PERANCANGAN RUMAH SUSUN SEDERHANA SEWA (RUSUNAWA)KOTA GORONTALO DENGAN PENDEKATAN ARSITEKTUR PERILAKU Pratama Putra, Moh. Noval; Banteng, Beby S.D; Pahrun, Apriyanto A.
Journal Of Building Architecture Vol. 1 No. 2 (2023): BUILDING ARCHITECTURE (OKTOBER)
Publisher : Program Vokasi Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56190/jba.v1i2.12

Abstract

Population density in Indonesia is still a serious problem that has not been resolved to date. migration and urbanization carried out by people from year to year which has an impact on the density of urban areas in certain areas. Seeing that the current condition of the city is no longer possible to build large houses for those who live in urban areas, this is the main reason why it is important to design simple rental flats (Rusunawa) in Gorontalo City using a behavioral architecture approach. The methods used in this research are planning, design and descriptive methods. The sample in this research is site analysis, building plan concepts based on real field data taken from survey samples. The result of this design is the arrangement of outdoor space and spatial planning on the basis of behavior. Simple Rental Flats in Gorontalo City are designed to reduce the negative impact of the spread of slum settlements, changing people's lifestyles is important in environmental planning in Gorontalo City. The main objective of the research on the Rusunawa design itself is to produce housing that accommodates the lives of people with below average economic standards and improves the living environment of the city of Gorontalo which is becoming increasingly slum as time goes by.
PERANCANGAN RUMAH TINGGAL MENGGUNAKAN KONSEP HEMAT ENERGI HUNAWA MOHI, SITI RABIA AR-RAHMA; Algiffar, M. Fauzhan; Pahrun, Apriyanto A.
Journal Of Building Architecture Vol. 1 No. 2 (2023): BUILDING ARCHITECTURE (OKTOBER)
Publisher : Program Vokasi Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56190/jba.v1i2.17

Abstract

Indonesia, with a population of 275,773.8 million people, faces challenges in providing adequate housing. Electricity demand will reach 1,172 kWh per capita in 2022, dominated by fossil energy. The National Energy Council (DEN) seeks to increase the contribution of new renewable energy (EBT) to 25.9% by 2025. Sulawesi Island has various traditional houses, such as Tambii, Tongkonan, Walewangko, Mandar, and Dulohupa. Gorontalo City as the capital of Gorontalo Province has solar energy potential that has not been utilized optimally, especially in residential homes, due to the high price of solar panels. Gorontalo, with its hot climate, can utilize solar energy through solar panels to reduce dependence on conventional electricity. Awareness of energy sustainability and public education regarding renewable energy technology, especially solar panels, are very necessary to create efficient and environmentally friendly homes in line with the objectives of the National Energy Policy.
Perencanaan Peta Jalur Evakuasi Mitigasi Banjir Frans Mitran Ajami; Apriyanto A Pahrun; M. Fauzhan Algiffari
Jurnal Ilmiah Pengabdian dan Inovasi Vol. 2 No. 2 (2023): Jurnal Ilmiah Pengabdian dan Inovasi (Desember)
Publisher : Insan Kreasi Media

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57248/jilpi.v2i2.329

Abstract

Flooding is a serious threat that often hits Libungo Village, Bone Bolango Regency. In order to improve flood risk preparedness and mitigation in this village, the purpose of this service is to plan a clear evacuation route map so as to provide the necessary guidance for villagers to be able to identify safe evacuation routes and carry out efficient evacuations when floods occur. The process of making evacuation route maps will involve collecting topographic, weather, and historical flood data. The data will be processed and analyzed and then enter the stage of the map-making process, namely field surveys to identify optimal evacuation routes. After making the map is complete, counseling is carried out to the community to provide an understanding of the use of evacuation route maps and actions to be taken when floods occur. The method used in this service is the PAR (Participatory Action Research) method, the result of this service is the level of public awareness of anticipating more severe floods. With conclusions Through mapping evacuation zones and planning clear evacuation route maps, people can better understand the steps that need to be taken in emergency situations.
Analisis Keterlambatan Proyek Menggunakan Metode Fault Tree Analysis pada Proyek Amaris Extension Gorontalo Raul Fauzan Ishak; Arfan Utiarahman; Apriyanto Pahrun
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 1 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Februari 2025 - Juli 2025)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i1.182

Abstract

Construction project delays are a critical issue frequently encountered during project implementation. These delays may result from various internal factors such as labor shortages, late material deliveries, and incomplete design plans, all of which directly impact the project completion schedule. The Fault Tree Analysis (FTA) method needs to be applied to the Amaris Extension Gorontalo project to identify and mitigate delay-causing factors that pose a risk to timely project completion. The FTA method is used to identify the root causes of project delays by analyzing the basic failure factors. Data were collected through observations, interviews, and project schedules. The analysis was conducted by constructing a fault tree. This study was carried out on the Amaris Extension Gorontalo project with a duration of 365 days. The results of the study indicate that delays were primarily caused by incomplete design planning, labor shortages, and issues related to materials and execution. The Fault Tree Analysis (FTA) method successfully identified the root causes and the top events with the highest probability of occurrence in weeks 19 and 20. These findings provide a solid foundation for improving future project management.
Analisis Penerapan Rekayasa Nilai Pada Proyek Pembangunan Gedung Laboratorium Terpadu Kemaritiman Sadik Ramdan Katili; Arfan Usman Sumaga; Apriyanto Pahrun
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 1 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Februari 2025 - Juli 2025)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i1.183

Abstract

This study focuses on the analysis of the architectural section of the Maritime Integrated Laboratory Building Development Project, which constitutes a significant portion of the overall project cost. However, this section still has the potential for cost optimization through re-efficiency efforts. Therefore, the application of the Value Engineering (VE) method is necessary to identify and eliminate unnecessary costs and efforts, ultimately reducing the total value or cost of the project while maintaining its function and quality. The data required for this study include the Cost Budget Plan (Rencana Anggaran Biaya/RAB) and Unit Price Analysis (Analisa Harga Satuan Pekerjaan/AHSP). The research method consists of several stages: cost model analysis, breakdown of work items, Pareto analysis to identify high-cost contributors, creative development of design alternatives, and analytical decision-making using Life Cycle Cost (LCC) and the Analytical Hierarchy Process (AHP). Based on the VE analysis, it was found that the most significant cost-saving opportunities were in the wall and floor work components. After replacing the initial designs with the recommended alternatives, the total savings in construction costs reached Rp. 654,697,776.22 from the total architectural cost of Rp. 8,407,006,703.01, resulting in a savings percentage of 7.79%. Additionally, savings from the life cycle cost analysis amounted to Rp. 1,039,066,566.57. These results demonstrate that the Value Engineering approach is effective in achieving cost efficiency without compromising the functional integrity of the project.
Analisis Penerapan Sistem K3 Pada Proyek Pembangunan Gedung Rawat Inap RSUD Hasri Ainun Habibie Nur Indah M. Kau; Arfan Utiarahman; Apryanto A. Pahrun
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 2 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Agustus 2025 - Januari 2026)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i2.237

Abstract

The construction sector is among the industries with the highest rate of workplace accidents, making the implementation of an effective Occupational Safety and Health (OSH) system crucial. This study analyzes the application of OSH practices in the construction project of the Hasri Ainun Habibie Regional Public Hospital’s inpatient building in Gorontalo. Employing a quantitative descriptive approach, data were collected from 15 respondents, including safety experts, contractors, consultants, and workers, using questionnaires and interviews. The data were analyzed using the Relative Importance Index (RII) to assess the level of OSH implementation based on policy, training, use of personal protective equipment (PPE), emergency response procedures, and accident risk management. The findings indicate that the overall implementation of OSH in this project is categorized as “highly applied,” with the highest RII score of 0.93 for worker health insurance coverage and 0.95 for accident handling readiness, reflecting effective emergency preparedness. However, some areas, such as routine health checks and waste management, require further improvement. The study provides practical recommendations for strengthening OSH practices in healthcare facility construction projects, which involve higher safety risks and operational complexity than general construction projects. These findings are expected to serve as references for contractors, consultants, and policymakers in developing adaptive safety strategies aligned with regulatory standards.
Analisa Kinerja Sistem Air Bersih di Desa Ponelo Kecamatan Ponelo Kepulauan Nurain Naha; Aryati Alitu; Apriyanto A. Pahrun
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 2 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Agustus 2025 - Januari 2026)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i2.238

Abstract

This research employs a quantitative approach, which includes assessing community satisfaction with clean water services and testing water quality based on the standards outlined in the Minister of Health Regulation No. 2 of 2023. The results indicate that community perception falls into the "Strong" category at 79.22% regarding water availability during the dry season, but only 55.32% of respondents expressed satisfaction with the clean water program, indicating a relatively low level of satisfaction. It can be concluded that the dry season has a significant impact on the availability and quality of clean water. The quality test results indicate that the water used by the community does not meet the clean water standards set by the Ministry of Health. Several physical and microbiological parameters, such as turbidity and the presence of E. coli and Coliform exceed the permissible limits for potable water. This research recommends that the governmenwor related agencies pay greater attention to clean water treatment in order to maintain water quality.
Aplikasi Microsoft Project Untuk Analisa Kinerja Waktu Dengan Metode Precedence Diagram Method Rosmiyati Yusup; Arfan Utiarahman; Apriyanto Pahrun
Research Review: Jurnal Ilmiah Multidisiplin Vol. 4 No. 2 (2025): Research Review: Jurnal Ilmiah Multidisiplin (Agustus 2025 - Januari 2026)
Publisher : Transbahasa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54923/researchreview.v4i2.269

Abstract

The problem of delays in construction project is a significant challenge because it can impact the timeliness of completion costs, and the quality of the final results. This study aimed to identify the critical activities in the maritime laboratory building construction project and analyze time performance using Microsoft Project software through the Precedence Diagram Method (PDM). The research was conducted using a case study approach based on project data to determine the critical trajectory and analyze time performance. Based on the analysis, the project has 32 critical activities, all of which have a total float of 0, indicating that there should be no delays whatsover. Projects that were originally scheduled for 8 months can be shortened to 7 months through scheduling optimization with the PDM method. Microsoft Project can identify critical activities, provide start and end time information (ES, EF, LS, LF), and support decision-making in time management. Thus, the application of the Microsoft Project-based PDM method has proven to be effective in increasing the efficiency of the completion time of maratime laboratory construction projects.
Evaluasi Rencana Keselamatan Konstruksi terhadap Mitigasi Bencana Pada Proyek Bendungan Bulango Ulu Menggunakan Metode Swot Dinda Puspitasari; Mohammad Yusuf Tuloli; Apryanto A. Pahrun
Indonesian Journal of Fundamental Sciences Vol 12, No 1 (2026)
Publisher : Universitas Negeri Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26858/ijfs.v12i1.88575

Abstract

 Abstrak. Pembangunan Proyek Strategis Nasional Bendungan Bulango Ulu di Gorontalo memiliki potensi risiko tinggi terhadap bencana alam seperti longsor dan gempa, sehingga Rencana Keselamatan Konstruksi (RKK) perlu dievaluasi secara komprehensif, mengingat implementasinya masih terkendala oleh kurangnya disiplin APD, minimnya simulasi darurat, serta gangguan cuaca ekstrem. Penelitian ini bertujuan menganalisis kondisi RKK eksisting dan merumuskan strategi peningkatan mitigasi bencana menggunakan analisis SWOT (Strengths, Weaknesses, Opportunities, Threats). Hasil perhitungan Matriks Grand Strategy menunjukkan selisih faktor internal (sumbu X) sebesar 1,20 (diperoleh dari total skor kekuatan 3.70 dikurangi total skor kelemahan 2.50)  dan eksternal (sumbu Y) sebesar 1.50 (diperoleh dari total skor Peluang 4.00 dikurangi total skor Ancaman 2.50). Dengan koordinat akhir (1.20 ; 1.50), proyek berada pada Kuadran I, yang mengindikasikan bahwa kekuatan internal proyek, seperti adanya SOP khusus bencana dan inspeksi keselamatan berkala, mampu mendukung pemanfaatan peluang eksternal secara optimal. Strategi prioritas yang direkomendasikan adalah Strategi SO (Strengths-Opportunities) atau strategi pertumbuhan, yang berfokus pada pengembangan sistem, peningkatan kompetensi SDM, dan pemanfaatan teknologi, guna meningkatkan efektivitas mitigasi bencana pada proyek bendungan. Kata kunci: RKK, K3, Mitigasi Bencana, SWOT
Evaluation of the Reliability of Multi-Story Buildings in Supporting Long-Term Activities Sazkia Dwi Artha; Mohammad Yusuf Tuloli; Apriyanto A. Pahrun
Indonesian Journal of Fundamental Sciences Vol 12, No 1 (2026)
Publisher : Universitas Negeri Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26858/ijfs.v12i1.89190

Abstract

Abstract. The Faculty of Mathematics and Natural Sciences (MIPA) building of Gorontalo State University is a vital educational infrastructure and must have high structural resilience to support long-term academic activities. This study aims to identify non-structural physical damage and analyze the level of operational reliability of the building. This study uses qualitative methods and visual observations of the physical condition of the building, as well as data analysis regarding aspects of structure, architecture, utilities, and accessibility, thus allowing for grouping of levels of damage: light, moderate, to heavy. Data collection includes direct observation to identify the condition of the building to look for signs of damage. The results of the study showed that the most significant non-structural physical damage was found in the ceiling surface layer, peeling paint on the walls, and damage to door and window frames. From an operational perspective, the structural, architectural, and utility aspects were included in the reliable category with a presentation value above 95%. However, the accessibility aspect only achieved a total presentation of 65.85%, which fell into the unreliable or inadequate category. The results of this evaluation suggest the need for planned repair and maintenance measures, especially regarding accessibility facilities for people with disabilities, to maintain the continuity of the building's function.  Keywords: Building reliability, Non-structural damage, Accessibility, Building structure, Educational facilities