cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Rekayasa Sipil
Published by Universitas Brawijaya
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 551 Documents
Manajemen Lalu Lintas Pemindahan Pedagang Kaki Lima (PKL) Pada Kawasan Alun-Alun Kota Tegal Baharuddin, Alfan; Djakfar, Ludfi; Bowoputro, Hendi
Rekayasa Sipil Vol 9, No 2 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (284.441 KB)

Abstract

Salah satu permasalahan yang menurunkan fungsi dan kapasitas jalan di Kota Tegal adalah keberadaan PKL di tempat umum antara lain: 1) Trotoar,; 2) Bahu jalan; dan 3) Badan Jalan, yang berubah fungsi menjadi tempat berjualan PKL dan parkir oleh sebab itu perlu dilakukan manajemen lalu lintas pada kawasan alun-alun Kota Tegal. Penelitian ini bertujuan untuk mengetahui kinerja lalu lintas pada kawasan alun-alun kota Tegal. Lokasi penelitian yaitu pada kawasan alun-alun Kota Tegal. Penelitian ini dilaksanakan dengan menggunakan analisis MKJI dan Aplikasi perangakat lunak (Software), Contram Versi 5. Berdasarkan hasil analisa, skenario II (Jalan Pancasila dibagi untuk Lalu lintas dua arah, Pedagang Kaki Lima dan Pedestrian) dianggap skenario yang lebih baik dibandingkan skenario I (Penutupan Arus Lalu lintas Sebelah Barat Jalan Pancasila) untuk penempatan pedagang kaki lima pada saat manajemen rekayasa lalu lintas di lakukan, karena skenario II tingkat pelayanan kinerja lalu lintas di kawasan alun-alun kota tegal memiliki rata-rata nilai “B”, hanya pada jalan Kolonel Sudiarto memiliki nilai tingkat pelayanan “C”, baik saat kondisi sekarang (2015) maupun kondisi di masa yang akan datang (2020). 
Effectiveness Of Stone Columns As Countermeasure For Liquefiable Sandy Soil Stratum With Silt Intralayers Simatupang, Roland Martin; Chen, Huei- Tsyr; Lee, Chung- Jung
Rekayasa Sipil Vol 9, No 2 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (464.558 KB)

Abstract

Numerical simulation was used to investigate effectiveness of stone column as countermeasure for liquefiable sandy soil stratum with silt intralayers. One finite element model of sand and two models for silt cases were subjected to two different stone column areas. The use of stone columns can delay and reduce the accumulation of excessive pore water pressure; although in some cases liquefaction still cannot be avoided. Stone column increases the stiffness of the sand area and able to reduces the ground settlement; however this benefit decreases as the more silt intralayers exist in the stratum.
Evaluasi Kinerja Lajur Khusus Sepeda Dan Becak Di Jalan KH. Wahid Hasyim Kabupaten Jombang Abdiyah Amudi; Achmad Wicaksono; Imma Widyawati Agustin
Rekayasa Sipil Vol 9, No 2 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (694.071 KB)

Abstract

Seiring dengan pesatnya pembangunan di suatu kota maka kegiatan masyarakatpun akan meningkat pula. Sehingga diperlukan sarana dan prasarana yang dapat mendukung dan melayani pergerakan masyarakat dari satu tempat ketempat yang lainnya secara aman, cepat dan ekonomis. Permasalahan transportasi yang terjadi biasanya muncul karena kebutuhan transportasi lebih besar dari prasarana transportasi yang tersedia, sehingga menyebabkan tidak optimalnya penggunaan prasarana tersebut dan pada akhirnya muncul permasalahan transportasi berupa kemacetan lalulintas. Perkembangan pada sektor transportasi yang terjadi sekarang antara lain adanya lajur khusus sepeda dan becak di sepanjang Jalan KH. Wahid Hasyim Jombang. Penelitian ini bertujuan untuk mengetahui strategi apa yang tepat untuk meningkatkan kinerja lajur khusus sepeda dan becak di Jalan KH. Wahid Hasyim Jombang. Penelitian ini menggunakan analisis Scenario Planning dimana analisis ini berfungsi untuk mengkaji variabel-variabel yang berpengaruh terhadap strategi peningkatan kinerja lajur khusus sepeda dan becak yang akan diterapkan di jalan KH. Wahid Hasyim saat ini, dengan menggunakan alat analisis AHP (Analysis Hierarchi Process) untuk menentukan prioritas pengembangan yang dapat dilakukan kedepannya. Dari hasil analisis didapat adanya tundaan di lajur khusus sepeda dan becak di Jalan KH. Wahid Hasyim Jombang disebabkan oleh arus lokal yaitu adanya aktifitas perbelanjaan, perkantoran, dan pendidikan. Untuk menentukan skala prioritas berdasarkan empat kriteria (keamanan, kenyamanan, kesenangan dan daya tarik) didapat urutan bobot: keamanan 37,5 %, kenyamanan 22,6 %, daya tarik 22,4 % dan kesenangan 17 %. Sedangkan yang menjadi prioritas utama pemilihan alternatif peningkatan kinerja lajur khusus sepeda dan becak didapat urutan bobot yaitu: dibuat dibuat lajur sepeda (Bike Lane) yaitu sebesar 16,4 %, menyusul dibuat lajur sepeda (Bike Path), dan dibuat lajur sepeda (Bike Route). responden menganggap dengan lebar jalan 19 m penerapan bike lane sudah tepat di terapkan pada Jalan KH. Wahid Hasyim Jombang, karena pengguna kendaraan non-motorized bisa merasa aman saat berkendara tanpa merasa khawatir terganggu oleh pengendara bermotor dengan memilki lajur khusus untuk pengguna sepeda dan becak. 
Studi Eksperimental Hubungan Balok-Kolom Glulam Dengan Penghubung Batang Baja Berulir Hermanto, Rizfan
Rekayasa Sipil Vol 9, No 2 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1056.586 KB)

Abstract

Penelitian ini mempelajari perilaku hubungan balok-kolom glulam yang menggunakan batang baja berulir sebagai penghubung. Benda uji yang dibuat sebanyak 3 spesimen di mana glulam dibuat dengan kayu Meranti. Pengujian menggunakan UTM-Hung Ta dan LVDT untuk pembacaan peralihan. Hasil dari hubungan balok-kolom ini memiliki kekakuan rotasi elastik yang cukup besar yaitu 106.349 – 125.00 kNm/rad dan kekakuan rotasi inelastik antara 27.719 – 65.131 kNm/rad. Penggunaan batang baja berulir meningkatkan daktilitas sambungan di mana daktilitas dan faktor bi-linier yang diperoleh sebesar 2.071 - 2.53 dan 0.261 – 0.551 . Tipe kegagalan yang terjadi sesuai dengan prediksi ragam kegagalan kritis yaitu kerusakan pada blok geser kayu akibat gaya tarik yang ditimbulkan batang baja berulir pada serat tarik balok glulam.
Perhitungan Harga Satuan Pekerjaan Dinding Bata Ringan Dengan Metode SNI Dan Ms. Project Pada Proyek Pembangunan Gedung Laboratorium Enterpreneurship Terpadu Universitas Brawijaya Malang Kartika Puspa Negara; Saifoe El Unas; M. Hamzah Hasyim; Marchel Aditha
Rekayasa Sipil Vol 9, No 2 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (418.716 KB)

Abstract

Dalam sebuah proyek konstruksi baik dalam tahap perencanaan, pelaksanaan dan pengawasan sangat diperlukan manajemen konstruksi yang baik. Salah satu hal yang terpenting adalah perhitungan rencana anggaran biaya (RAB) dimana untung atau rugi sebuah proyek bergantung pada estimasi biaya pada awalnya. Pada saat ini metode yang sering digunakan  untuk membuat anggaran biaya adalah metode SNI. Pada saat ini kemajuan teknologi dalam pembangunan semakin cepat yang menyebabkan pekerjaan lebih ekonomis. Salah satu yang banyak digunakan adalah pekerjaan dinding bata ringan. Namun perhitungan estimasi yang masih banyak digunakan adalah dengan menggunakan metode SNI, dimana didalamnya tidak ada perhitungan analisa biaya untuk dinding bata ringan. Selain menggunakan metode SNI perhitungan analisa biaya dapat digunakan juga bantuan software Ms. Project. Sesuai dengan pengamatan yang dilakukan pada pehitungan analisa biaya dinding bata ringan pada proyek pembangunan gedung enterpreneurship terpadu Universitas Brawijaya Malang metode yang digunakan masih menggunakan metode SNI yang telah dimodifikasi sebiau kebutuhan. Hasil analisa biaya pekerjaan dinding bata ringan sesuai metode SNI yang telah dimodifikasi didapatkan sebesar Rp 2.432.360.251,27. Selain itu analisa biaya dihitung dengan menggunakan bantuan software MS. Project. Analisa biaya menggunakan MS. Project didasarkan pada penjadwalan proyek dan estimasi pekerja dan alat yang digunakan sesuai dengan kondisi di lapangan. Biaya total pada MS. Project didapatkan dari akumulasi biaya material, gaji pekerja, serta biaya alat yang digunakan pada proyek. Hasil perhitungan estimasi biaya pekerjaan dinding bata ringan dengan menggunakan metode MS. Project didapatkan sebesar Rp. 1.881.296.223,00. Selisih biaya total pekerjaan dinding bata ringan dengan kedua metode ini adalah sebesar Rp. 551.064.028,27. Penggunaan estimasi biaya dengan MS. Project didapatkan hasil yang lebih mendekati dengan keadaan di lapangan dan lebih realistis ktimbang menggunakan metode SNI.
Student Passengers’ Assessment On The Transsarbagita Bus Service Quality Wedagama, D.M Priyantha
Rekayasa Sipil Vol 9, No 3 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (502.183 KB)

Abstract

This study aims to investigate the impact of tangible, reliability, responsiveness, assurance, and empathy factors of TransSarbagita bus services based on student passengers’ perceptions and expectations. Two synthetic indices of CSI and HCSI are determined to identify influencing attributes on bus quality service. Both indices produce the same percentages of 32.7% showing low student passengers’ satisfactions. Quadrant Analysis suggests TransSarbagita bus services should be more concentrated on improving their punctual operations. This is urgently required to keep the existing customers and to attract more new passengers in particular, those students who may be shifted from motorcycle. The local government is highly recommended to accelerate the implementation of the bus network for the Sarbagita regions. 
Bending Moment Responses Of Bridge Pile Foundation In A Liquefiable Soil Stratum Underlain By Irregular Bedrock Under Earthquakes Ming Narto Wijaya
Rekayasa Sipil Vol 9, No 3 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (619.033 KB)

Abstract

In the past earthquakes, there have been many reports about damage to bridge’s pile foundations caused by soil liquefaction. The purpose of this study is to investigate the bending moment responses of pile foundations of a bridge pier in a liquefiable soil stratum underlain by irregular bedrock under earthquakes. In this study, the effect of irregular bedrock on the bending moment responses of pile is investigated using nonlinear three-dimensional effective stress finite element method. The slope variation of inclined lateral rock and local intrusion of bedrock and two types of connection between pile cap and piles were considered in the analysis: fixed connection and hinge connection. Three acceleration time-histories were used as input motion. From the parametric studies, it was found that the effect of irregular bedrock on the bending moment responses of pile depends on the characteristics of earthquake motions, location of pile within the pile group and sometimes the configuration of the irregular bedrock. Therefore, it is important to check the adequacy of pile foundation design using the earthquake motions measured at the construction site whose bedrock configuration should be determined as accurately as possible. 
Koreksi Pembacaan Ultrasonic Pulse Velocity (UPV) Terhadap Kesalahan Akibat Ketidakstabilan Posisi Tranducer Sugeng P. Budio; Ming Narto Wijaya; Eva Arifi; Putri Dewanti
Rekayasa Sipil Vol 10, No 1 (2016)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (399.653 KB)

Abstract

Pengawasan dalam bidang konstruksi bertujuan agar struktur bangunan laik fungsi, dan metode NonDestructive Test (NDT) telah banyak digunakan di Indonesia. Ultrasonic Pulse Velocity (UPV) merupakan salah satu alat NDT yang dapat digunakan untuk mengetahui kualitas kerapatan beton. Gangguan sinyal atau noise akibat ketidakstabilan posisi tranducer selama pembacaan dapat mengakibatkan kesalahan dalam pengukuran, oleh sebab itu perlu dibuat suatu formula koreksi pembacaan. Penelitian ini dilakukan terhadap tiga jenis benda uji, dan masing-masing dibuat menggunakan tiga nilai kuat tekan karakteristik. Setelah dilakukan pengukuran menggunakan UPV terhadap seluruh benda uji, didapatkan penyebaran data yang sangat beragam yang ditampilkan dalam diagram box whiskers. Namun tidak terlihat suatu pola sebaran yang konsisten yang dapat digunakan untuk melakukan regresi yang bertujuan untuk menurunkan formula koreksi. 
Studi Perencanaan Bangunan Utama Embung Guworejo Dalam Pemenuhan Kebutuhan Air Baku Di Kabupaten Kediri Alwafi Pujiraharjo; Suroso Suroso; Agus Suharyanto; Faris Afif Octavio
Rekayasa Sipil Vol 10, No 1 (2016)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (385.146 KB)

Abstract

Embung Guworejo direncanakan dibangun di desa Guworejo, Kabupaten Kediri, Jawa Timur. Kabupaten Kediri adalah salah satu daerah di Privinsi Jawa Timur dengan perkembangan yang cepat baik dari pertambahan jumlah penduduk maupun dalam pertumbuhan pertanian dan ekonomi. Namun perkembangan tersebut masih menemui hambatan-hambatan yang dapat mengganggu jalannya proses tersebut, yaitu adanya permasalahan kekurangan air pada saat musim kemarau untuk kebutuhan irigasi dan permasalahan banjir pada musim penghujan. Salah satu upaya dalam mengatasi permasalahan tersebut adalah dengan membangun embung (bendungan) yang dapat memberikan solusi pemanfaatan air permukaan dari daerah hulu yang dapat berfungsi sebagai tampungan air pada saat musim penghujan. Dalam kajian ini dilakukan analisis perencanaan tubuh utama embung, stabilitas rembesan, stabilitas lereng dan simulasi embung tersebut. Analisis perencanaan tubuh utama embung dilakukan guna mengetahui dimensi embung yang akan direncanakan tersebut. Perhitungan stabilitas rembesan dilakukan guna mengidentifikasi faktor kehilangan air melalui tubuh embung, sedangkan stabilitas lereng dilakukan guna mengidentifikasi faktor keamanan tubuh embung dari bidang longsor yang potensial pada bagian hulu dan hilir. Dan simulasi embung adalah untuk mengetahui apakah embung tersebut layak dibangun atau tidak. Berdasarkan hasil desain tubuh embung sesuai dengan data penunjang yang didapat, maka didapatkan bahwa tubuh embung Guworejo aman terhadap bahaya yang mungkin ditimbulkan pada bendungan dan sesuai dengan hasil simulasi embung tersebut, embung Guworejo layak dibangun karena dapat menyalurkan ketersediaan air untuk kebutuhan irigasi. 
Analisis Resiko Waktu Di Proyek Konstruksi Studi Kasus Proyek Ampuh Pressure Maintenence Di Duri, Riau Sukirno Sukirno
Rekayasa Sipil Vol 9, No 3 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (627.061 KB)

Abstract

Completion schedule some EPC project in Duri Riau in 2014 delayed. The condition always associated with risk in a certain scale. Risk analysis needed to reduce risks and solve the condition. Results of research conducted identify five major risks, namely human resource delays, material delays, the required equipmentsdelays, changes in design and specifications, and the lack of quality and the experience of supervision team. Fifth of risks identified in the high risk category. The level influence of risk to completion plan Ampuh Pressure Maintenance Project in Duri Riau with the probability 80% is 22,12% or 48 working days of the planned schedule 217 days is classified as high risk. After risk mitigation and control the probability 80% ,time delay decrease to 12.44% or 27 days. 

Filter by Year

2007 2026


Filter By Issues
All Issue Vol. 20 No. 1 (2026): Rekayasa Sipil Vol. 20 No. 1 Vol. 19 No. 3 (2025): Rekayasa Sipil Vol. 19 No. 3 Vol. 19 No. 2 (2025): Rekayasa Sipil Vol. 19 No. 2 Vol. 19 No. 1 (2025): Rekayasa Sipil Vol. 19 No. 1 Vol. 18 No. 3 (2024): Rekayasa Sipil Vol. 18 No. 3 Vol. 18 No. 2 (2024): Rekayasa Sipil Vol. 18 No. 2 Vol. 18 No. 1 (2024): Rekayasa Sipil Vol. 18 No. 1 Vol. 17 No. 3 (2023): Rekayasa Sipil Vol. 17 No. 3 Vol. 17 No. 2 (2023): Rekayasa Sipil Vol. 17 No. 2 Vol. 17 No. 1 (2023): Rekayasa Sipil Vol. 17 No. 1 Vol. 16 No. 3 (2022): Rekayasa Sipil Vol.16. No.3 Vol. 16 No. 2 (2022): Rekayasa Sipil Vol.16. No.2 Vol. 16 No. 1 (2022): Rekayasa Sipil Vol.16. No.1 Vol 15, No 3 (2021) Vol. 15 No. 2 (2021) Vol 15, No 1 (2021) Vol 14, No 3 (2020) Vol 14, No 2 (2020) Vol 14, No 1 (2020) Vol 13, No 3 (2019) Vol 13, No 2 (2019) Vol 13, No 1 (2019) Vol 12, No 2 (2018) Vol 12, No 1 (2018) Vol 12, No 1 (2018) Vol 11, No 3 (2017) Vol 11, No 2 (2017) Vol 11, No 2 (2017) Vol 11, No 1 (2017) Vol 11, No 1 (2017) Vol 10, No 3 (2016) Vol 10, No 2 (2016) Vol 10, No 1 (2016) Vol 10, No 1 (2016) Vol 9, No 3 (2015) Vol 9, No 3 (2015) Vol 9, No 2 (2015) Vol 9, No 1 (2015) Vol. 8 No. 3 (2014) Vol 8, No 2 (2014) Vol 8, No 2 (2014) Vol 8, No 1 (2014) Vol 7, No 3 (2013) Vol 7, No 3 (2013) Vol 7, No 2 (2013) Vol 7, No 1 (2013) Vol 6, No 3 (2012) Vol 6, No 3 (2012) Vol 6, No 2 (2012) Vol 6, No 2 (2012) Vol 6, No 1 (2012) Vol 5, No 3 (2011) Vol 5, No 2 (2011) Vol 5, No 2 (2011) Vol 5, No 1 (2011) Vol 5, No 1 (2011) Vol 4, No 3 (2010) Vol 4, No 2 (2010) Vol 4, No 1 (2010) Vol 4, No 1 (2010) Vol 3, No 3 (2009) Vol 3, No 2 (2009) Vol 3, No 1 (2009) Vol 2, No 3 (2008) Vol 2, No 2 (2008) Vol 2, No 2 (2008) Vol 2, No 1 (2008) Vol 1, No 1 (2007) More Issue