Rekonfigurasi Jaringan 20 kV Feeder Balam Dengan Metoda Binary Particle Swarm Optimization (BPSO) Di PT. PLN (Persero) Bagan Batu Simanjuntak, Roberto; Tanjung, Abrar; Zulfahri, Zulfahri; Putra Halilintar, Masnur
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 5 No. 2 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v5i2.6326

Abstract

Distribution of electrical energy by PT. PLN (Persero) Bagan Batu Rayon is supplied by a 20 kV feeder Balam distribution channel through Bagan Batu Substation. The total length of the Balam feeder network is 85,550 kms, the Balam feeder load to meet electrical energy needs is quite high. So that it causes power losses and voltage drop is quite high. To reduce the occurrence of voltage drop and on bus 10, 11,12,13,14 and 15 with the lowest voltage at the end of the channel reaches 16,7 kV. Analysis with Newton Rapshon method using MATLAB (R2007b) software is used to determine the results of voltage and power loss to be minimized. Based on the results of the discussion on the condition of the lowest voltage of 16.7 kV with an active power of 0.045 MW and reactive 0.121 MVAr on the bus 10.11,12,13,14 and 15. After reconfiguration using Newton Rhapson method with MATLAB (R2007b) software, obtained the lowest voltage of 19.2 kV with an active power of 0.039 MW and reactive power of 0.101 MVAr on the second reconfiguration. The results of the research show that by designing two new channels with the Binary Particle Swarm Optimization (BPSO) method can find a new configuration that minimizes losses. Active power losses resulting from the new reconfiguration are 0.027 MW and reactive power is 0.092 MVAr.
Analisis Eksitasi Generator Unit 3 Pembangkit Listrik Tenaga Gas (PLTG) Teluk Lembu PT. PLN (Persero) Sektor Pembangkitan Pekanbaru Ramadhan; Zondra, Elvira; Putra Halilintar, Masnur
SainETIn : Jurnal Sains, Energi, Teknologi, dan Industri Vol. 6 No. 1 (2021): SainETIn
Publisher : Teknik Elektro Universitas Lancang Kuning

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31849/sainetin.v6i1.7318

Abstract

Pembangkit Listrik Tenaga Gas (PLTG) Teluk Lembu merupakan salah satu pembangkit listrik yang terdapat di area Pusat Kota Pekanbaru. Dengan masing-masing unit memiliki kapasitas daya 21,6 MW. Guna peningkatan keandalan sistem maka akan dilakukan analisa eksitasi pada PLTG Teluk Lembu Unit 3 dengan membandingkan analisa arus eksitasi (If) terhadap daya reaktif (Q) dan terhadap tegangan induksi (Ea) yang ditimbulkan. Dalam melakukan penelitian data yang diambil adalah berupa data aktual diambil dari log sheet dan spesifikasi generator. Dari data loghseet harian pada tanggal 01 hingga tanggal 04 bulan Agustus 2020 arus eksitasi yang dirangkum dari nilai arus eksitasi terendah hingga nilai tertinggi dari mulai arus eksitasi terendah 143 A dengan daya reaktif 2,1 MVAr dan arus eksitasi tertinggi 156 A dengan daya reaktif 2,4 MVAr dan hubungan arus eksitasi terhadap tegangan induksi pada arus eksitasi 143 A terdapat tegangan induksi menghasilkan 15,686 kV dan arus eksitasi 156 A menghasilkan tegangan induksi yang lebih tinggi yaitu 15,827 kV. Dengan meningkatnya beban berpengaruh terhadap menurunya tegangan output. Untuk menstabilkan tegangan output maka perlu menaikan arus eksitasi generator.