cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota bandar lampung,
Lampung
INDONESIA
Jurnal Rekayasa Sipil dan Desain
Published by Universitas Lampung
ISSN : 23030011     EISSN : 27150690     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 9 Documents
Search results for , issue "Vol 6, No 3 (2018): Edisi September 2018" : 9 Documents clear
Studi Efektivitas Ruang Henti Khusus (RHK) Sepeda Motor Pada Simpang Bersinyal Jesicha Nainggolan; Aleksander Purba; Rahayu Sulistyorini
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The increasing number of motorcycle vehicles, causing traffic congestion at the signal intersection in Bandar Lampung City. As an effort in reducing congestion, the government of Bandar Lampung city made Special Stopping Space (RHK) for motorcycles. The RHK is a space dedicated to arrange motorcycle queue place when stop at the signalized intersection during traffic light period. This study aims to examine the effectiveness of RHK at the signalized intersection, and it’s impact on saturation current increase and approach capacity compared to approach without RHK. The effectiveness and impact of RHK, was conducted by surveying traffic flow in the morning during peak hours using camera video in each selected approaches. The survey data obtained were analyzed using MKJI and compared with previous research. RHK increases saturation flow 7,3% - 17,5% and approach capacity 37,67% - 52,09%. In conclusion RHK is effective to be provided in signal intersection. Value of RHK filling level at Jl. P. Diponegoro - Jl. P. Diponegoro and Jl. Jend. Sudirman - Jl. Gajah Mada - Jl. Jend. Sudirman is less than 50% that indicates bad while at Jl. Jend. Sudirman - Jl. Jend. Sudirman and Jl. Dr. Susilo - Jl. P. Diponegoro is 50% - 80% that indicates moderate.  Keyword : RHK (SSSM : Special Stopping Space for Motorcycle), signal intersection, effectiveness of RHK, saturation current, capacity of the approach
Pengaruh Derajat Kejenuhan Pada Tanah Gambut Menggunakan Uji Kuat Geser Tanah Achmad Paksi Firdaus; Setyanto Setyanto; Ahmad Herison
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The soil occupies an important role in the construction of a building, the main benefit of the soil isas a foundation of the construction, there are several soil shear strength tests, such as DirectShear Test, and Vane Shear Test. Each test can produce different test results for the same testobject. This may occur due to different testing procedures and workings of different tools as wellas the main test result targets of each equipment in the determination of soil parameters.Therefore, a careful soil investigation is needed, especially to determine the degree of saturationin peat soils by using soil shear strength test. In this study, the soil tested is a type of peat soiloriginated from the Rawa Seragi area, Belimbing Sari Village, Jabung District, East LampungDistrict.The tests were conducted directly in the laboratory for 12 (twelve) points and at differentdepths with Vane Shear and Direct Shear tools used to calculate the soil and maximum readingability on the torsimeter dial. Based on the test results obtained the average shear strength valueof Vane Shear on saturated soil at 30cm with an average value of 0.0379 and at a depth of 50cmwith an average value of 0.0384 and on unsaturated soil at a depth of 30cm with an average valueof 0.0434 and at a depth of 50cm with an average value of 0.0406 thus obtained a decrease of0.0066.Keywords: Degree of Saturation, Peat Soil, Shear Strength Test
Analisis Pengaruh Beban Gempa pada Gedung Tiga Lantai Menggunakan Metode Statik Ekuivalen Nadya Safira; Surya Sebayang; Masdar Helmi
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The purpose of this study is to evaluate the effect of earthquake load on the structure of a third floor school building in West Lampung. The effects of earthquake is reviewed on the dimensions, reinforcement, and deflection of structures by comparing building without earthquake load. The earthquake load calculation using Static Equivalent Method is helped by SAP 2000 program. This program can also produce internal force of the moment, latitude, and normal (M, D, N). The calculation of the slab is calculated by direct design method (DDM). The results of this analysis showed that the calculation of all reinforcement requirements on slab, beams, columns, bore pile foundations, sloof and pile caps in the building with earthquake load 283,3267% is more than compared to the building without earthquake load seen from the number of as on each structure. Dimension design on the structure without earthquake load result that dimension of beams are 250 x 450 mm, coloumns are 350 x 350 mm, diameter of bore piles are 70 cm, sloofs are 250 x 450 mm and pile caps are 1600 mm while the dimensions of the structure with the earthquake load resulted in larger dimensions with dimension of columns are 600 x 600 mm, diameter of bore pile foundations are 80 cm, and pile caps are 1800 mm. Keywords: earthquake load, static ekuivalen, direct design method, and SAP2000.
Analisis dan Perencanaan Sistem Drainase di Lingkungan Universitas Lampung(Studi Kasus Zona II : Fakultas Matematika dan Ilmu Pengetahuan Alam, Fakultas Kedokteran dan Fakultas Keguruan dan Ilmu Pendidikan) Widi Teja Kusuma; Ofik Taufik Purwadi; Sumiharni Sumiharni
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Lampung University as one of the first and oldest universities in Lampung Province is one of the best universities in Sumatra and continues to improve its academic quality, and have A Accreditation. The improvement of Lampung University facilities and infrastructure is continuously conducted in order to improve both academic and non-academic quality. The form of non-academic quality improvement is environmental arrangement with the drainage system planning. It is intended to solve some of the flood puddles that occurred during the rainy season due to the lack of optimal condition of existing drainage in the University of Lampung.The analysis conducted in this research includes hydrological analysis and hydraulics analysis. Hydrological analysis aimed to calculate the discharge plan using rational method and hydraulic analysis aims to calculate the capacity of existing drainage channels. So we can know the position of the flood point and planning the new channel dimension.Based on the analysis of the flood point occurred at DN15 cross section with 9.5 m long overflow which is located in front of the entrance portal of Faculty of Mathematics and Sciences. There are also some new drainage section design at DN63 point along 56 m, DN64 along 45 m and DN65 along 67 m as they are still a natural drainage. It is also necessary to give the drainage channel maintenance by channel normalization, garbage retaining lattice installation, and periodic cleaning of channels.
Analisis dan Perencanaan Sistem Drainase Di Jl. Raden Gunawan 2 Kecamatan Rajabasa Bandar Lampung Ismawan Dewan Syah; Nur Arifaini; Ofik Taupik Purwadi
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The occurrence of floods at Raden Gunawan 2 street, Rajabasa district, Bandar Lampung was caused by the inability of existing drainage channels to accommodate direct run-off discharge and blockage of drainage channels by garbage.Hydrological analysis was performed by using the maximum rainfall data within the last 10 years, then, parameter calculation were performed to calculate the discharge plan using rational method. The wide-scale of watershed is 0.77308 km2 and the drainage coefficient is 0.5132. The hydraulic analysis was conducted to calculate the drainage channel discharge capacity using continuity formula and Manning formula, after that, suitable systems and dimensions were planned.Based on the results of the research, the suitable rain distribution is Log Pearson III Distribution which obtained rainfall value of plan for the 5-year rework time of 109,016 mm and the amount of the biggest discharge at joint segment between primary channel and Kemiling area is 2,8336 m3 / sec. Then, flood heights were found in the research area as high as 10-30 cm, because the existing dimensions were not able to accommodate the discharge plan. Thus, suitable channel dimensions are planned using U-Ditch shaped sections with U100 / 100, U150 / 150, U150 / 250 and U250 / 250 sizes. So, the discharge plan (Qr) is smaller than the discharge channel (Qs). Keywords: drainage, hydrology, hydraulics, distribution.
Kajian Dampak Proses Angkutan Terhadap Segregasi Pada Campuran Aspal Panas Atreyu Alfarido; Sasana Putra; Aleksander Purba
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

One of the causes of construction failure on asphalt pavement is segregation. Which  is the separation of small and large aggregate grains within a mixture, so that in a part of the coating of the pavement will be concentrated aggregate coarse and in other part will be concentrated fine aggregate. One of the factors causing segregation is the hauling distance from Asphalt Mixing Plant to the slap location. To understand this, task a study on the impact of the transport process on segregation on hot asphalt mixture from Asphalt Mixing Plant to the location of the spread. The mixture used is the Asphalt Concrete-Wearing Course type or the laston coated wear of Asphalt Mixing Plant PT. Gigging Polah Raya for work location which is 28.9 km on Jalan Sultan Agung, Bandar Lampung, Lampung and PT. Rindang Tigasatu Pratama for work location located 53.3 km on Jalan Teuku Cik Ditiro, Bandar Lampung, Lampung. Examination of sample is done trough extraction test and sieve analysis test. From the result of the research, it’s found that there is being segregation during the transport of asphalt mix mixture from Asphalt Mixing Plant to the slap location. For sample PT. Manggung Polah Raya, gradation aggregate is still within the upper and lower limits of the general specification Bina Marga 2010. As for the sample of PT. Rindang Tigasatu Pratama, the aggregate gradation is out of the upper and lower limits of the general specification of Bina Marga 2010. Factors affecting segregation are haulage distances and aggregate density. Keywords: Road Pavement, Asphalt Concrete, Segregation.
Analisis Ekonomi dan Finansial Shortcut Tegineneng - Tarahan Andre Jonathan Siagian; Aleksander Purba; Amril Ma'ruf Siregar
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Feasibility Analysis is an appropriate analysis of parameters to determine a successful implemented project or not. Feasibility analysis is divided into two parts economic and financial analysis that both affect the feasibility of a project. The purpose of this study is to determine the costs incurred in a railway shortcut project, to analyze delay times before and after a railway shortcut, and to find out which railway shortcut project meets the economic and financial feasibility requirements. In this study, an analysis of the economic and financial feasibility and summarize the economic viability benefits of the Tegineneng - Tarahan shortcut project was conduct. A project is declared feasible or not by doing comparison with the feasibility method that is NPV> 0, BCR> 1, PP faster than the specified time, IRR> capital cost, and PI> 1. This study uses full occupancy rate with discount rate of 5% , 10%, and 15%, respectively.Based on the results obtained in terms of economic feasibility analysis that investment evaluation does not qualify due to the amount of benefit is too small so that economic analysis is not feasible. The aspect of financial feasibility analysis and analysis by summing the two financial and economic benefits is eligible so that the Tegineneng - Tarahan shortcut project is categorized as feasible. Keyword : Economic Feasibility, Financial Feasibility, Feasibility Method
Analisis dan Desain Sistem Drainase di Lingkungan Universitas Lampung (Studi Kasus: Zona III Wilayah Rektorat – Fakultas Pertanian) Rahmat Effendi; Ofik Taufik Purwadi; Ahmad Herison
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Water problems consist of three types: flood, drought, and water pollution. Floods are recognized as a significant source of threat to human life. One of the flood prevention actions that can be done is to optimize the drainage channels. Drainage can be defined as a technical action to reduce excess water so that the function of the area or land is not disturbed. University of Lampung is one of the locations prone to flooding. Therefore, a research to overcome the flood that occurred at the University of Lampung has been conducted (Case Study: Zone III Rectorate Area - Faculty of Agriculture). The purposes of this research are to analyze the drainage system of University of Lampung and to design drainage system that fulfill flood discharge plan. The research was conducted by survey in the field. The analysis conducted in this study include hydrological analysis and hydraulics analysis using HEC-RAS4.1.0 application. Calculation of discharge plan using rational method.. Based on the analysis results, there are no channels that are not sufficient for flood discharge, but there are some channels that are disconnected and cause the water to not flow. The disconnected channels are located on the channel with the DN5 and DN62 codes. For that, it is recommended to create a channel connecting DN62 channel with DN63, and make a channel on channel DN5 to DN65. The budget required for the repair of this channel is Rp 207,203,725.00 (Two Hundred Seven Million Two Hundred and Three Thousand Seven Hundred Twenty Five Rupiah).Keywords: Drainage, HEC-RAS, hydrology, hydraulics, floods
Pengaruh Aktivitas Kendaraan Pabrik Semen Terhadap Kinerja Jalan Lintas Sumatera Febrian Andrey Wirawan; Dwi Herianto; Alekasnder Purba
Jurnal Rekayasa Sipil dan Desain Vol 6, No 3 (2018): Edisi September 2018
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstractTrans Sumatera highway is an arterial road that connected Lampung in eastern and Aceh in western of Sumatera island. One of the road section passed in Lampung Selatan Regency, Lampung Province is Rangai Tri Tunggal district which is located in industrial zone. Througt traffic and local traffic are mix in this area and affecting road performance in terms of delay, conflict, degree of saturation. Hence, it is necessary to conduct such analysis in order to predict the level of services of Sumatra highway along the industrial area’s affected. The aim of this study is to analyze the influence of cement plant activities on the performance of  Sumatera Highway. Data collected on Thursday and Saturday from 06:00 am to 06.00 pm (24-08-2017 and 26-08-2017). Calculation methods used are based on inter-urban roads category and unsignalised intersection which refers to MKJI 1997 and KM No. 14 of 2006. Based on findings the degree of saturations is ranging from 0.68 to 0.67 on Thursday and 0.68 to 0.66 on Saturdays indicating road performance at service level B stable and average speed of light vehicles is 41.5 km/h. Degree of saturation at the unsignalised intersection ranging from 0.97 to 0.96 on Thurday and Saturday and the delay is stand from 18sec/pcu to 17 sec/pcu on Thurday and Saturday which indicate service level C which mean as normal conditions. Keywords: degree of saturation, level of service, road performance.

Page 1 of 1 | Total Record : 9


Filter by Year

2018 2018


Filter By Issues
All Issue Vol 12, No 1 (2024): Edisi Maret 2024 Vol. 12 No. 1 (2024): Edisi Maret 2024 Vol. 11 No. 4 (2023): Edisi Desember 2023 Vol 11, No 4 (2023): Edisi Desember 2023 Vol. 11 No. 3 (2023): Edisi September 2023 Vol 11, No 3 (2023): Edisi September 2023 Vol. 11 No. 2 (2023): Edisi Juni 2023 Vol 11, No 2 (2023): Edisi Juni 2023 Vol 11, No 1 (2023): Edisi Maret 2023 Vol. 11 No. 1 (2023): Edisi Maret 2023 Vol. 10 No. 4 (2022): Edisi Desember 2022 Vol. 10 No. 3 (2022): Edisi September 2022 Vol 10, No 2 (2022): Edisi Juni 2022 Vol. 10 No. 2 (2022): Edisi Juni 2022 Vol 10, No 1 (2022): Edisi Maret 2022 Vol. 10 No. 1 (2022): Edisi Maret 2022 Vol 9, No 4 (2021): Edisi Desember 2021 Vol. 9 No. 4 (2021): Edisi Desember 2021 Vol. 9 No. 3 (2021): Edisi September 2021 Vol 9, No 3 (2021): Edisi September 2021 Vol. 9 No. 2 (2021): Edisi Juni 2021 Vol 9, No 2 (2021): Edisi Juni 2021 Vol. 9 No. 1 (2021): Edisi Maret 2021 Vol 9, No 1 (2021): Edisi Maret 2021 Vol 8, No 4 (2020): Edisi Desember 2020 Vol. 8 No. 4 (2020): Edisi Desember 2020 Vol. 8 No. 3 (2020): Edisi September 2020 Vol 8, No 3 (2020): Edisi September 2020 Vol. 8 No. 2 (2020): Edisi Juni 2020 Vol 8, No 2 (2020): Edisi Juni 2020 Vol 8, No 1 (2020): Edisi Maret 2020 Vol. 8 No. 1 (2020): Edisi Maret 2020 Vol 7, No 4 (2019): Edisi Desember 2019 Vol. 7 No. 4 (2019): Edisi Desember 2019 Vol 7, No 3 (2019): Edisi September 2019 Vol 7, No 2 (2019): Edisi Juni 2019 Vol 7, No 1 (2019): Edisi Maret 2019 Vol 6, No 4 (2018): Edisi Desember 2018 Vol 6, No 3 (2018): Edisi September 2018 Vol 6, No 2 (2018): Edisi Juni 2018 Vol 6, No 2 (2018): Edisi Juni 2018 Vol 6, No 1 (2018): Edisi Maret 2018 Vol 6, No 1 (2018): Edisi Maret 2018 Vol 5, No 4 (2017): Edisi Desember 2017 Vol 5, No 3 (2017): Edisi September 2017 Vol 5, No 3 (2017): Edisi September 2017 Vol 5, No 2 (2017): Edisi Juni 2017 Vol 5, No 1 (2017): Edisi Maret 2017 Vol 5, No 1 (2017): Edisi Maret 2017 Vol 4, No 4 (2016): Edisi Desember 2016 Vol 4, No 3 (2016): Edisi September 2016 Vol 4, No 2 (2016): Edisi Juni 2016 Vol 4, No 2 (2016): Edisi Juni 2016 Vol 4, No 1 (2016): Edisi Maret 2016 Vol 3, No 3 (2015): Edisi September 2015 Vol 3, No 2 (2015): Edisi Juni 2015 Vol 3, No 1 (2015): Edisi Maret 2015 Vol 3, No 1 (2015): Edisi Maret 2015 Vol 1, No 1 (2013): Edisi Maret 2013 More Issue