cover
Contact Name
ANDIKA SETIAWAN
Contact Email
andika.setiawan@umj.ac.id
Phone
+6281283964089
Journal Mail Official
konstruksia@umj.ac.id
Editorial Address
Gedung Teknik Sipil, Fakultas Teknik Universitas Muhammadiyah Jakarta. Jl. Cempaka Putih Tengah 27, Jakarta Pusat
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Konstruksia
ISSN : 20867352     EISSN : 2443308X     DOI : http://dx.doi.org/10.24853/jk.12.2.14-23
Core Subject : Engineering,
Lingkup Jurnal 1. Struktur 2. Keairan 3. Manajemen Proyek dan Konstruksi 4. Material 5. Transportasi 6. Geoteknik
Articles 416 Documents
FAKTOR-FAKTOR YANG MEMPENGARUHI AUDIT TEKNIK DAN FINANSIAL PADA PROYEK KONSTRUKSI Deka Yudhit Maristyo P.; Sarwono Hardjomuljadi
Konstruksia Vol 10, No 1 (2018): Jurnal Konstruksia Vol 10 No. 1 Tahun 2018
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (341.322 KB) | DOI: 10.24853/jk.10.1.23-38

Abstract

ANALISIS KELAYAKAN PROYEK INVESTASI DENGAN MENGGUNAKAN INTERNAL RATE OF RETURN (IRR) Endy Arif Budyanto
Konstruksia Vol 2, No 2 (2011): Jurnal Konstruksia Vol. 2 No. 2 Tahun 2011
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jk.2.2.%p

Abstract

ABSTRAK: Sebagian besar negara berkembang pemerintah sendiri sebagian besarinfrastruktur yang diperlukan bagiperkembangan mereka (Bank Dunia, 1994), dan juga seperti di Indonesia, banyak proyek-proyek sia-sia di hariini. Kebanyakan kegagalan dalam proyek investasi infrastruktur disebabkan oleh kesalahan perencanaan awal.Kegagalan utama yang sering dilakukan oleh pemerintah adalah mereka tidak dapat memilih proyek infrastrukturyang dapat memecahkan masalah orang-orang mereka dan sesuai dengan anggaran yang tersedia mereka.Banyak investasi infrastruktur proyek dilaksanakan dengan hanya alasan pragmatis atau tidakmengukur pertimbangan, karena banyak proyek tidak terselesaikan atau tidak sesuai dengan harapan masyarakatyang akhirnya akan merugikan investasi secara keseluruhan. Berbasis proyek analisis ekonomi dan keuangan adalahsalah satu cara untuk mengurangi risiko kegagalan-kegagalan.Tujuan dasar dari analisis berbasis proyek ekonomi dan keuangan adalah untuk membantu merancang dan memilihproyek yang berkontribusi pada kesejahteraannegara dan rakyatnya. Biaya-manfaat dan terkait pendekatan penilaianekonomi diterapkan untuk menentukan keuntungan tertinggi untuk investasi dalam proyek,memfasilitasi perbandingan rasional pilihan yang tersedia dan memastikan bahwa keputusan investasi bertanggungjawab. Analisis ekonomi juga berpotensi berguna dalam mengidentifikasi dan mengklarifikasi isu yang terlibat dalammembuat keputusan-keputusan tertentu. Internal Rate of Return (IRR) menjadi salah satu pilihan dari analisis inikarena hasilnya dapat digunakan sebagai indikator efisiensi investasiKata kunci: proyek investasi, analisis ekonomi dan keuangan, tingkat pengembalian internal
ANALISIS TINGKAT KEPUASAN PENGGUNA JASA KONSTRUKSI TERHADAP PENERAPAN SISTEM MANAJEMEN MUTU ISO 9001:2008 DI PERUSAHAAN JASA KONSTRUKSI Henny Yunita; Anton Soekiman
Konstruksia Vol 8, No 1 (2016): Jurnal Konstruksia Vol 8 No. 1 Tahun 2016
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (904.475 KB) | DOI: 10.24853/jk.8.1.35-46

Abstract

ANALISIS PEMAMPATAN SEKUNDER PADA TANAH GAMBUT JAMBI DENGAN METODE GIBSON-LO Tanjung Rahayu
Konstruksia Vol 4, No 1 (2012): Jurnal Konstruksia Vol. 4 No. 1 Tahun 2012
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2115.766 KB) | DOI: 10.24853/jk.4.1.%p

Abstract

ANALISIS PEMILIHAN MODEL KONTRAK FIDIC RAINBOW CONTRACT 2017 PEKERJAAN PEMBANGUNAN DERMAGA (KAJIAN DARI SUDUT PANDANG PENGGUNA JASA) Anom Wibisono; Sarwono Hardjomuljadi
Konstruksia Vol 9, No 2 (2018): Jurnal Konstruksia Vol 9 No. 2 Tahun 2018
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (301.482 KB) | DOI: 10.24853/jk.9.2.15-24

Abstract

KORELASI PENERAPAN ILMU TEKNIK, ILMU EKONOMI DAN KEAHLIAN TEKNIK DALAM PROBLEMATIK PROYEK KONSTRUKSI Yul Achyar Alfa
Konstruksia Vol 1, No 1 (2010): Jurnal Konstruksia Vol. 1 No. 1 Tahun 2010
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24853/jk.1.1.%p

Abstract

Proyek adalah suatu keseluruhan aktifitas atau kegiatan yang menggunakan sumber-sumber (dana, daya dan lain-lain) untuk mendapatkan manfaat pada masa yang akan datang dan yang dapat direncanakan dibiayai dan dilaksanakan sebagai suatu unit aktifitas untuk mencapai tujuan dan mempunyai suatu titik akhir (ending point). Pada dekade tahun 60-an dan sebelumnya, umumnya para tenaga teknik (insinyur) melibatkan dirinya dengan pekerjaan-pekerjaan perencanaan konstruksi, perhitungan-perhitungan dan lain sebagainya, kurang sekali perhatiannya terhadap sumber-sumber daya atau tenaga baik yang berasal dari manusia maupun sumber alam yang menghasilkan produk-produk akhir. Bidang usaha semakin lama semakin kompetetif, akibatnya para insinyur memainkan peran yang semakin bertambah penting dalam pengelolaan dan beberapa keputusan yang dibuat oleh para insinyur menyangkut faktor ekonomi. Para insinyur sebagai ahli teknik dalam melakanakan suatu proyek diahadapan dengan persoalan penerapan ilmu teknik, ilmu ekonomi serta keahlian teknik dalam permasalahan proyek untuk mengambil suatu keputusan. Segi proses keahlian teknik yang mencoba mempelajari kebutuhan-kebutuhan manusia, memerlukan tidak hanya suatu pengetahuan saja (batasan-batasan kemampuan teknik), tetapi memerlukan juga pengetahuan umum seperti sosiologi, psikologi, politik, ekonomi dan lain-lain dimana pengetahuan ini sangat berguna dan penting dalam banyak cabang ilmu pengetahuan teknik modern. Pengetahuan tentang Net Present Value, Internal Rate of Return dan Net Benefit-Cost Ratio sangat diutamkan dan merupakan hal yang mutlak dikuasai agar investasi yang diutamakan dapat mencapai sasaran sesuai dengan prinsip ekonomi dan teknik.Keahlian teknik yang selalu berhadapan dengan lingkungan fisik, berlangsung terus menerus untuk memenuhi kebutuhan umat manusia yang timbul dalam suatu lingkungan ekonomi.
ANALISA KINERJA BUNDARAN MENGGUNAKAN METODE MANUAL KAPASITAS JALAN INDONESIA (MKJI) (SUDI KASUS : BUNDARAN RADIN INTEN BANDAR LAMPUNG) Weka Indra Dharmawan; Hanif Syahroni
Konstruksia Vol 7, No 2 (2016): Jurnal Konstruksia Vol 7 No. 2 Tahun 2016
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (857.398 KB) | DOI: 10.24853/jk.7.2.%p

Abstract

EPC/TURNKEY CONTRACT, LUMPSUM FIXED PRICE SUBJECT TO ADJUSTMENTS Sarwono Hardjomuljadi
Konstruksia Vol 6, No 2 (2015): Jurnal Konstruksia Vol 6. No. 2 Tahun 2015
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (542.153 KB) | DOI: 10.24853/jk.6.2.%p

Abstract

The most important thing before starting the construction project is deciding the type of contract will be used for the project’s implementation. In order to get the proper decision, the understanding on various conditions of contracts are required. In Indonesia there are many project using the so called “modified” FIDIC Conditions of Contract for EPC/Turnkey Project, but with the incorrect understanding on the reasons of using EPC/Turnkey Contract, so instead of solving the problem it may caused bigger problems in practice, many problems raised during the execution due to such incorrect understanding of the spirit of EPC/Turnkey Contract. Most of Employers, in this case the government institution or state owned enterprises in Indonesia, choose the EPC/Turnkey Contract with minimum understanding of the essence of the EPC/Turnkey Contract. Their reasons of choosing the EPC/Turnkey Contract was the “tied schedule” and the “higher certainty of cost”. FIDIC EPC/Turnkey Contract based on the discussion in this paper, instead of fit the Employer’s need only, the EPC/Turnkey Contract still give chance to the contractor to submit their claim (Clause 20) and even the price is fixed, payment could be made once the claim is accepted (Sub-Clause 17.4) means that additional to the contract price can be done. One of the important noteworthy thing is that if there is additional cost it should be “added to the contract price”, while in the conventional contract it should be “included in the contract price”, so the final price will be the same (Sub-Clause 14.1). Keyword: EPC/Turnkey Contract, tied schedule, higher certainty of cost, added, included.
PERENCANAAN PENAHAN TANAH 15 M DENGAN DINDING KANTILEVER DI PERIMETER SWICHYARD SKYLAND JAYAPURA Moch. Aswanto
Konstruksia Vol 11, No 1 (2019): Jurnal Konstruksia Vol 11 No. 1 Tahun 2019
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1151.435 KB) | DOI: 10.24853/jk.11.1.63-72

Abstract

Makalah ini menyajikan perencanaan Dinding Penahan Tanah (DPT) Kantilever Beton Bertulang, dengan aplikasi Geo5. Penggunaan perangkat lunak analitik geoteknik, diharapkan meningkatkan efisiensi man-hour insinyur dalam tahap perencanaan maupun revisi desain saat pelaksanaan fisik. Topiknya adalah desain DPT untuk ketinggian urugan tanah lebih dari 16m, sepanjang lebih dari 100m, yang mana kriteria struktur DPT harus relatif ringan (terkait daya dukung tanah) dan memanfaatkan bobot massa tanah yang menumpu di kaki (base) DPT untuk mengimbangi gaya lateral yang timbul. Proporsional bentuk DPT mengikuti guidance dari RSNI Geoteknik. Tinggi dinding (stem) h=10m, tebal w=1.1m~0.7m. Kaki (Base slab) tebal= 1m dan lebar=7.7m. Panjang keseluruhan DPT L=100m. Penyelidikan tanah, disamping parameter tanah seperti cu, unit weight, f dan klasifikasi tanah, informasi penting adalah kontur kedalaman lapisan utama yaitu lapisan tanah lempung dan irisannya dengan lapisan tanah berbatu. Hal ini untuk merencanakan tambahan pemancangan untuk menyalurkan beban gravitasi maupun lateral. Struktur DPT, dikontrol dengan Angka Keamanan terhadap overturning, slip, bearing-capacity, kecukupan penulangan. Kemudian analisa dan kontrol Angka Keamanan slope stability global terhadap beban gravitasi maupun kegempaan. Untuk mengalirkan air limpasan yang meresap dibelakang dinding,  DPT dilengkapi dengan urugan pasir dibelakang dinding sebagai bagian sistim drainase. Dibawah urugan pasir dipasang pipa yang mengalirkan air rembesan keluar area DPT, sehingga dapat dihindari kejenuhan tanah dibelakang dinding penahan tanah.
PERAN PENILAI AHLI DALAM PENANGANAN KEGAGALAN BANGUNAN DAN KEGAGALAN KONSTRUKSI (MENURUT UU NO 18 TAHUN 1999 JO PP 29 TAHUN 2000) Sarwono Hardjomuljadi
Konstruksia Vol 6, No 1 (2014): Jurnal Konstruksia Vol. 6 No. 1 Tahun 2014
Publisher : Universitas Muhammadiyah Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (344.812 KB) | DOI: 10.24853/jk.6.1.%p

Abstract


Filter by Year

2001 2025


Filter By Issues
All Issue Vol 16 No 2 (2025): Jurnal Konstruksia Vol 16 No. 2 Tahun 2025 Vol 16, No 1 (2024): Jurnal Konstruksia Vol 16 No. 1 Tahun 2024 Vol 15, No 2 (2024): Jurnal Konstruksia Vol 15 No. 2 Tahun 2024 Vol 15, No 1 (2023): Jurnal Konstruksia Vol 15 No. 1 Tahun 2023 Vol 14, No 2 (2023): Jurnal Konstruksia Vol 14 No. 2 Tahun 2023 Vol 14, No 1 (2022): Jurnal Konstruksia Vol 14 No. 1 Tahun 2022 Vol 13, No 2 (2022): Jurnal Konstruksia Vol 13 No. 2 Tahun 2022 Vol 13, No 1 (2021): Jurnal Konstruksia Vol 13 No. 1 Tahun 2021 Vol 12, No 2 (2021): Jurnal Konstruksia Vol 12 No. 2 Tahun 2021 Vol 12, No 1 (2020): Jurnal Konstruksia Vol 12 No. 1 Tahun 2020 Vol 11, No 2 (2020): Jurnal Konstruksia Vol 11 No. 2 Tahun 2020 Vol 11, No 1 (2019): Jurnal Konstruksia Vol 11 No. 1 Tahun 2019 Vol 10, No 2 (2019): Jurnal Konstruksia Vol 10 No. 2 Tahun 2019 Vol 10, No 1 (2018): Jurnal Konstruksia Vol 10 No. 1 Tahun 2018 Vol 9, No 2 (2018): Jurnal Konstruksia Vol 9 No. 2 Tahun 2018 Vol 9, No 1 (2017): Jurnal Konstruksia Vol 9 No. 1 Tahun 2017 Vol 8, No 2 (2017): Jurnal Konstruksia Vol 8 No. 2 Tahun 2017 Vol 8, No 1 (2016): Jurnal Konstruksia Vol 8 No. 1 Tahun 2016 Vol 7, No 2 (2016): Jurnal Konstruksia Vol 7 No. 2 Tahun 2016 Vol 7, No 1 (2015): Jurnal Konstruksia Vol 7. No. 1 Tahun 2015 Vol 7, No 1 (2015): Jurnal Konstruksia Vol 7. No. 1 Tahun 2015 Vol 6, No 2 (2015): Jurnal Konstruksia Vol 6. No. 2 Tahun 2015 Vol 6, No 2 (2015): Jurnal Konstruksia Vol 6. No. 2 Tahun 2015 Vol 6, No 1 (2014): Jurnal Konstruksia Vol. 6 No. 1 Tahun 2014 Vol 6, No 1 (2014): Jurnal Konstruksia Vol. 6 No. 1 Tahun 2014 Vol 5, No 2 (2014): Jurnal Konstruksia Vol. 5 No. 2 Tahun 2014 Vol 5, No 2 (2014): Jurnal Konstruksia Vol. 5 No. 2 Tahun 2014 Vol 5, No 1 (2013): Jurnal Konstruksia Vol. 5 No. 1 Tahun 2013 Vol 5, No 1 (2013): Jurnal Konstruksia Vol. 5 No. 1 Tahun 2013 Vol 4, No 2 (2013): Jurnal Konstruksia Vol. 4 No. 2 Tahun 2013 Vol 4, No 2 (2013): Jurnal Konstruksia Vol. 4 No. 2 Tahun 2013 Vol 4, No 1 (2012): Jurnal Konstruksia Vol. 4 No. 1 Tahun 2012 Vol 4, No 1 (2012): Jurnal Konstruksia Vol. 4 No. 1 Tahun 2012 Vol 3, No 2 (2012): Jurnal Konstruksia Vol. 3 No. 2 Tahun 2012 Vol 3, No 2 (2012): Jurnal Konstruksia Vol. 3 No. 2 Tahun 2012 Vol 3, No 1 (2011): Jurnal Konstruksia Vol. 3 No. 1 Tahun 2011 Vol 3, No 1 (2011): Jurnal Konstruksia Vol. 3 No. 1 Tahun 2011 Vol 2, No 2 (2011): Jurnal Konstruksia Vol. 2 No. 2 Tahun 2011 Vol 2, No 2 (2011): Jurnal Konstruksia Vol. 2 No. 2 Tahun 2011 Vol 2, No 1 (2010): Jurnal Konstruksia Vol. 2 No. 1 Tahun 2010 Vol 2, No 1 (2010): Jurnal Konstruksia Vol. 2 No. 1 Tahun 2010 Vol 1, No 1 (2010): Jurnal Konstruksia Vol. 1 No. 1 Tahun 2010 Vol 1, No 1 (2010): Jurnal Konstruksia Vol. 1 No. 1 Tahun 2010 Vol 10, No 2 (2010) Vol 10, No 2 (2001) More Issue