Claim Missing Document
Check
Articles

Found 19 Documents
Search

ANALISIS BEBAN KERJA PADA PEKERJA OVERHAUL AREA TURBIN DENGAN METODE SUBJECTIVE WORKLOAD ASSESSMENT TECHNIQUE (SWAT) DAN METODE CARDIOVASCULAR LOAD (CVL) DI PERUSAHAAN LISTRIK Pradana, Muhammad Rino; Lustyana, Astuteryanti Tri; Lukodono, Rio Prasetyo
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 5 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail rino.pradana21@gmail.com, astuteryanti@ub.ac.id, atau rio_pl@ub.ac.id Dipublikasikan tanggal: 11 Juli 2024
ANALISIS RISIKO MUSCULOSKELETAL DISORDERS (MSDS) PADA PEKERJA DIVISI PENGIRIMAN TOKO BANGUNAN DENGAN PENDEKATAN REVISED NIOSH LIFTING EQUATION (RNLE) Salim, Efandwi; Lustyana, Astuteryanti Tri; Lukodono, Rio Prasetyo
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 12 No. 6 (2024):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail efandwisalim@gmail.com atau astuteryanti@ub.ac.id atau rio_pl@ub.ac.id Dipublikasikan tanggal: 15 Juli 2024
ANALISIS EVALUASI RUANG KERJA PADA PT BAKRIE METAL INDUSTRIES DENGAN METODE OFFICE ERGONOMICS WORKSTATION ASSESSMENT Wijayakusumah, Alya Rizqiyani; Lustyana, Astuteryanti Tri
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 13 No. 4 (2025):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail alya.rizqiyani@gmail.com atau astuteryanti@ub.ac.id   Dipublikasikan tanggal: 01 Juli 2025
PENGUKURAN BEBAN KERJA DAN PENENTUAN KEBUTUHAN TENAGA KERJA PADA DEPARTEMEN PRODUKSI DENGAN METODE FULL TIME EQUIVALENT (STUDI  KASUS: PERUSAHAAN INDUSTRI MINYAK DAN GAS) Abednego, Homban; Lustyana, Astuteryanti Tri; Lukodono, Rio Prasetyo
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 13 No. 6 (2025):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail homban2006@gmail.com, astuteryanti@ub.ac.id, atau rio_pl@ub.c.id  Dipublikasikan tanggal: 15 Juli 2025
MANAJEMEN RISIKO TEKNOLOGI INFORMASI PADA DIVISI TEKNOLOGI PT INKA (PERSERO) DENGAN METODE OCTAVE DAN FMEA Yunasta, Carla Diva; Andriani, Debrina Puspita; Lustyana, Astuteryanti Tri
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 13 No. 8 (2025):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail carladiyunasta@email.com, debrina@ub.ac.id, astuteryanti@ub.ac.id Dipublikasikan tanggal: 8 Agustus 2025
IMPLEMENTASI BUSINESS PROCESS REENGINEERING DALAM PERANCANGAN ULANG LAYANAN PENGADUAN PELANGGAN DI PERUMDAM KOTA BATU Cahyaning, Dinda Mareta; Kusuma, Lalu Tri Wijaya Nata; Lustyana, Astuteryanti Tri
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 13 No. 9 (2025):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutuhkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail dindamrt@student.ub.ac.id atau eltriwijaya@ub.ac.id atau astuteryanti@ub.ac.id   Dipublikasikan tanggal: 19 Desember 2025
PERANCANGAN DAN IMPLEMENTASI SISTEM PENDUKUNG KEPUTUSAN BERBASIS WEB UNTUK KETERLACAKAN HALAL BERBASIS BAHAN PADA RANTAI PASOK PANGAN MENGGUNAKAN ALGORITMA CART Fridiayanti, Annisa Indah; Andriani, Debrina Puspita; Lustyana, Astuteryanti Tri
Jurnal Rekayasa dan Manajemen Sistem Industri Vol. 13 No. 10 (2025):
Publisher : Program Studi Teknik Industri Fakultas Teknik Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Jika membutunkan abstrak atau isi jurnal silahkan menghubungi author melalui e-mail annisaindahf05@gmail.com, debrina@ub.ac.id, atau astuteriyanti@ub.ac.id Dipublikasikan tanggal: 22 Desember 2025
STUDENTS’ KNOWLEDGE BEFORE AND AFTER EMERGENCY RESPONSE SIMULATION AND ITS RELATIONSHIP WITH SATISFACTION AT ISLAMIC BOARDING SCHOOL IN MALANG, EAST JAVA Sholihah, Qomariyatus; Hardiningtyas, Dewi; Lustyana, Astuteryanti Tri
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 7 No. 2 (2019)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2019.007.02.7

Abstract

Malang city, East Java has several modern Islamic boarding schools that carry out an integrated education curriculum between religious, national and international curricula. In order to support its education process, the schools provide modern facilities in the form of multi-storey buildings. In an Islamic boarding school, it has 6 storey buildings with a height of 3 until 5 floors that must be managed. The school also has to educate around 430 female students and 345 male students in different areas. Emergency response simulation is a crucial activity for the students not only to educate how to respond to an emergency situation but also to evaluate the protection facilities in the school. This research was conducted to identify the students’ knowledge before and after the emergency response simulation and its relationship with the satisfaction of the simulation. A descriptive research method was carried out and the data collection techniques in this study used a questionnaire with 100 respondents from female and male students. The results of the questionnaire that had been obtained were analyzed using the Structural Equation Modeling (SEM) analysis test with AMOS version 23 application. The results of SEM analysis test on the covariance table produced P-Value of <0.01; hence, there is a correlation between the Pre Test and the Post Test results. The results of the linear regression test using ANOVA showed that all independent variables (Pre Test result) have an influence on the Post Test results at 0.396 or 39.6%.
SOLVING LARGE SCALE TRANSPORTATION PROBLEM IN FERTILIZER DISTRIBUTION TO MINIMIZE TRANSPORTATION COST Fanani, Angga Akbar; Rahman, Arif; Lustyana, Astuteryanti Tri; Widiyawati, Sri
JEMIS (Journal of Engineering & Management in Industrial System) Vol 10, No 1 (2022)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis/2022.010.01.3

Abstract

Indonesia is agricultural country which have high degree of dependency to the fertilizer availability, it is because fertilizer has important role for the land fertility. Fertilizer is needed by the farmers all the time, from the initial period of planting the crop to the harvest period. This condition requires the fertilizer industry to be able to deliver fertilizer exactly when fertilizer is needed. The complexity of the transportation problem is indicated by the number of nodes in the model that represent both source and destination. In the distribution of fertilizer, the number of sources is relatively small, but the number of destinations is very large, where the number reaches 50 destination points. In solving large scale transportation complex problems, modeling techniques using Linier Programming are needed. Fertilizer demands are fulfilled from 42 buffer warehouses, and the optimal allocation for petrochemical distribution is supplied by 47 production partners. Based on the results of the calculation process using linier programming, the optimal distribution cost is 939,854,960.00 rupiahs. Meanwhile, the initial cost of distribution is IDR 1,032,267,660.00. There was a decrease of 92,412,700.00 rupiahs or about 9%. Optimization of the distribution process is also marked by the decrease in the number of production partners needed to meet the needs of 42 buffer warehouses. In the initial distribution, 56 production partners sent their products, after the calculation process only 47 production partners were needed.