cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Rekayasa Sipil
Published by Universitas Brawijaya
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 551 Documents
Crack Depth Measurement of Reinforced Concrete Beams Using UPV Ari Wibowo; Hendro Suseno; M. Hamzah Hasyim; Roland Martin S.; Christin Remayanti N.; Ardian Prima K.
Rekayasa Sipil Vol 8, No 1 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (471.211 KB)

Abstract

Cracks in the concrete should not be ignored because it can cause serious problems. Cracks in concrete usually terms only in wide of rift, so a review of crack depth is needed. Crack depth can be measured by Ultrasonic Pulse Velocity (UPV). UPV test is one of the Non Destructive Tests on the building. UPV testing is influenced by several factors such as reinforced steel. The aim of this study is to determine the accuracy of crack depth in reinforced concrete beams with a thickness of concrete cover measured by UPV. Four variations of 15 concrete beams and one variation of unreinforced beam with thick concrete cover are used in this study. Three test specimens are used for each variation. The thickness of concrete cover is measured at point of 2 cm, 3 cm, 4 cm, and 5 cm. The concrete beams of 15 x 20 x 50 cm in size were designed with 8 cm crack depth. Artificial crack in the concrete beam is generated in a way to give the sealing of cracks in the aluminum zinc plate formwork before casting occur. Crack protection removed from the formwork with duration of 3-4 hours after casting. Crack depth measured by UPV test is done after 28 days concrete age. The results showed that there is a relative error of crack depth measured with UPV test. The average relative error of concrete with a thickness cover of 2 cm, 3 cm, 4 cm, and 5 cm was respectively 6.80 %, 6.63 %, 5.48 % and 4.91 %. The average relative error of unreinforced concrete was 4.59 %. Statistical analysis with one way F test shows that there is no significant difference between the relative error of crack depth measured with UPV test at each cover depth variation and unreinforced concrete with α = 0.05. 
Pengaruh Jarak Tulangan Bambu Pada Struktur Cangkang Beton Bambu Komposit Siti Nurlina; Hendro Suseno; Devi Nuralinah; Indradi Wijatmiko; Bhondana Bayu B.K
Rekayasa Sipil Vol 8, No 1 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (367.002 KB)

Abstract

Cangkang dalam pengunaannya pada teknologi struktur tingkat lanjut, umumnya menggunakan tulangan baja untuk perkuatan dan daktilitas. Tetapi pada masa sekarang, tulangan baja yang dijual di pasaran relatif mahal. Oleh karena itu, perlu adanya bahan pengganti tulangan baja yang lebih murah. Penggunaan komposit anyaman bambu dapat digunakan sebagai alternatif tulangan pada struktur cangkang. Tujuan dari penelitian ini adalah untuk membandingkan kapasitas beban dari cangkang yang berukuran (120 x 60) cm degan sudut lengkung 54 derajat dengan variasi jarak tulangan bambu yaitu 10cm, 8cm, dan 6cm. Masing-masing tiga benda uji, dan menggunakan model sruktur cangkang 1 arah. Pembebanan dengan menggunakan beban garis pada 3 lokasi. pada hasil eksperimen dan uji statistik pada data hasil pengujian cangkang tipis dengan menggunakan variasi jarak tulangan bambu, tak terlihat adanya pengaruh yang signifikan, maka dapat diambil kesimpulan bahwa cangkang bekerja sebagai struktur tekan penuh, sehingga tulangan hanya bekerja sebagai pengekang dan beton berkerja sepenuhnya. 
Antisipasi Keterlambatan Proyek Menggunakan Metode What If Diterapkan Pada Microsoft Project Saifoe El Unas; M. Hamzah Hasyim; Kartika Puspa Negara
Rekayasa Sipil Vol. 8 No. 3 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (446.895 KB)

Abstract

Mayoritas proyek pembangunan di Indonesia kurang memperhatikan metode penjadwalan yang baik sehingga keterlambatan pekerjaan sangat sering terjadi.Hal ini seringkali menjadi sumber perselisihan antara pemilik dan kontraktor. Maka dari itu pentingnya penjadwalan yang baik guna menghindari hal tersebut dan juga agar proyek bisa selesai tepat pada waktunya. Metode “What If” merupakan alternatif metode penjadwalan yang dapat mengejar keterlambatan proyek dengan cara menambahkan tenaga kerja atau jam kerja guna mengejar keterlambatan proyek, sehingga proyek yang sudah terlambat dapat kembali ke waktu utama penjadwalan. Studi kasus dalam penelitian ini adalah keterlambatan pembangunan proyek Apartement Tamansari Bandung. Durasi rencana pekerjaan struktur utama adalah 282 hari sedangkan total durasi pekerjaan Apartement Tamansari Panoramic adalah 404 hari. Dikarenakan keterlambatan sehingga pekerjaan struktur utama menjadi 298 hari dan total durasi pekerjaan menjadi 413 hari. Dengan metode ini keterlambatan proyek dapat dikejar sehingga kembali ke waktu normal tanpa adanya penambahan biaya. 
The Effect Of Variation of Pyrophyllite Addition To Compressive Strength, Porosity, And Diagram of Stress Strain In Burnt Lightweight Concrete Brick Ristinah Ristinah; Retno Anggraini; Achfas Zacoeb; Prastumi Prastumi; Krisna Febrian Anugerahputra; I Dewa Nyoman Yoga Prawira
Rekayasa Sipil Vol 7, No 3 (2013)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (391.036 KB)

Abstract

Lightweight brick is a material widely used in civil engineering as a substitute alternative material and brick walls of the building material. The aim of this study is to determine the behavior of burnt light brick, and behavior of piropilit additions in the mix proportion of the light brick. Specimens were tested by compressive strength, porosity, and modulus of elasticity. To test the compressive strength, plates were set at the top and bottom of the test specimen; a dial gauge was used to determine the deformation. To test the porosity, the specimen was cut into a size of 15 x 20 x 10 cm 3 and tested in accordance with porosity testing procedures. Data for the elastic modulus was obtained from stress and strain testing in conjunction with the compressive strength test. After the age of 28 days, specimens undergo combustion process before tested in the laboratory. Results of this study show that the addition of amount of piropilit as filler as much as 10-25% by weight of cement will increase the strength of brick light post-combustion at 800 o C temperature along with the increasing number of additional piropilit in it, however the addition of 5% would reduce the value of compressive strength. The addition of piropilit in the burnt lightweight brick will decrease the value of the strength. Porosity and modulus of elasticity values indicate that the addition of a filler piropilit as much as 515% by weight of cement on the burnt brick would increase the value of its porosity, however the addition of 20% and 25% would reduce the value of porosity. The modulus of elasticity values obtained from the stress and strain diagram, an increase of 5% -25% variation pyrophyllite additions. However there are some fluctuation trends on a variation of 5% -20% due to piropilit characteristics that do not fit to undergo the process of combustion or due to the setting position of the specimen in the furnace when the combustion process which allows the specimen exposed to direct flame or not. 
Peluang Investasi Pada Kawasan Wisata Taman Nasional Tanjung Puting (TNTP) Di Kabupaten Kotawaringin Barat Provinsi Kalimantan Tengah Dengan Sistem Built Operate Transfer (BOT) Laras Mitra Parayogi; M. Ruslin Anwar; Alwafi Pujiraharjo
Rekayasa Sipil Vol. 8 No. 3 (2014)
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (494.998 KB)

Abstract

The development of the tourism sector in Indonesia is one of the potential investment is promising. But not all potential can be developed .Such is the case with the tourism sector in Kotawaringin Barat exspecially is the Tanjung Puting National Park (TNTP). One of the barriers are is the limitation of funds and Government resources in developing this sector. Therefore required partnership with the private sector is a Built Operate Transfer (BOT). The purpose of this research are: (1) to know the means of tourism is needed at the time of a visit in the area of tourism, (2) to test the feasibility of financial investments on the TNTP without a BOT system, (3) to test the feasibility of financial investments on the TNTP without a BOT system. The research method used questionnaire for tourist at TNTP, and count financial feasibility with Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), Profitability Index (PI), and descriptive statistical analysis methods.Survey at TNTP location to know real condition and interview with employee Balai Taman Nasional Tanjung Putting. The result of this research is that the facility is needed, campground cottage - inn, restaurant, boat kelotok, audio visual room, trackking area, gift shop, health clinic, and investment in the area of TNTP judged worth doing with BOT for maximum concession periode 18 years. If investment more than 18 years, prefer doing without BOT. 
Pengaruh Perubahan Iklim Terhadap Ketersediaan Air Baku Di Malang Raya Alwafi Pujiraharjo; Arief Rachmansyah; Indradi Wijatmiko; M. Ruslin Anwar
Rekayasa Sipil Vol 9, No 1 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (745.711 KB)

Abstract

Air merupakan kebutuhan yang penting dalam kehidupan manusia dimana merupakan sumber daya alam yang harus dijaga ketersediaannya. Perubahan dan penggunaan lahan serta perubahan cuaca dapat menimbulkan perubahan pada kondisi sumber air. Perubahan tersebut dapat mempengaruhi ketersediaan air. Kondisi saat ini di Malang Raya, yang meliputi Kota Batu, Kota Malang dan Kabupaten Malang, terdapat beberapa mata air dan sumur yang mengalami penurunan kuantitas. Apabila tidak dilakukan usaha perlindungan dan perbaikan mata air, maka dapat menimbulkan kondisi dimana tidak ada sumber air yang dapat diambil lagi. Untuk lebih memahami masalah kesediaan air di Malang Raya, maka perlu dilakukan penelitian untuk mengetahui kondisi kesediaan air di Malang Raya. Penelitian akan dilakukan dengan mengumpulkan data-data dan informasi yang dapat digunakan dalam analisis ketersediaan air. Data yang diperoleh dapat berupa data primer dan sekunder, seperti data curah hujan, suhu, topografi, kondisi geologi dan geohidrologi serta kondisi pelayanan air di Malang Raya. Data-data tersebut kemudian juga akan dianalisis melalui perhitungan banjir rencana untuk mengetahui resiko banjir serta melalui perhitungan debit andalan untuk mengetahui resiko kekeringan dengan melihat adanya pengaruh perubahan iklim yang ditandai oleh perubahan suhu. 
Pengaruh Campuran Kadar Bottom Ash Dan Lama Perendaman Air Laut Terhadap Kuat Tekan, Lendutan, Kapasitas Lentur, Kuat Geser Dan Pola Retak Balok Ristinah Syamsuddin; Taufik Hidayat; Ari Wibowo; Devi Nuralinah
Rekayasa Sipil Vol 9, No 1 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (328.828 KB)

Abstract

Bottom ash merupakan salah satu limbah PLTU karena jumlahnya yang sangat banyak dan tidak dapat dibuang di sembarang tempat, maka bottom ash seringkali direkayasa sebagai bahan campuran untuk membuat beberapa jenis bahan material dalam proyek pembangunan. Contohnya adalah batu bata dan genting. Kali ini kami mencoba untuk menggunakan bottom ash sebagai campuran semen dalam pembuatan beton. Karena seperti yang kita ketahui jumlah limbah ini akan terus bertambah seiring berjalannya PLTU. Maka dari itu tujuan penelitian kami adalah untuk memanfaatkan limbah bottom ash sebagai campuran semen untuk pembuatan beton dengan bentuk cube maupun tetrapod yang biasa digunakan sebagai pemecah ombak (breakwater) di sekitar pelabuhan. Berikutnya, metode penelitian yang akan diterapkan adalah dengan membuat beton normal (tanpa campuran) dan tiga kadar variasi beton dengan campuran 10% , 20% dan 25% bottom ash terhadap semen. Setelah mengalami pengikatan selama 1-2 hari beton yang kami buat akan di curing (direndam) dalam air laut dengan rentang waktu mulai 7, 14 hingga 28 hari. Setelah proses perendaman dalam berbagai kurun waktu tersebut kemudian keseluruhan beton akan di uji kuat tekan. Hasil dari berbagai variabel tersebut akan dibandingkan hingga akhirnya dapat dapat disimpulkan apakah limbah bottom ash dapat digunakan sebagai campuran semen dalam pembuatan cube maupun tetrapod. 
Analisis Kapasitas Dan Keandalan Bangunan, Studi Kasus: SMA 1 Madiun Sugeng P. Budio; Retno Anggraini; Achfas Zacoeb; Edhi Wahyuni
Rekayasa Sipil Vol 9, No 1 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (287.583 KB)

Abstract

Salah satu faktor yang harus diperhatikan dalam perencanaan suatu gedung adalah keandalan bangunan. Berdasarkan UU RI No. 28 Tahun 2002 disebutkan bahwa setiap bangunan gedung harus memenuhi persyaratan administratif dan persyaratan teknis sesuai dengan fungsi bangunan gedung. Persyaratan teknis meliputi persyaratan tata bangunan dan persyaratan keandalan bangunan gedung, yaitu persyaratan kemampuan bangunan gedung untuk mendukung beban muatan, serta kemampuan bangunan gedung dalam mencegah dan menanggulangi bahaya kebakaran dan bahaya petir. Oleh karena itu, setiap bangunan yang akan dirancang maupun yang sudah beroperasi, terutama bangunan yang mempunyai fungsi vital serta merupakan bangunan dengan kepentingan orang banyak memerlukan pengawasan yang ketat terhadap kualitas bangunannya dan memiliki jaminan laik fungsi. Studi kasus yang dipakai dalam penelitian ini adalah bangunan sekolah SMA Madiun I. Dalam penelitian ini akan dibahas studi kasus mengenai keandalan struktur bangunan serta aspek-aspek yang mempengaruhi keandalan suatu bangunan. 
Kajian Kerentanan Kawasan Berpotensi Banjir Bandang Dan Mitigasi Bencana Pada Daerah Aliran Sungai (DAS) Batang Kuranji Kota Padang Utama, Lusi; Naumar, Afrizal
Rekayasa Sipil Vol 9, No 1 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (689.119 KB)

Abstract

Penelitian ini bertujuan mengetahui zonasi banjir di sepanjang Batang Kuranji serta mitigasi akibat banjir. Banjir di Batang Kuranji disebabkan kerusakan DAS, perubahan fungsi lahan, runtuhnya bendungan alami dan patahnya saluran air. Dengan menggunakan data curah hujan tahun 2003 sampai tahun 2012 (saat terjadinya banjir bandang) didapat tinggi curah hujan 147,812 mm, debit banjir 440.384 m³/detik. Dari analisa peta citra dan korelasi terhadap parameter penyebab banjir, wilayah ini mempunyai dua kelas kerentanan yaitu kerentanan sedang di daerah tengah dan hilir, kerentanan rendah di daerah tengah. Daerah yang berpotensi mengakibatkan terjadinya banjir adalah daerah hulu, karena mempunyai tingkat kelerengan yang tajam (45% – 55%) dan berbukit. Mitigasi adalah dengan membuat peraturan pengaturan tata ruang, monitoring peruntukan lahan, sosialisasi kawasan banjir, normalisasi sungai, pelestarian hutan, perbaikan lereng, pembangunan saluran air. 
Pengaruh Penambahan Fly Ash Terhadap Sifat Workability Dan Sifat Fisik - Mekanik Beton Non Pasir Dengan Agregat Alwa Asal Cilacap Trisnoyuwono, Diarto
Rekayasa Sipil Vol 9, No 1 (2015)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (368.913 KB)

Abstract

A massive concrete production impact on improving air pollution from cement plants. In addition, there are areas has limited aggregate resources that meet building requirement. Building materials technology bring solution for such problems, for example fly ash which can improve the performance of concrete, artificial lightweight aggregate (ALWA) from shale combustion and no-fines concrete. The study aims to determine effect of the fly ash in the mixes of no-fines concrete with ALWA aggregate to the degree of workability and physical - mechanical properties. This research was conducted by the addition of the variable portion of fly ash by 10-20% in comparison mixture of cement - aggregate 1: 4; 1: 6; 1: 8, and the measured value of the slump (workability values) and compressive strength. The results indicate the addition of fly ash were able to increases the value of the slump of up to 7 cm and reach 19.71 MPa of compressive strength. 

Filter by Year

2007 2026


Filter By Issues
All Issue Vol. 20 No. 1 (2026): Rekayasa Sipil Vol. 20 No. 1 Vol. 19 No. 3 (2025): Rekayasa Sipil Vol. 19 No. 3 Vol. 19 No. 2 (2025): Rekayasa Sipil Vol. 19 No. 2 Vol. 19 No. 1 (2025): Rekayasa Sipil Vol. 19 No. 1 Vol. 18 No. 3 (2024): Rekayasa Sipil Vol. 18 No. 3 Vol. 18 No. 2 (2024): Rekayasa Sipil Vol. 18 No. 2 Vol. 18 No. 1 (2024): Rekayasa Sipil Vol. 18 No. 1 Vol. 17 No. 3 (2023): Rekayasa Sipil Vol. 17 No. 3 Vol. 17 No. 2 (2023): Rekayasa Sipil Vol. 17 No. 2 Vol. 17 No. 1 (2023): Rekayasa Sipil Vol. 17 No. 1 Vol. 16 No. 3 (2022): Rekayasa Sipil Vol.16. No.3 Vol. 16 No. 2 (2022): Rekayasa Sipil Vol.16. No.2 Vol. 16 No. 1 (2022): Rekayasa Sipil Vol.16. No.1 Vol 15, No 3 (2021) Vol. 15 No. 2 (2021) Vol 15, No 1 (2021) Vol 14, No 3 (2020) Vol 14, No 2 (2020) Vol 14, No 1 (2020) Vol 13, No 3 (2019) Vol 13, No 2 (2019) Vol 13, No 1 (2019) Vol 12, No 2 (2018) Vol 12, No 1 (2018) Vol 12, No 1 (2018) Vol 11, No 3 (2017) Vol 11, No 2 (2017) Vol 11, No 2 (2017) Vol 11, No 1 (2017) Vol 11, No 1 (2017) Vol 10, No 3 (2016) Vol 10, No 2 (2016) Vol 10, No 1 (2016) Vol 10, No 1 (2016) Vol 9, No 3 (2015) Vol 9, No 3 (2015) Vol 9, No 2 (2015) Vol 9, No 1 (2015) Vol. 8 No. 3 (2014) Vol 8, No 2 (2014) Vol 8, No 2 (2014) Vol 8, No 1 (2014) Vol 7, No 3 (2013) Vol 7, No 3 (2013) Vol 7, No 2 (2013) Vol 7, No 1 (2013) Vol 6, No 3 (2012) Vol 6, No 3 (2012) Vol 6, No 2 (2012) Vol 6, No 2 (2012) Vol 6, No 1 (2012) Vol 5, No 3 (2011) Vol 5, No 2 (2011) Vol 5, No 2 (2011) Vol 5, No 1 (2011) Vol 5, No 1 (2011) Vol 4, No 3 (2010) Vol 4, No 2 (2010) Vol 4, No 1 (2010) Vol 4, No 1 (2010) Vol 3, No 3 (2009) Vol 3, No 2 (2009) Vol 3, No 1 (2009) Vol 2, No 3 (2008) Vol 2, No 2 (2008) Vol 2, No 2 (2008) Vol 2, No 1 (2008) Vol 1, No 1 (2007) More Issue