Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : Civil Engineering Scientific Journal

ANALISIS KESEHATAN DAN KESELAMATAN KERJA (K3) PADA PROYEK BANGUNAN AIR MENGGUNAKAN METODE HAZARD IDENTIFICATION AND RISK ASSESSMENT (HIRA) Singal, Rachel Zandra; Darmawan, Rendy Andre
Civil Engineering Scientific Journal Vol 3, No 2 (2024): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v3i2.5788

Abstract

ABSTRACT: The construction services sector is one of the many business fields that are classified as very vulnerable to accidents. The purpose of the research on the Jelarai river reinforcement water building project is to determine the potential risks, determine the level of risk, and provide control of the risk of work accidents. This study uses the Hazard Identification and Risk Assessment (HIRA) method. The results of the study, there are 4 types of jobs that have a potential risk of work accidents, namely deck slab work has 8 potential sources of risk; Tetrapod jobs have 6 potential sources of risk; The KRIB job has 6 potential risk sources and the Akmond Block job has 3 potential risk sources. So that work activities with a low risk level determination as many as 8 sources are 34.78%; medium risk level (Moderate) 9 sources 39.14%; High risk category 1 source 4.35% and in the Extreme risk category there are 5 sources 21.74%. Efforts that can be made to reduce risks that may occur include tightening supervision of every worker activity, enforcing Standard Operating Procedures (SOPs) on each activity, providing safety signs in certain areas that may cause potential dangers, providing Personal Protective Equipment (PPE) in accordance with the work carried out and enforcing rules in accordance with the laws set by the Republic regulations Indonesian. Keywords: Occupational Safety and Health (OHS), HIRA Method, Water Buildings, Risk Control, River Reinforcement.ABSTRAK: Bidang jasa konstruksi merupakan salah satu dari sekian banyak bidang usaha yang tergolong sangat rentan terhadap kecelakaan. Tujuan dari penelitian pada proyek bangunan air pekerjaan perkuatan sungai Jelarai adalah mengetahui potensi risiko, menentukan besar tingkat risiko, dan memberikan pengendalian risiko kecelakaan kerja. Penelitian ini menggunakan metode Hazard Identification and Risk Assessment (HIRA). Berdasarkan hasil penelitian terdapat 4 jenis pekerjaan yang mempunyai potensi risiko kecelakaan kerja, yaitu pekerjaan deck slab mempunyai 8 sumber potensi risiko; pekerjaan tetrapod mempunyai 6 sumber potensi risiko; pekerjaan krib mempunyai 6 sumber potensi risiko dan pekerjaan akmond blok mempunyai 3 sumber potensi risiko. Sehingga aktivitas pekerjaan dengan penentuan tingkat risiko rendah (Low) sebanyak 8 sumber 34,78%; tingkat risiko menengah (Moderate) 9 sumber 39,14%; kategori risiko tinggi (High) 1 sumber 4,35% dan pada kategori tingkat risiko ekstrim (Extreme) terdapat 5 sumber 21,74%. Upayah yang dapat dilakukan untuk mengurangi resiko yang mungkin terjadi antara lain dengan memperketat pengawasan terhadap setiap aktivitas pekerja, memberlakukan Standar Operasional Prosedur (SOP) pada setiap kegiatan, memberikan safety sign pada area tertentu yang memungkinkan menimbulkan potensi bahaya, menyediakan Alat Pelindung Diri (APD) yang sesuai dengan pekerjaan yang dilaksanakan dan memberlakukan aturan sesuai dengan perundang-undangan yang ditetapkan oleh peraturan Republik Indonesia.Kata kunci: Keselamatan Dan Kesehatan Kerja (K3), Metode HIRA, Bangunan Air, Pengendalian Risiko, Perkuatan Sungai.
ANALISIS KARAKTERISTIK SEDIMEN BERDASARKAN BUTIR SEDIMEN PADA KAWASAN SUNGAI SELOR ATAU SUNGAI BUAYA DI KABUPATEN BULUNGAN Singal, Rachel Zandra; Maharani, Larasati Nur
Civil Engineering Scientific Journal Vol 4, No 1 (2025): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v4i1.6307

Abstract

ABSTRACT: Based on field observations, Sungai Buaya/Sungai Selor has a problem, namely sediment piles where the sediment piles are overgrown with water hyacinth and other aquatic plants, thus inhibiting the flow of river water. As a result, the river does not function properly. The formulation of the problem in this study is how are the characteristics of sediment grains in the waters of Sungai Selor/Sungai Buaya. The purpose of the study was to determine the size of sediment grains, the shape of sediment grains and the specific gravity of sediment grains in the waters of Sungai Selor/Sungai Buaya. The method used in this study was to take samples in the field by random sampling at 6 points in the location of Sungai Selor/Sungai Buaya. Sediment characteristic analysis was conducted in the laboratory, namely testing the size of sediment grains using the sieve analysis method in accordance with the ASTM D 422 standard, determining the shape of sediment grains using a microscope and testing the specific gravity of sediment based on SNI 1964: 2008. The results of the analysis showed that the type of sediment in the Selor River/Buaya River consisted of coarse sand with a grain size of 0.850 mm and medium sand with a size between 0.250 mm - 0.425 mm. The shape of sediment grains that dominate the waters of the Selor River or Buaya River is sub-angular with high sphericity, angular with medium sphericity; sub-rounded with medium sphericity; rounded with high sphericity; rounded with low sphericity. The specific gravity test that has been carried out obtained the results of the specific gravity of sediment in the Selor River/Buaya River between 2.128 - 2.609.Keywords: Sediment Characteristics, Sediment Grain Size, Sediment Form, Sediment Specific Gravity, Selor River/Buaya River. ABSTRAK: Berdasarkan pengamatan di lapangan bahwa Sungai Buaya/Sungai Selor memiliki permasalahan yaitu tumpukan sedimen dimana tumpukan sedimen itu ditumbuhi enceng gondok dan tanaman air lainnya,  sehingga menghambat aliran air sungai. Akibatnya sungai tidak berfungsi dengan baik. Rumusan masalah pada penelitian ini adalah bagaimana karakteristik butir sedimen pada perairan  Sungai Selor/Sungai Buaya. Tujuan penelitian adalah untuk mengetahui ukuran butir sedimen, bentuk butir sedimen dan berat jenis butir sedimen di perairan Sungai Selor/Sungai Buaya. Metode yang digunakan pada penelitian ini adalah dengan pengambilan sampel di lapangan dengan cara random sempling pada di 6 titik di lokasi Sungai Selor/Sungai Buaya. Analisa karakteristik sedimen dilakukan di laboratorium yaitu pengujian ukuran butir sedimen dengan menggunakan dengan metode analisa saringan yang sesuai dengan standar ASTM D 422, penentuan bentuk butir sedimen dilakukan menggunakan mikroskop dan pengujian berat jenis sedimen dilakukan berdasarkan SNI 1964 : 2008. Hasil analisa didapatkan jenis  sedimen di Sungai Selor/Sungai Buaya terdiri dari pasir kasar dengan ukuran butir 0,850 mm dan pasir sedang dengan ukuran antara 0,250 mm – 0,425 mm. Bentuk butir sedimen yang mendominasi perairan Sungai Selor atau Sungai Buaya adalah berbentuk menyudut tanggung dengan kebulatan tinggi (sub-angular with high sphericity berbentuk menyudut dengan kebulatan sedang (angular with medium sphericity); berbentuk membundar tanggung dengan kebulatan sedang (sub-rounded with medium sphericity); berbentuk membundar dengan kebulatan tinggi (rounded with high sphericity); berbentuk membundar dengan kebulatan rendah (rounded with low sphericity). Uji berat jenis yang telah dilakukan mendapatkan hasil berat jenis sedimen di Sungai Selor/Sungai Buaya antara 2.128 – 2,609.Kata kunci: Karakteristik Sedimen, Ukuran Butir Sedimen, Bentuk Sedimen, Berat Jenis Sedimen, Sungai Selor/Sungai Buaya
ANALISIS ANGKUTAN SEDIMEN DASAR (BED LOAD) PADA SUNGAI SELOR DI KECAMATAN TANJUNG SELOR KABUPATEN BULUNGAN Singal, Rachel Zandra; Nur, Mardhawiah
Civil Engineering Scientific Journal Vol 4, No 2 (2025): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v4i2.6626

Abstract

ABSTRACT: Selor River is 6.7 km long, which passes through Buluh Perindu and Tanjung Rumbia areas in Kelurahan Tanjung Selor Hilir. The condition of Selor River is mostly sediment accumulation in several parts of the Selor River flow. The sedimentation problem that occurs continuously will cause shallowing which will affect the reduction in the flow capacity of the Selor River. The purpose of this study was to determine the bed load in the Selor River flow. Sediment data collection in the Selor River flow at four points using the purposive random sampling method. Sediment sampling at these four points was to fulfill the factors for sedimentation formation and to represent sediment conditions along the Selor River flow. Analysis of the large bed sediment load using the Mayer Petter Muller method using measurement data on one wet cross-section, average water depth, average speed, river bed slope and bed sediment grain diameter for bed sediment calculations. The sampling of bottom sediment was continued with sample testing at the Bina Marga DPUPR Kabupaten Bulungan laboratory, obtained data on sediment water content, sediment specific gravity and sieve analysis, resulting in a large bottom sediment grain diameter of D90 and from the sieve analysis it was produced that the diameter of grains passing sieve No. 4 (4,750 mm) was 98.4%; passing sieve No. 90 (0.175) was 23.33%. The results of the analysis of the large load of bottom sediment transport in the Selor River in the form of a bottom sediment discharge in a period of one day of 5.9616 Tons/day, a bottom sediment discharge in a period of one year of 2,175.984 Tons/year. Keywords: Bed Load Sediment, Sedimentation, Debit Sediment, Selor River, Mayer Petter Muller. ABSTRAK: Sungai Selor memiliki panjang 6,7 Km, yang melewati daerah Buluh Perindu dan Tanjung Rumbia wilayah Kelurahan Tanjung Selor Hilir. Kondisi Sungai Selor sebagian besar terjadi penumpukan sedimen pada beberapa bagian aliran Sungai Selor. Permasalahan sedimentasi yang terjadi tersebut secara terus menerus akan menyebabkan pendangkalan yang berpengaruh terhadap penurunan kapasitas aliran sungai Selor. Tujuan dari penelitian ini adalah untuk mengetahui debit sedimen dasar (bed load) pada aliran Sungai Selor. Pengambilan data sedimen di aliran Sungai Selor pada empat titik dengan metode pengambilan data adalah menggunakan metode purposive random sampling. Pengambilan sampel sedimen pada empat titik ini adalah untuk  memenuhi faktor- faktor terbentuknya sedimentasi dan dapat mewakili kondisi sedimen sepanjang aliran Sungai Selor. Analisis besar muatan sedimen dasar dengan mengunakan metode Mayer Petter Muller dengan menggunakan data ukur pada satu penampang basah, kedalaman air rata-rata, kecepatan rata-rata, kemiringan dasar sungai dan diameter butiran sedimen dasar (bed load) untuk perhitungan sedimen dasar (bed load). Pengambilan sampel sedimen dasar dilanjutkan dengan pengujian sampel di laboratorium Bina Marga DPUPR Kabupaten Bulungan diperoleh data kadar air sedimen, berat jenis sedimen dan analisa saringan, dihasilkan besar sedimen dasar diameter butiran D90 dan dari analisa saringan dihasilkan diameter butiran lolos saringan No.4 (4,750 mm) adalah 98,4% ; lolos saringan No.90 (0,175) adalah 23,33%. Hasil analisis besar muatan angkutan sedimen dasar pada sungai Selor berupa debit sedimen dasar dalam jangka waktu satu hari sebesar 5,9616 Ton/hari, debit sedimen dasar dalam jangka waktu satu tahun sebesar 2.175,984 Ton/tahun.Kata kunci: Sedimen Dasar, Sedimentasi, Debit Sedimen, Sungai Selor, Mayer Petter Muller.
KAJIAN PEMANENAN AIR HUJAN SEBAGAI ALTERNATIF SUMBER AIR BERSIH DI PERKOTAAN Singal, Rachel Zandra; Sakkia, Nur
Civil Engineering Scientific Journal Vol 4, No 3 (2025): Civil Engineering Scientific Journal
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/cesj.v4i3.7173

Abstract

ABSTRACT: Rainwater Harvesting (RWH) is a method used to collect and store rainwater from rooftops, buildings, or the ground during rainy seasons, as a source of clean water. Rainwater utilization can be used to address clean water scarcity, reduce runoff volume, and replenish groundwater, especially in urban areas. Tanjung Selor, the capital of North Kalimantan Province, is experiencing rapid development, particularly in housing development, due to its rapid population growth. Conditions in urban areas, particularly Tanjung Selor, have resulted in high demand for clean water, which can lead to water shortages in residential areas and surrounding areas. Rainwater harvesting is an alternative to reduce clean water shortages. Rainwater harvesting can meet water needs while simultaneously saving on the use of PDAM (State Water Company) and groundwater. Rainwater that can be collected by the Rainwater Harvesting system in the Global KM 6 Housing with a roof area of 36 m2 type houses each month is a minimum of 2.37 m3 and a maximum of 31,26 m3. The needs of each housing unit with an estimated number of occupants of 3 people are 10,8 m3 each month. So the volume of rainwater harvested from the PAH system for minimum conditions compared to the water needs of each housing unit is still insufficient to meet the need for clean water. And the volume of rainwater harvested from the PAH system for maximum conditions compared to the water needs of each housing unit is sufficient to meet the need for clean water in the housing. If the RWH conditions are minimal, it is recommended that additional clean water from other sources, namely PDAM for housing.Keywords: Rainfall, Clean Water, Groundwater, Building Roofs, Tanjung SelorABSTRAK: Pemanenan Air Hujan (PAH) merupakan cara yang digunakan untuk mengumpulkan dan menyimpan air hujan dari atap rumah, atap gedung atau di permukaan tanah pada saat hujan, sebagai salah satu sumber air bersih.  Pemanfaatan air hujan dapat digunakan untuk mengatasi permasalahan kelangkaan air bersih, mengurangi volume air limpasan hujan dan mengisi kembali air tanah terutama di perkotaan. Tanjung Selor merupakan Ibu Kota Provinsi Kalimantan Utara yang sedang berkembang terutama pembangunan perumahan karena pesatnya pertumbuhan penduduk. Kondisi di perkotaan khususnya kota Tanjung Selor ini memicu konsekuensi bahwa kebutuhan air bersih yang tinggi dapat memicu pula kelangkaan air bersih di wilayah perumahan dan sekitarnya. Pemanenan Air Hujan  merupakan salah satu alternatif untuk mengurangi terjadinya kekurangan air bersih. Sehingga panen air hujan dapat memenuhi kebutuhan air sekaligus dapat menghemat pengunaan PDAM ataupun air tanah. Air hujan yang dapat ditampung dengan sistem Pemanenan Air Hujan di Perumahan Global KM 6 dengan luas atap rumah type 36 M2 tiap bulannya minimal adalah 2,37 m3 dan maksimal 31,26 m3. Kebutuhan tiap unit rumah dengan estimasi jumlah penghuni 3 orang yaitu 10,8 m3 tiap bulan. Sehingga jumlah volume air hujan yang di panen dari sistem PAH untuk kondisi minimal  dibandingkan kebutuhan air pada tiap unit rumah  masih kurang untuk memenuhi kebutuhan air bersih. Dan jumlah volume air hujan yang di panen dari sistem PAH untuk kondisi maksimal  dibandingkan kebutuhan air pada tiap unit rumah  cukup untuk memenuhi kebutuhan air bersih di perumahan.  Jika kondisi PAH minimal disarankan perlu penambahan air bersih dari sumber lain yaitu PDAM untuk perumahan.Kata kunci: Curah Hujan, Air Bersih, Air Tanah, Atap Bangunan, Tanjung Selor