disability during the month of April showed that the number of defects that occurred amounted to 12.71%. The aim of this study is to provide a proposal to decrease the number of defects that occur in galvanizing products. There are four (4) types of disability to be studied are bare spots, delamination, welding blowouts, and drainage spikes. Efforts to reduce the level of disability is done by following the steps DMAIC (Define, Measure, Analyze, Improve, and Control). Tools that are used to manage and analyze data is check sheet, pareto chart and fishbone diagrams. Proposed improvements given the company is to make work instructions and records of operators who perform the oven; conduct inspections to check the levels of aluminum in the kettle fluxing by using the inspection form; checking the finished iron or steel in sand blasting and keep records regarding the results obtained in the form of checking; as well as the addition to the initial inspection to check initial thickness and welding conditions on iron or steel. Keywords: Quality, DMAIC, Checksheet, Pareto charts, Fishbone diagrams.
Audit dan Manajemen Energi pada Hotel Quest Widjaja, Stevanus; Panjaitan, Togar
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Quest Hotel previously has not been taking any measurements of energy use that they use for this both in terms of management and technology side. Therefore, this new hotel is relatively have new target for measuring their energy use. After measuring the energy use, it is detected that the use of energy in the Hotel Quest indicate a waste of energy. The benchmark standard of the measurement calculation is IKE or Intensity of Energy Consumption. The proposal will be concentrated in energy saving in the form of replacement lamps, replacement refrigerator until replacement actuator is an effort made to save energy.
Penerapan Tools Integrasi Perencanaan Produksi Pada Departemen Production Planning and Inventory Control PT. FSCM Manufacturing Indonesia Liman, Alvin; OCTAVIA, TANTI
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The purpose of this study was to determine the impact of integrated production planning to PPIC Department. Main problems of PT. FSCM Manufacturing Indonesia were the high cost of Heat Treatment Workstation and the loss of control from PPIC Department to manufacturing area. The high cost of Heat Treatment Workstation caused by the setup time/ dandori time of each type of component being processed. The daily production load resulted in repetition of setup time/ dandori time. The loss of control from PPIC Department to manufacturing area also caused higher level of WIP components resulted in the holding cost of this WIP components. Improvement given was to implement new production planning system with daily production load around 10 days in Heat Treatment Workstation and take a control to PPIC Department in manufacturing area .The results showed that integrated production planning to PPIC Department could reduce manufacturing cost of Heat Treatment Workstation and reduce the WIP levels. The reduction of production cost at Heat Treatment Workstation is about Rp. 236.448.747,00. The reduction of WIP levels could give the potential benefit around  Rp. 2.984.382,53.
Peningkatan Aktivitas Value Added Support Function dengan Metode Sampling Kerja di PT. Schneider Electric Manufacturing Batam Saputro, Rinaldi Edo; Octavia, Tanti
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Currently, support function units of PT.SEMB cannot reach their target of performances.Therefore, in this research PT SEMB attempts to evaluate the causes of it. Work samplingmethod is applied for three of support function units. The result shows the proportion ofthe team leader’s, line inspector’s, and line trainer’s value added are 75.04%, 78.16%, and84.19%, respectively. The highest proportion of non value added activities is movement. It occurssince PT.SEMB doesn’t have a working guidance. The proposed improvements are designing achecklist, job rotation procedure, and the guidance for reviewing a job description. The implementationresult shows the proportion of the value added for team leader and line inspector are85.88% and 84.98%
Perancangan Sistem Kanban Pada Line Machining Yoke Di PT. Inti Ganda Perdana Hartono, Evan; Bendatu, Liem Yenny
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This paper discusses about the change of yoke line system production. Yoke line production uses push system, which is DPS (Daily Production Schedule) and assembling line process uses pull system, which is kanban. Pull system and push system in one flow process can cause problem in inventory fluctuation. The goal of this research is to change the production system yoke machining at PT Inti Ganda Perdana from current sistem DPS into kanban system. This change is done by using Part Information Flow Chart (PIFC) to illustrate the production flow and the formulation to compute the circulation of kanban population each month. The use of kanban cards will make yoke line production  become pull system
Efisiensi Sistem Tunjangan Kesehatan Karyawan PT X Hartono, Vicky; palit, herry christian
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT X is a manufacture company that provides medical facilities for its permanent employee in form of medical benefits. The medical benefits claim proposed by the employees will be processed in PT X’s medical benefits system. The company requires that at least 98% of the claims are processed on the same day as the day those claims are proposed. That requirement can only be fulfilled with overtime work. The average of overtime work per month per admin is 14 hours. The improvement of the efficiency can be done by doing enhancement of the approval and revise processes of the previous medical benefits system. The enhancement is done by creating unique key and barcode for each medical claim, so that each of the new claim form is going to have unique key and barcode. HR admin would be able to do scan barcode process that would accelerate PT X’s medical benefits system. The result of the implementation of this enhancement is the acceleration of medical benefits system of PT X. The implementation results in the decrease of the process time as much as 31% of the prior condition and the investment fund will have returned in less than three months.
Peningkatan Perilaku Aman di PT. XXX dengan Pendekatan Behavior Based Safety Mokaliran, Chintia; Panjaitan, Togar W.S
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

 PT. XXX has applied Health Safety Enviroment system, but still experienced relatively high level of accidents. The accident number was up to 11 out of a total worker of 390 in 2014. PT XXX would like to decrease to zero accident so as the production process runs smoothly.The method used in this problem was Behavior Based Safety. BBS method provides training for the worker to behave safely. This method gave good results in that all processes had an average of 80% safety behavior. BBS changed many dangerous behavior to become safety behavior, but there is still a dangerous behavior that cannot be changed.
Upaya Penurunan Tingkat Kecacatan Produk dengan Metode DMAIC di PT. X Sunjono, Amelia Agnes; Halim, Siana
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This research aims to discover the factors that influences and causes any defects on hollow products of PT. X. We applied DMAIC method to solve the problems. Pareto Chart and Fishbone are utilized for prioritizing and Fishbone discovering the root of the problem, consecutively. As the results, the recommendations that can be given are standardization on some processes such as patri, cukit, and drying, periodical cleaning and maintanance on the machines, calibration on the micrometer, utilizing box for storing the goods, and provide a specific training for the operators in the rangkai and patri departments.