Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Teknik Industri Terintegrasi (JUTIN)

Perbaikan Faktor Daya Pada Sistem Kelistrikan di PT. Pertamina Hulu Rokan Dengan Simulasi Aliran Beban Menggunakan Etap Ridal, Yani
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 3 (2023): July 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i3.17296

Abstract

Electrical energy needs a very significant increase every year and according to the supply voltage to provide enough quality electricity supply. The increase in energy demand is also followed by the demand for reactive power due to increased inductive loads. PT. Pertamina Hulu Rokan is one of the users of quite large inductive loads, because almost at every point of the oil drilling location there are inductive loads installed including transformers and induction motors. In this writing, the author tries to briefly describe the use of bank capacitors used at PT. Pertamina Hulu Rokan. From the data and research results that have been carried out, it can be concluded that, with the addition of bank capacitors to the electrical system at PT.Pertamina Hulu Rokan it can help compensate for the lack of reactive power in the electrical system which is currently being used at PT.Pertamina Hulu Rokan
Studi Analisis Susut Energi Listrik Non Teknis dengan Cara Optimalisasi Peremajaan KWH Meter Pascabayar 1 Phasa di PT. PLN (Persero) ULP Painan Ridal, Yani
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 6 No. 1 (2023): April 2023
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v6i1.18022

Abstract

Loss is the amount of energy lost in the process of distributing electrical energy from the substation to consumers. PT PLN (Persero) ULP Painan losses in the second trimester of 2022 are cumulative with a total value of 3,627,350 kWh. Meanwhile, non-technical losses contributed a total kWh with a value of 841,032 kWh. Therefore, it is necessary to optimize the replacement of kWh meters to reduce non-technical losses by forming an independent replacement team and implementing a routine kWh meter replacement schedule, evaluating Subscription Data that Needs Attention (DLPD) to get Work Orders (WO) that are right on target, establishing communication. both with internal parties (Outsourced Personnel) to obtain accurate WO and implement the SOP for replacing kWh meters in the field. After efforts to optimize kWh replacement, the total loss for the third semester of 2022 was 273,096 kWh, a decrease of 567,936 kWh from the second trimester of 2022. If converted into Rp. 818,324,136 for the second trimester of 2022 while for the third trimester of 2022 Rp. 265,722,408 and savings of Rp. 552,601,728.00. The reduction in non-technical losses above was contributed by the achievement of kWh meter replacement of 49,140 kWh. Saving rupiah obtained from obtaining a kWh meter replacement of Rp. 47,813,220.00, therefore efforts to reduce non-technical losses by optimizing kWh meter replacement can be said to help reduce non-technical losses