Claim Missing Document
Check
Articles

Found 23 Documents
Search

Analisis Kinerja Jembatan Timbang Di Unit Pelaksana Penimbangan Kendaraan Bermotor (UPPKB) Talang Kelapa Syadza Yasminra; Ely Mulyati; Achmad Syarifudin; Anggi Purnama Sari Dewi
KOLONI Vol. 5 No. 3 (2026): SEPTEMBER 2026
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v5i3.1430

Abstract

Control of freight vehicle loads is an important aspect of maintaining pavement performance, traffic safety, and vehicle compliance with applicable regulations. This study aims to analyze the level of compliance and load violations of freight vehicles with regard to the provisions on the Permitted Gross Weight (Jumlah Berat yang Diizinkan/JBI) at UPPKB Talang Kelapa. The research method employed was descriptive quantitative with a case study approach. The research data were obtained from the weighing results of 181 vehicles in December 2025, as well as questionnaire data using a Likert scale to assess the effectiveness of supervision of freight vehicles. The results showed that the level of vehicle compliance with the JBI provisions was categorized as good, accounting for 79.56%, or 144 vehicles. Meanwhile, overloaded vehicles accounted for 20.44%, or 37 vehicles. The observations also indicated an increasing trend in vehicle compliance each week. Based on vehicle type, open-bed trucks contributed the highest number of overload violations in terms of quantity, with 20 violations out of 78 vehicles. Meanwhile, tanker trucks had the highest proportion of violations, at 61.11%. The questionnaire analysis resulted in a score of 83.11%, which was categorized as very good. These findings indicate that supervision at UPPKB Talang Kelapa is effective in controlling overloaded vehicles and supporting improved compliance with the JBI provisions.
Analisa Kehilangan Air Pada Pintu Klep Di Saluran Nabila Shafa Maulida; Achmad Syarifudin
KOLONI Vol. 5 No. 3 (2026): SEPTEMBER 2026
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v5i3.1457

Abstract

Water loss in open channels is one of the problems that can affect the efficiency of water distribution. The use of a sluice gate as a flow control structure can cause changes in flow characteristics and discharge along the channel. This study aims to determine the flow characteristics in an open channel using a sluice gate and to analyze the effect of gate opening variations on water loss. The study was conducted experimentally using a 6 m long flume at the Hydraulics Laboratory of the Civil Engineering Study Program, Universitas Bina Darma. The gate opening variations were 1 cm, 1.5 cm, and 2 cm, representing 25%, 50%, and 75% openings, respectively. The measured parameters included discharge, flow velocity, water depth, Reynolds number, and Froude number. Water loss was analyzed based on the difference between the inlet and outlet discharge. The results showed that the inlet discharges were 1.050 m³/s, 1.230 m³/s, and 1.210 m³/s, while the outlet discharges were 0.028 m³/s, 0.041 m³/s, and 0.047 m³/s, respectively. Based on the difference between the inlet and outlet discharge, the water losses were 1.022 m³/s, 1.189 m³/s, and 1.163 m³/s, respectively. The Reynolds number analysis indicated that the flow before and after the sluice gate was turbulent, while the Froude number analysis indicated that the flow remained supercritical. Thus, variations in sluice gate opening resulted in differences in discharge and water loss under the tested flow conditions.
Analisis Kerusakan Perkerasan Jalan Menggunakan Metode Pavement Condition Index (PCI) (Studi Kasus: Jalan MP. Mangkunegara Kota Palembang) Leobryan Edyefson Simanjuntak; Achmad Syarifudin; Ely Mulyati
Journal of Sustainable Civil Engineering (JOSCE) Vol. 8 No. 02 (2026): JOSCE: Journal of Sustainable Civil Engineering (PROSES)
Publisher : LPPM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47080/josce.v8i02.4950

Abstract

This study evaluates the pavement condition of MP. Mangkunegara Road, Palembang City, using the Pavement Condition Index (PCI) method based on ASTM D6433 through visual field surveys. The 2.40 km study section was divided into 24 sample units, each 100 m long. Pavement distresses were identified, measured, and analyzed based on distress type, severity, extent, and density to determine the PCI value for each sample unit. The observed distresses included longitudinal cracks, transverse cracks, edge cracks, alligator cracks, potholes, and surface undulations. The results show that PCI values ranged from 58 to 93, with an average PCI of 80.63, indicating that the overall pavement condition was categorized as Good. Of the 24 sample units, 9 units (37.50%) were classified as Very Good, 11 units (45.83%) as Good, and 4 units (16.67%) as Fairly Good. The lowest PCI values were identified at STA 0+400–0+500, STA 0+900–1+000, STA 1+400–1+500, and STA 1+900–2+000, with PCI values of 68, 65, 60, and 58, respectively. The main contribution of this study is the identification of pavement condition variations along the study section and the determination of locations requiring prioritized maintenance based on unit-level PCI values rather than relying solely on the average pavement condition. Based on these findings, routine and preventive maintenance, crack sealing, pothole patching, and localized pavement repairs are recommended to prevent further deterioration and maintain pavement serviceability.