Claim Missing Document
Check
Articles

Found 23 Documents
Search

ANALYSIS OF PHYSIOLOGICAL ERGONOMICS FOR NIGHT SHIFT WORKERS CORRELATED WITH SLEEP QUALITY AND TIME TO RECOVERY Sugiono, Sugiono; Yuenyongchaiwat, Kornanong; Azlia, Wifqi; Lukodono, Rio Prasetyo; Putro, Wisnu Wijayanto; Sari, Sylvie Indah Kartika; Indrayadi, Bambang
JEMIS (Journal of Engineering & Management in Industrial System) Vol 11, No 2 (2023)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2023.011.02.5

Abstract

The worker’s recovery time from physical and mental workload is a crucial factor for office and factory management and it will effect on the working performance and design working system. The aim of this paper is to investigate the impact of physiological conditions on sleep quality and time to recovery for night shift electric steam power plant workers. The research is started with study literatures on physiology ergonomics, sleep quality measurement, human metabolism, expenditure energy graph and physical/mental workload. The research worked with 50 samples (age between 30 to 45 years old) who have duty to control the electric steam power plant on dynamic computer screen in the night shift. The Pittsburgh Sleep Quality Index (PSQI) questionnaire was used subjectively to measure the value of sleep quality on 19 self – rated questions that assessed various sleep quality – related factor over the previous month. To know the speed of Time to Recovery (TTR), every worker perform a treadmill load with constant speed of 5 Km/hour for 10 minutes. Heart rate changes before activity, during activity (treatment) and TTR are recorded and it be analysed the pattern of relationship conducting to PSQI score. According to the data analysis, the higher PSQI score the longer time consume by workers to recovery. Moreover, Pearson statistic test results found that there is a strong relationship between sleep quality (PSQI value) and TTR for workers with value of 0.853. In sort, improving the quality of sleep for night shift electric steam power plant workers can definitely improve work performance on a shorter rest time or healthier conditions of workers.
ANALISIS EFEKTIVITAS MESIN CUTTING PLOTTER BERDASARKAN PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS DAN ROOT CAUSE ANALYSIS (STUDI KASUS: PT CIPTA MARGA MANDIRI) Riantono, Maulana Arif Rahman; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 11 No. 8 (2023):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silakan menghubungi author melalui email maulanaarif8900@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 9 November 2023
ANALISIS PROSES PRODUKSI DRUM BRAKE DENGAN METODE VALUE STREAM MAPPING (VSM) DAN FISHBONE DIAGRAM UNTUK MEMINIMASI WASTE DI CV. BUMI BUANA CITRA Azmie, Rezza Naufal; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 3 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail azmierezza@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 14 Juni 2024
ANALISIS PENINGKATAN PRODUKTIVITAS PROSES PRODUKSI BRACKET CONVEYOR MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING PADA PT BEST CRUSHER SENTRALINDOJAYA Shaharani, Regina Nadya Wira; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 3 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail regina.shaharani@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 21 Juni 2024
UPAYA ELIMINASI WASTE PADA PROSES PEMENUHAN KEBUTUHAN PRODUKSI DALAM GUDANG BAHAN BAKU KOSMETIK DENGAN METODE VALUE STREAM MAPPING Linuwih, Checilia Dita Ayu; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 6 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail checiliadita002@email.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 15 Juli 2024
PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI PADA WORKSHOP WOOD GARAGE DUA PUTRA MENGGUNAKAN ALGORITMA RANK ORDER CLUSTERING (ROC) Maulida, Alifia Sukma; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 6 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail aldaalifia18@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 15 Juli 2024
UPAYA PENINGKATAN EFEKTIVITAS STASIUN GILINGAN DENGAN PENDEKATAN TOTAL PRODUCTIVE MAINTENANCE (STUDI KASUS PG KEBON AGUNG) Amnadaroini, Roja; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 6 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail rojaamn0a@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 16 Juli 2024
PENERAPAN KONSEP LEAN SERVICE DALAM UPAYA PERBAIKAN ALUR REKRUTMEN POSISI B2B COMMERCIAL SALES ACCOUNT (STUDI KASUS PT MODA) Azzahra, Raneesya Phrisya; Indrayadi, Bambang; Arifianto, Endra Yuafanedi
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 7 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail raneesyaphrisya@gmail.com, indrayadi_bi@ub.ac.id, atau endra@ub.ac.id Dipublikasikan tanggal: 17 Juli 2024
PERENCANAAN JADWAL INDUK PRODUKSI PRODUK ASA GALON DENGAN METODE PERENCANAAN AGREGAT Defitra, Rizky; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 8 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail rizkydefitra@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 23 Juli 2024
ANALISIS EFEKTIVITAS MESIN ROTARY SCREEN PADA PROSES PRODUKSI PUPUK NPK MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) Rizky, Aldi Reinaldo Nanda; Indrayadi, Bambang
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 9 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail aldireinaldo.nanda@gmail.com atau indrayadi_bi@ub.ac.id Dipublikasikan tanggal: 06 Desember 2024