ANALISA PERBANDINGAN BIAYA MENGGUNAKAN METODE SNI DAN METODE BOW BESERTA PERHITUNGAN WAKTU DAN IDENTIFIKASI SDM, MUTU, K3 PADA GEDUNG KANTOR GRAHA UMKM DI KOTA PONTIANAK: COST COMPARISON ANALYSIS USING SNI AND BOW AND TIME CALCULATION AND IDENTIFICATION SDM, QUALITY, K3 METHODS IN BUILDING GRAHA UMKM OFFICE IN PONTIANAK CITY Buih, de Kamilla; Rianto, Siswo; Arianti, iin
RETENSI Vol. 1 No. 1 (2020): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v1i1.233

Abstract

The analysis is a detailed observation on the work by describing the constituent components for further study which is the meaning of. The thing that is needed in analyzing, of course, is making cost calculations using the SNI and BOW methods, calculating time, identifying occupational safety and health, identifying workers, identifying the quality of workbased on data planning and implementation.
PERENCANAAN MANAJEMEN PROYEK KONSTRUKSI PADA KANTOR KESYAHBANDARAN DAN OTORITAS PELABUHAN KABUPATEN KETAPANG: PERENCANAAN MANAJEMEN PROYEK KONSTRUKSI PADA KANTOR KESYAHBANDARAN DAN OTORITAS PELABUHAN KABUPATEN KETAPANG utami, sonia; Arianti, iin; Konstatinus, ayub; Cahyani, yasnita
RETENSI Vol. 2 No. 1 (2021): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v2i1.426

Abstract

Ketapang Regency is one of the areas that has a considerable influence on the socio-economicdevelopment of the community, especially sea transportation. In facilitating the supervision of theentry and exit of sea transportation at the port of Ketapang Regency, it is necessary to build theHarbormaster Office and the Port Authority. In the construction of the Ketapang RegencyHarbormaster and Port Authority Office, it is necessary to have good and correct planning in terms oftime, cost, quality, human resources, and an environmental occupational safety and healthmanagement system so that the project can be completed on time and efficiently. The method used inthe management of this Construction Project is the SNI method covering five aspects, namely costmanagement in the form of a budget plan, time management in the form of a barchart, S curve andnetwork planning, human resource management in the form of labor requirements, qualitymanagement in the form of a work plan of requirements. requirements and management systems foroccupational safety and health in the form of the number of personal protective equipment required.The costs needed for the construction of the Kesyahbandaran Office and the Port Authority ofKetapang Regency are 9,129,893,000.00 within a period of 24 weeks 180 calendar days, with aworkforce requirement of 113 workers per week, a work plan with conditions as a reference, as wellas 78 pieces of personal protective equipment needed.
RENCANA ANGGARAN BIAYA PEMBANGUNAN PUSKESMAS 2 LANTAI KECAMATAN BOYAN TANJUNG KABUPATEN KAPUAS HULU: RENCANA ANGGARAN BIAYA PEMBANGUNAN PUSKESMAS 2 LANTAI KECAMATAN BOYAN TANJUNG KABUPATEN KAPUAS HULU Sumarni, Sumarni Sumarni; Karlina, Heni; Arianti, Iin; Rianti, Rika
RETENSI Vol. 4 No. 2 (2024): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v4i2.718

Abstract

ABSTRACT The construction of a 2-story health center in Boyan Tanjung District, Kapuas Hulu Regency is a strategy implemented in managing the process of building health facilities. This journal involves project management for the construction of a 2-story health center in Boyan Tanjung District. When planning construction management this project will produce work volume calculations, cost budget plans (RAB), bar charts, S curves, labor requirements tables, identification of potential hazards, personal protective equipment determination tables. As well as using appropriate and effective construction methods to encourage successful implementation. Judging from the methods used, namely secondary data in the form of work drawings, analysis of unit prices for work according to government regulations and housing prices, wages and materials according to mayoral regulations, and literature in the form of books and journals. The results of the planning method above, obtained a budget plan of Rp. 5,561,427,000.00, project work time plan for 14 weeks based on the S curve or ±98 calendar days, contains quality specifications and how to carry out each job as well as the tools and materials used, the maximum workforce required is 33 people, identification of potential hazards shows the level value severity and frequency of work accidents and requires a work safety plan cost of Rp. 45,968,250.00. Keywords: planning, management, project, construction, effectiv