Claim Missing Document
Check
Articles

Found 3 Documents
Search

Perencanaan Alternatif Dinding Penahan Badan Jalan (Kantilever) Pada Ruas Jalan Pulau Haruku Dahoklory, Hendrik; Hutubessy, Vector R. R.; Matitaputty, Apri Adam
JURNAL MULTIDISIPLIN ILMU AKADEMIK Vol. 2 No. 1 (2025): Februari
Publisher : CV. KAMPUS AKADEMIK PUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61722/jmia.v2i1.3988

Abstract

The construction of a retaining wall at this location was due to landslides caused by high rainfall in the area. The purpose of this planning is to determine the characteristics of the soil at the research location and determine the stability of the road retaining wall designed using a cantilever on the stability of rolling forces, shear forces and soil bearing capacity. The method used is the Terzaghi method as a planning reference. Then the results of the stability analysis of the road body retaining walls are, shifting stability with a value of 1,444 <1.5, stability against overturning 2,632 > 1.5 and bearing capacity stability 10,132 > 3.
Perhitungan Rencana Anggaran Biaya Terhadap Struktur Gedung Hotel Nunusaku Di Wilayah Kota Ambon Huwae, Semuel; Henry Roberth, Herry; Hutubessy, Vector R. R.
KOLONI Vol. 4 No. 1 (2025): MARET 2025
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v4i1.714

Abstract

Hotels are also one of the complex types of buildings in terms of design, construction and cost. Before starting the construction of a hotel, it is important to have a clear understanding of the cost budget required for the structure of the building, including structural aspects such as foundations, walls and roofs. The purpose of this study is to determine the volume of each work item, determine the value of the cost budget plan required for the construction of the Nunusaku Hotel building and the estimated time for the implementation of the construction of the Nunusaku Hotel building.The methods used in this study are literature and quantitative methods. The literature method is by using the literature method, in collecting data and information through books and references as well as internet media in the design of RAB. The data collection method is in the form of a basic price. In the calculation of the Nunusaku Hotel Building Cost Budget Plan, using Work Unit Price Analysis (AHSP) for the Ministry of Public Works Cipta Karya Sector on 2023, and using the unit price of wages and materials for the city of Ambon in 2023.Based on the results of the calculation of the Nunusaku Hotel Building Cost Budget Plan, the value of the cost budget plan was obtained of Rp. 1,992,254,000.00 (One Billion Nine Hundred Ninety Two Million Two Hundred Fifty Four Thousand Rupiah), the implementation time required for the construction work of the structure of the Nunusaku hotel building is 24 weeks (6 months.)
Evaluasi Bangunan Bawah Jembatan Wai Lan Pada Desah Naiwel Kecamatan Werinama Kabupaten Seram Bagian Timur Sopacua, Samuel A.; Talakua, Elisabeth; Hutubessy, Vector R. R.
Jurnal Penelitian Multidisiplin Bangsa Vol. 1 No. 11 (2025): April
Publisher : Amirul Bangun Bangsa Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpnmb.v1i11.393

Abstract

Pulau Seram, Khususnya ruas ajan trans seram menuju kabupaten seram bagian timur, mengalami kendala transportasi akibat kurangnya sarana, seperti akses jalan yang belum memadai dan keberadaan sungai memisahkan desa-desa seiring perkembangan teknologi transportas, pemerintah provinsi Maluku merencanakan pembangunan jembatan beton untuk meningkatkan akses transportasi. Namun, terdapat masalah pada bangunan bawah jembatan, dimana galian pondasi tidak sesuai dengan data tanah yang dapat mempengaruhi daya dukung jembatan. Penelitian ini bertujuan untuk mengevaluasi bangunan bawha jembatan guna memastikan keamanan dan kestabilan jembatan Dari hasil penelitian ini di rencanakan panjang dimensi jembatan, panjang jembatan 15 m dengan lebar jembatan 9,50 m dengan jenis pondasi yang di gunakan adalah pondasi sumuran dengan kedalaman pondasi 4 m. Kemudian dilakukan pengecekan terhadap stabilitas guling sebesar 6,707 kemudian pengecekan terhadap stabilitas geser sebesar 4,435393 dan pengecekan terhadap stabilitas amblas 1,5807   1,6334 dari ke 3 hasil pengecekan pada pondasi sumuran ini dapat di simpulkan bawah semua hasil pengecekan memenuhi syarat faktor keamanan (aman).