Pelayanan Publik dan Kajian Putusan Korupsi Pengadaan Jasa Konstruksi dalam Perspektif Kontrak Jasa Konstruksi: Civil Engineering Perspective Kombong, Eka Priska; Nugroho, Arief Setiawan Budi; Wibowo, Richo Andi
Integritas : Jurnal Antikorupsi Vol. 6 No. 2 (2020): INTEGRITAS: Jurnal Antikorupsi
Publisher : Komisi Pemberantasan Korupsi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32697/integritas.v6i2.665

Abstract

Infrastructure Availability such as government buildings, schools, hospitals are pivotal to underpin public services. The existence of infrastructure like irrigations, ports, roads, bridges, are also important to support social and economic activities of the people. However, the process of procurement in acquiring contractor may be tainted by corruption. This article examines various court decisions which have been final and binding. Three of the selected decisions are appealing to be discussed further, because it is doubted that the legal enforcers have been appropriately enforcing the law and understanding the context. On the first case, the legal enforcers have enforced the anti-corruption law to cases which are detrimental to the state finance. However, the substance of the cases is more suitably categorized as bribery or at least as gratification. On the last two cases, the legal enforcers have applied anti-corruption law for cases that cause the state financial loss. Nevertheless, from the perspective of civil engineering, whether the defendants were guilty are still debatable.
Kajian Penyimpangan Pelaksanaan Pekerjaan Konstruksi yang menjadi Dakwaan Praktik Korupsi di Indonesia Eka Priska Kombong; Arief Setiawan Budi Nugroho; Richo Andi Wibowo
Jurnal Teknik Sipil Vol 28 No 2 (2021): Jurnal Teknik Sipil
Publisher : Institut Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.5614/jts.2021.28.2.11

Abstract

Abstrak Permasalahan konstruksi tidak jarang menjadi indikator adanya penyimpangan perilaku pihak-pihak yang terlibat dalam suatu proyek konstruksi termasuk penyimpangan tindak pidana korupsi. Tingginya kasus korupsi pada pengadaan dan pelaksanaan proyek konstruksi menjadi latar belakang dilakukannya penelitian ini. Telaah mendalam terhadap permasalahan dan penyimpangan yang menjadi dasar putusan hakim dalam memutuskan kasus konstruksi menjadi kasus korupsi merupakan tujuan dari penelitian ini. Data yang digunakan berupa putusan-putusan kasasi kasus korupsi diperoleh dari laman repositori Mahkamah Agung. Hasil kajian menunjukan bahwa umumnya permasalahan dan penyimpangan yang terjadi pada kasus korupsi proyek konstruksi adalah berupa hasil-hasil pekerjaan yang tidak sesuai dengan kontrak, baik secara kualitas maupun kuantitas, yang pada akhirnya penyimpangan tersebut diputuskan sebagai perbuatan melawan hukum oleh hakim. Pejabat pemerintah dan/atau penyedia jasa yang menangani proyek menjadi pihak yang dianggap lalai atas terjadinya penyimpangan yang mengakibatkan kerugian negara sehingga dinyatakan telah melakukan tindak pidana korupsi meskipun bentuk umum tindak pidana korupsi tidak selalu terdapat di dalamnya. Berdasarkan kajian terhadap 18 putusan kasus korupsi, hanya terdapat empat kasus yang mengadung tindak pidana korupsi berupa tindakan suap-menyuap, pemerasan dan benturan dalam kepentingan, serta 14 putusan lainnya secara umum berupa ketidaksesuaian pekerjaan dengan kontrak yang kemudian juga dikategorikan sebagai bentuk tindak pidana korupsi. Kata-kata kunci: Permasalahan konstruksi, penyimpangan proyek, kasus korupsi, putusan Mahkamah Agung, kerugian negara. Abstract Specifications unfulfillment frequently becomes an indicator of construction project deviations, including corruption. The high number of corruption cases in the procurement and implementation of construction projects is the background for this research. To dig in-depth knowledge of the circumstance, we carried out a study to find the issues and deviation in the implementation of construction projects which wew used as the basis for the judge’s decision. We obtained data on the corruption of construction projects from cassation decisions on the Mahkamah Agung repository page. The result shows that, in general, the deviation issues occurred due to the differences between implemented works and the contract, which the judges considered them as unlawful acts. The staff of government representatives who in charge of handling the project and or person in charge of the construction providers subsequently became a party deemed negligent of such deviations and state losses. They are declared to have committed a criminal act of corruption even though there is not always any direct evidence of general forms of corruption. Study of 18 supreme court decisions, we found that there were only four cases were proven to contain corruption in the chronology of the verdicts: an act of bribery, extortion, and conflicts of interest and 14 other were generally in the form of a work inconsistencies with the contract which was later also categorized as corruption. Keywords: Construction problems, project deviation, corruption cases, supreme court decisions, state losses.  
ANALYSIS OF STABILITY OF SLOPE AND EMBANKMENT AT LANDFILL USING THE 2012 GEOSTUDIO SLOPE/W PROGRAM Eka Priska Kombong; Harni Eirene Tarru; Marchelina Rante
Journal Dynamic Saint Vol. 7 No. 2 (2022): Jurnal Dynamic Saint
Publisher : Publikasi dan UKI Press UKI Toraja.

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47178/dynamicsaint.v7i2.1899

Abstract

The increase in waste production every year continues to increase along with the increasing rate of population growth in Indonesia so that the construction of landfills is something that needs special attention from the government. The disaster that has occurred related to landfills is the landslide disaster at the Leuwijgajah landfill, West Java, which claimed up to 156 people. Therefore, landfill slope stability analysis is a very important parameter in determining the feasibility of a landfill construction. This study aims to analyze the stability of slopes and embankments at the Banjar Bakula Regional Waste Landfill, South Kalimantan using Slope/W. The analysis was carried out using two models, namely using the initial planning design and analyzing based on the PUPR Ministerial Regulation 03/PRT/M/2013 concerning the Implementation of Waste Infrastructure and Facilities in the Handling of Household Waste and Types of Household Waste. The results of this study indicate that the slopes of the landfill and embankments at the Banjar Bakula Regional Landfill are declared safe with a safety factor value above 1.5, namely 1.558 – 1.651 for modeling with the initial planning design and 2.052 – 2.068 for modeling based on the PUPR Ministerial Regulation 03/PRT/M/2013, and 1.943 – 2.168 for the safety factor from embankment.
Study of the Use of Cigarette Butt Filters and Rice Husk Ash as Additional Materials for Making Concrete Tile Roofs Eka Priska Kombong; Israel Padang; Henrianto Masiku
Journal Dynamic Saint Vol. 8 No. 1 (2023): Journal Dynamic Saint
Publisher : Publikasi dan UKI Press UKI Toraja.

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Puntung rokok merupakan benda sisa yang terkecil dari rokok yang cenderung dipandang sebelah mata dan seringkali dibuang sembarangan. Untuk mendapatkan kualitas beton mutu tinggi dengan memperhitungkan biaya, terdapat beberapa cara yang dilakukan di antaranya perlu di perhatikan komponen-komponen penyusunnya. Tujuan penelitian ini yaitu memanfaatkan filter puntung rokok dan abu sekam padi sebagai bahan tambah pembuatan atap genteng beton sehingga diharapkan meningkatkan mutu kualitas atap dan menjadi solusi atas penanganan masalah puntung rokok yang ada di Indonesia. Penelitian ini menggunakan metode eksperimental dan cetakan atap genteng beton manual berukuran 42 cm x 33 cm. Masing-masing pengujian terdiri dari 2 benda uji, genteng beton normal dan genteng beton dengan variasi penambahan filter puntung rokok 10 gram, 15 gram, 20 gram, 25 gram, dan 30 gram. Pengujian dilakukan pada umur 28 hari dengan dilakukan perawatan terlebih dahulu sebelum pengujian. Hasil pengujian rembesan air dalam penelitian ini memenuhi syarat yang mengacu pada SNI 0096:2007. Beban lentur untuk kelima variasi genteng beton penambahan filter puntung rokok dan pengurangan pasir tersebut telah memenuhi standard SNI 0096 : 2007. Persentase peningkatan beban lentur genteng beton pada variasi 10 gr 0,07%, 15 gr 7,97%, 20 gr 24,51%, 25 gr 100,23%, dan 30 gr 150,28%. Hasil pengujian penyerapan panas atap genteng beton dengan bahan tambah filter puntung rokok yang telah diuji dengan suhu ruang tertinggi pada variasi filter 30 gram yaitu T1=51°C, T2=32°C, mengalami penurunan akibat penyerapan panas sebesar 19°C atau sebesar 37,25%.
Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pile Cap Menggunakan Macro VBA Kombong, Eka Priska
Jurnal Komposit: Jurnal Ilmu-ilmu Teknik Sipil Vol. 9 No. 1 (2025)
Publisher : Universitas Ibn Khaldun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/komposit.v9i1.16587

Abstract

Increased development is directly proportional to the absorption of labour in the construction sector. Nevertheless, the large number of workers does not guarantee the quality and productivity of a job. Labor productivity is the first indicator to assess the success of construction work so it needs to be analysed. This study aims to calculate the productivity of labours on pile cap for the construction of the Manohara Hotel, Yogyakarta, using Monte Carlo simulations and the Macro VBA program. The results of the analysis are divided into three parts, among others: the work productivity of the work floor, the installation of bricks as pile cap walls and the work of pile cap reinforcement. In general, the results of the study show that the productivity of the pile cap work is quite good, where the productivity of the work floor is 0.22 m3/hour with an average idle time of 12 minutes or an average worker break of 13.04% during the working time from 18.30–20.00 WIB; the lowest brick installation productivity was 12.38 bricks/hour with an idle average of 8.3 minutes or 14.27% during processing time from 15.30-16.30 WIB; and the lowest reinforcement installation productivity is in the bottom reinforcement work of 60 reinforcement/hour with an average idle of 10.69 minutes or an ineffective worker time of 50.8% of the total work time.
Analisis Erosi Menggunakan Sistem Informasi Geografis pada Daerah Aliran Sungai (DAS)Kamp Wolker Waena - Jayapura Widyastuti, Ira; Dualembang, Hery; Paseru, Riswandy Loly; Sanggamele, Herlina; Kombong , Eka Priska
Jurnal Teknik Sipil MACCA Vol. 10 No. 1 (2025): Jurnal Teknik Sipil MACCA (FEBRUARI 2025)
Publisher : Universitas Muslim Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33096/0e64gz27

Abstract

Erosi merupakan proses pelepasan dan pemindahan partikel tanah dari satu tempat ke tempat lain, yang umumnya disebabkan oleh aktivitas air hujan maupun angin. Dalam konteks Daerah Aliran Sungai (DAS), proses ini menyebabkan terjadinya akumulasi sedimen di saluran sungai yang berakibat pada penurunan kapasitas tampung aliran air. DAS Kamp Wolker menjadi wilayah yang strategis dalam aktivitas eksploitasi dan ekstraksi material karena keberadaan endapan sedimen serta batuan yang melimpah di sepanjang aliran sungai. Terbentuknya endapan tersebut erat kaitannya dengan proses erosi yang terus berlangsung di kawasan tersebut. Penelitian ini bertujuan untuk mengidentifikasi nilai laju erosi serta melakukan klasifikasi tingkat erosi di DAS Kamp Wolker dengan menggunakan pendekatan Universal Soil Loss Equation (USLE) yang diintegrasikan dengan analisis Sistem Informasi Geografis (SIG). Metode USLE melibatkan lima parameter utama, yaitu faktor erosivitas curah hujan (R), erodibilitas tanah (K), panjang dan kemiringan lereng (LS), pengelolaan tanaman (C), serta tindakan konservasi tanah (P). Melalui teknik overlay spasial, nilai erosi dihitung dan diklasifikasikan ke dalam lima kategori tingkat bahaya erosi, yaitu sangat ringan, ringan, sedang, berat, dan sangat berat. Hasil analisis menunjukkan bahwa rata-rata laju erosi di DAS Kamp Wolker mencapai 2,989 ton/ha/tahun. Distribusi kelas erosi di wilayah tersebut meliputi: sangat ringan (75,18%), ringan (10,96%), sedang (7,86%), berat (4,72%), dan sangat berat (1,32%). Temuan ini memberikan gambaran yang jelas mengenai kondisi kerentanan lahan terhadap erosi, yang dapat menjadi dasar dalam penyusunan strategi konservasi tanah dan pengelolaan DAS yang berkelanjutan.