cover
Contact Name
Hasbullah Syaf
Contact Email
jurnal.ppw@gmail.com
Phone
+6281342602334
Journal Mail Official
jurnal.ppw@gmail.com
Editorial Address
Program Studi Perencanaan dan Pengembangan Wilayah Program Pascasarjana Universitas Halu Oleo Kampus Abdullah Silondae, Jl. Mayjen S. Parman Kendari, 93121
Location
Kota kendari,
Sulawesi tenggara
INDONESIA
Jurnal Perencanaan Wilayah
Published by Universitas Halu Oleo
ISSN : 23560606     EISSN : 25024205     DOI : dx.doi.org/10.33772/ppw
Core Subject : Social, Engineering,
Jurnal Perencanaan Wilayah (JPW) merupakan media untuk menyebarluaskan informasi ilmiah yang berasal dari hasil riset para mahasiswa, dosen, peneliti, dan pemerhati masalah-masalah yang terkait perencanaan dan pengembangan wilayah, intervensi, dan rancangan terhadap komunitas, desa, kota, dan wilayah termasuk lingkungan fisik, spasial, teknologi, ekonomi dan pertanian.
Articles 5 Documents
Search results for , issue "Vol 4, No 1 (2019)" : 5 Documents clear
ANALISIS SPASIAL SEBARAN IPAL RS DI WILAYAH KOTA KENDARI BERDASARKAN EFEKTIVITAS PENGELOLAANNYA Desy Rahmawati; M. Tufaila Hemon; Nani Yuniar
Jurnal Perencanaan Wilayah Vol 4, No 1 (2019)
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1347.072 KB) | DOI: 10.33772/jpw.v4i1.7462

Abstract

This study aims to determine the quality of hospital wastewater that has gone through processing, toknow the effectiveness of Hospital Wastewater Treatment Plants in Kendari City, to know the distribution ofHospital Wastewater Treatment Plants based on the quality of their wastewater and develop managementstrategies. This type of research is qualitative descriptive with a survey approach. In this study, sampleswere taken in the inlet pipe section and the hospital wastewater treatment plant with BOD5, COD and TotalColiform test parameters. The results showed that based on the COD and BOD5 parameters of 8 (eight)hospitals that have only 1 (one) hospital wastewater treatment plant whose test results exceeded the qualitystandard based on KepmenLH no.05 of 2014. Total Coliform parameters were 8 (eight ) hospitals that havea Waste Water Treatment Plant have 2 (two) hospitals whose test results exceed the quality standards basedon KepmenLH no.05 of 2014. Effectiveness of hospital wastewater treatment plants based on BOD5 testparameters which have effectiveness between > 67-100% there are 6 (six) hospitals, the effectivenessbetween > 34 - 67% there is 1 (one) hospital and the effectiveness between 0 - 34% there is 1 ( one) hospital.Effectiveness based on COD parameters, effectiveness between > 67-100% there are 5 (five) hospitals,effectiveness between > 34 - 67% there is 1 (one) hospital and effectiveness between 0 - 34% there are 2(two) hospitals. Effectiveness based on total coliform parameters, effectiveness between > 67-100% thereare 3 (three) hospitals, effectiveness between > 34-67% there are 3 (three) hospitals and effectivenessbetween 0 - 34% there are 2 (two) hospitals. 2 (two) hospitals cannot evaluate their effectiveness becauseIPAL is not functioning / not functioning. Strategies that need to be carried out include managementstrategies, technical strategies and monitoring strategiesKeywords: Spatial Analysis, Management Effectiveness of Hospital Waste Water Treatment Plants
ANALISIS PENERAPAN KEBIJAKAN PROGRAM GEMBIRA DESA TERHADAP RENCANA PEMBANGUNAN DESA DIKECAMATAN KABAENA SELATAN KABUPATEN BOMBANA (Studi Kasus : Desa Batuawu, Langkema, Ponunu dan Pongkalaero) Ikhfa Yunisa; M. Nastis; Manat Rahim
Jurnal Perencanaan Wilayah Vol 4, No 1 (2019)
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.881 KB) | DOI: 10.33772/jpw.v4i1.7463

Abstract

This study analyzes the management of the Village Joy Program in Kabaena Selatan District,Bombana Regency, based on the application of its functions in the process and stages of activities includingplanning, organizing, actuating, leading, coordinating , Commanding and Motivation (monitoring), andcontrolling (controlling), as well as the management of Gembira Desa funds for the 3 main components ofthe Gembira Desa program include: (1) infrastructure program activities; (2) Development of economic,socio-cultural activities; (3) Strengthening apparatus and community services. This research uses qualitativeresearch design, data collection techniques used are document studies, interviews and direct observation.The research informants were determined by the snowball sampling technique, including technical actors atthe district level, actors in the sub-district, village actors, community institutions and community groups. Theresults showed that (1) The management of the village's happy program had not gone well, where theGembira Desa program managers had not yet coordinated with each other, especially in the management offunds that were not transparent, so that good communication was needed so that the program officials andmanagers could run according to what is expected and the outcome of the village happy program outcomecan be achieved; (2) Management of the Gembira Desa program budget is seen in terms of allocation andrealization of funds, the program of activities has been carried out 100%, both infrastructure developmentactivities, economic, social and cultural development and, strengthening apparatus and community services.In terms of long-term benefit principles, the management of village happy funds is still far from expectations.Keywords: Program Management, Gembira Desa
ANALISIS PENGARUH PERTUMBUHAN PENDUDUK DAN PRODUKTIVITAS LAHAN TERHADAP ALIH FUNGSI LAHAN PERKOTAAN (STUDI KASUS KOTA MARISA) Irwan Wunarlan; Hasbullah Syaf
Jurnal Perencanaan Wilayah Vol 4, No 1 (2019)
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (530.107 KB) | DOI: 10.33772/jpw.v4i1.7464

Abstract

This study aims to show the effect of population growth and land productivity on theconversion of urban land. This study uses data on area size by type of land use per village to measureurban land use. The use of population growth data and land productivity was analyzed using multipleregression and classification typology, the authors found that population growth had a negativeinfluence and land productivity had a positive influence on land conversion. Negative populationgrowth of -3,593 and land productivity of 6,921 will give effect to the conversion of land with an areaof 31,197 Ha. The type of region that experiences land conversion in Marisa City can be classifiedinto three types, namely (1) Areas in the process of land conversion (Marisa Utara) , (2) Areas thatare rapidly shifting land functions (South Marisa, Pohuwato, Teratai, Botubilotahu Indah, Palopo andBulangita), and (3) Areas that have the potential to convert land (Pohuwato Timur). The results of thisstudy indicate that population growth and Land productivity plays an important role in acceleratingthe conversion of urban land in the Marisa City area of Pohuwato Regency.Keywords: population, land productivity, function change, region, city
EVALUASI PELAKSANAAN REKLAMASI LAHAN PENAMBANGAN BIJIH NIKEL PT. WIJAYA INTI NUSANTARA DI KECAMATAN LAEYA, KONAWE SELATAN Kamrullah M Kamrullah M; M. Tufaila Hemon; Hasbullah Syaf
Jurnal Perencanaan Wilayah Vol 4, No 1 (2019)
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (717.516 KB) | DOI: 10.33772/jpw.v4i1.7465

Abstract

This research aims to know the : (1) Implementation of land use, erosion and sedimentationcontrol, revegetation, maintenance and placement of reclamation guarantees based on ForestryMinister's Regulation Number P.60/Menhut-II /2009 about Guidelines for Assessing the Success ofForest Reclamation and Decree of the Minister of Energy and Mineral Resources Number 1827K/30/MEM/2018 about Guidelines for the Implementation of the Principle of Good MiningTechnique; (2) The Suitability of the implementation of the reclamation of the PT. WIN with the planthe pattern space RTRW South Konawe Regency. The research method used is field survey and imageinterpretation with variables namely (1) Implementation of land use, (2) Erosion and sedimentationcontrol, and (3) Revegetation. The research results showed that value the level of success ofreclamation in PT. WIN according Forestry Minister's Regulation Number P.60/Menhut-II/2009 was73,8 with medium category it means reclamation acceptable but still necessary repairs whileaccording to the Decree of the Minister of Energy and Mineral Resources Number 1827K/30/MEM/2018 is 79.04%. The results of the analysis of spatial pattern of space RTRW SouthKonawe Regency with land reclamation PT. WIN is the agricultural utilization of food crop acreagedry land (Moor) and the results of the analysis of the reclamation plan cost calculation of PT. WIN forthe second period of 2015 - 2019 covering an area of 8.58 hectares required Rp. 3,291,882,543, whilethose planned by PT. WIN Rp. 1,980,932,611, -.Keywords: Reclamation, Spatial Patterns, Reclamation Costs
ANALISIS TINGKAT KEKUMUHAN DAN PENINGKATAN PERMUKIMAN PESISIR DI DESA TOROKEKU KECAMATAN TINANGGEA KABUPATEN KONAWE SELATAN Sutrisno Sutrisno; Andi Irwan; Muh. Ramli
Jurnal Perencanaan Wilayah Vol 4, No 1 (2019)
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (552.314 KB) | DOI: 10.33772/jpw.v4i1.7466

Abstract

This study aims to analyze: (1) the level of slums in coastal settlements in South Konawe Regency,(2) efforts to improve the quality of coastal settlements in this Regency. This research was conducted inTorokeku Village, Tinanggea Sub-District, South Konawe Regency. This study uses a quantitative descriptionmethod, and the data was obtained through observation, interviews, and literature studies. The analysis wascarried out by using a location assessment formula based on Minister of Public Works and HousingRegulation No. 02 of 2016 by considering eight criteria: (1) Condition of residential buildings, (2)Environmental road conditions, (3) Clean water supply conditions, (4) Conditions for wastewater treatment,(5) Condition of waste treatment, (6) Fire protection conditions, (7) Coastal environmental conditions and(8) Coastal disaster risk conditions.Based on the results of the analysis, the slum level of coastal settlements in Torokeku Village fallsinto the category of moderate slums. This is caused by the condition of high building density and the numberof uninhabitable houses, damaged road conditions and not yet reaching all the houses, unsufficient cleanwater for the community, the absence of waste water treatment facilities, the absence of waste processing, theabsence of fire protection facilities and the reduction of the mangrov ecosystem. Improving the quality ofsettlements is carried out through rehabilitation and home development in new locations; repairment andimprovement of public facilities and infrastructure such as environmental roads, clean water, waste watertreatment, waste treatment, and fire protection facility; and through the restoration the damage mangrovecosystem.Key words: Level of Slumness, Quality Improvement, Coastal Settlement

Page 1 of 1 | Total Record : 5